Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
30 Jun 2026, 1:30 pm2d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
UPSCIDCO ORAI
Upgradation work in Parishadiya Composite School, Majith Block Rampura, Jalaun, U.P.
2026_SCIDC_1162209_1
77/EE/Orai/ET/2026-27
Open Tender
Civil Works - Others
120 days
Majith Block Rampura, U.P.
Please Refer the tender document
2 documents required · 2 mandatory
₹1,652
Yes
UPSCIDCO
₹23,000
Yes
20 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
20 Jun 2026 - 30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Construction of Additional Class Room 01 Nos | ||||||
| 1.01 | Clearing of ground for layout and removal of foreign materials with disposal upto a distance of 50 m out side the peripheri of area cleared including labours t&p etc complete. | - | Sqm | 1 | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Layout | - | Sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Earth work in Excavation in trenches for foundations in ordinary soil (Loam, clay or sand) including lift up to 1.50 m and lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as per directed by the Engineer i.e. within a lead of 50 m. | - | cum | 0.4 | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Providig and laying cement concrete 1:4:8 (1cement:4 c.sand: 8 stone aggregate 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete also including cost of form work in foundation and floors. | - | cum | 0.2 | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Rcc work with cement approved coarse sand and 20 mm approved stone ballast in the proportion of 1:1.5:3 including necessary centering and shuttering etc excluding supply of steel but including its binding with binding wire also including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete binding wire to be supplied by contractor free of cost. Foundation | - | Cum | 1 | - | BI01010001010000000000000515BI0100001117 |
| 1.06 | Rcc work with cement approved coarse sand and 20 mm approved stone ballast in the proportion of 1:1.5:3 including necessary centering and shuttering etc excluding supply of steel but including its binding with binding wire also including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete binding wire to be supplied by contractor free of cost. Column | - | cum | 1 | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Rcc work with cement approved coarse sand and 20 mm approved stone ballast in the proportion of 1:1.5:3 including necessary centering and shuttering etc excluding supply of steel but including its binding with binding wire also including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete binding wire to be supplied by contractor free of cost. Lintel bend & Sunshade | - | cum | 1 | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | Rcc work with cement approved coarse sand and 20 mm approved stone ballast in the proportion of 1:1.5:3 including necessary centering and shuttering etc excluding supply of steel but including its binding with binding wire also including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete binding wire to be supplied by contractor free of cost. Beam | - | cum | 0.6 | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Rcc work with cement approved coarse sand and 20 mm approved stone ballast in the proportion of 1:1.5:3 including necessary centering and shuttering etc excluding supply of steel but including its binding with binding wire also including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete binding wire to be supplied by contractor free of cost. Slab | - | cum | 0.6 | - | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
majithnitt.pdf
Tender Documents • 2.01 MB
BOQ_2178431.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid