Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹1,247.95 (0.50%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.5 L
EMD Value
₹7,500
Closing Date
30 Jul 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const of culvert/slab at Bajar Mohalla Ward No.06 n/h of nazir ah bajad
2026_RDPR_316802_19
NIT NO 67 OF 2026-27 ADF TARATHPORA
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹7,500
10 Aug 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
20 Jul 2026 - 20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and filling of nallah muck including levelling compacting all complete | 17 | Cum | 900 | ₹15,300 |
| 2 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork | 1 | sqm | 0.01 | ₹0.01 |
| 3 | Suspended floors, roofs, landings, balconies and access platforms. | 39.06 | sqm | 718.2 | ₹28,052.89 |
| 4 | Reinforced cement concrete work in beams ,suspended floors ,roofs having slope upto 15degree landings, shelves and spiral stair cases upto five level incluidng curing but excluding the cost of centering and shuttering and reinforcement in 1:1.5:3 (1 Cement :1.5 coarse sand : 3graded stone aggregate 20mm nominal size crushed stone aggregates ) including Head load if any | 8.91 | cum | 9,821.85 | ₹87,512.68 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete (TMT Bars). | 891 | kg | 115.35 | ₹1,02,776.85 |
| 6 | Structural steel work weldded in builtup section i/c cutting , hoisting , fixing in position and welding framed work and applying a priming coat of approved steel primer and painting | 90 | kg | 123 | ₹11,070 |
| 7 | Carraige of Sand for an avg. lead of 20 Kms by MT | 4.01 | cum | 409 | ₹1,640.09 |
| 8 | Crushed stone aggregate for an avg. lead of 10 Kms by MT | 8.02 | cum | 279 | ₹2,237.58 |
| 9 | P/F of information sign board with photograph and dewatering of the trenches | 1 | nos. | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1035097.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .