Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.3 CrRejected-Finance | ₹1.3 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.3 CrRejected-Finance | ₹1.3 Cr | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.4 CrRejected-Finance | ₹1.4 Cr | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹1.5 CrRejected-Finance | ₹1.5 Cr | L-5 | Rejected-Finance L-5 |
Tender Value
₹1.6 Cr
EMD Value
₹10.3 L
Closing Date
27 Apr 2026, 12:00 pmClosed
SE Banda Circle PWD Banda
SE Banda Circle PWD Banda
Construction of Village Pachnehi to Banda Tindawari Fatehpur Via Airtel Tawor Link Road under Bundelkhan Vikas Nidhi (Rajyansh) Yojana (5 year Maintenance)
2026_CEBAN_1138253_4
1671/35C-Banda Circle/2026-27 Dt. 04-04-2026
Open Tender
Civil Works
365 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹10.3 L
Banda
7 May 2026
18 Apr 2026
27 Apr 2026
18 Apr 2026
27 Apr 2026
18 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4 | 1 | cum | 1 | ₹1 |
Construction of Subgrade with Stablization of Soil with 2% slaked lime
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% staked lime including its mixing with rotabator complete. Two Layer | - | cum | - | - | |
Construction of granular Sub Base by providing well graded material, spreading in uniform layers with motar grader on prepared surface mixing by mix in place method with 2% cement (OPC) with rotavator at OMC, and compacting with smooth wheel rollar to achieve the desired density complete as per technical Specification Clause 401 | 1 | cum | - | - | |
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC and 4% cement (OPC) in mechanical mixer (pug mill)-carriage of mixed material by tipper to site, laying in uniform layer in sub base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achive the desire density including lighting, barricading and maintenance of diversion etc as per Table 400.11 & 400.12 and Technical Specification Clause 405.00 | - | cum | - | - | |
Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 to 0.45 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - | |
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Claues 508 | - | sqm | - | - | |
Providing and laying seal coat Type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using As per Technical Specification Clause 510 | - | sqm | - | - | |
Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) | - | cum | - | - | |
Sand filling in plinth including supply of necessary quantity of sand from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | - | cum | - | - | |
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | - | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
T2.pdf
Tender Documents • 1.74 MB
BOQ_2125413.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid