Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC NO 5F FIRST STREET SENGUNTHAPURAM POST JEYANKONDAM UDAIYARPALAYAM TALUK ARIYALUR DISTRICT 621 802 | JEYANKONDAM | ARIYALUR | TAMIL NADU | 621802 | ₹2.8 Cr Quoted ₹3.0 Cr | L1 | Accepted-AOC Agreement Accepted |
| 2 | L2₹3.1 Cr+₹11.1 L (3.75%)Rejected-Finance | ₹3.1 Cr+₹11.1 L (3.75%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹3.2 Cr+₹19.6 L (6.62%)Rejected-Finance | ₹3.2 Cr+₹19.6 L (6.62%) | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | THANGAM BUILDERS L2 | SKR Constructions L3 | SELVA BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 474 | M3 | 272 ₹1,28,928 | 280 ₹1,32,720 | 258 ₹1,22,292 Lowest |
| 2.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 71 | M3 | 2,095 ₹1,48,745 | 2,154 ₹1,52,934 | 1,986 ₹1,41,006 Lowest |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 283 | M3 | 512 ₹1,44,896 | 526 ₹1,48,858 | 485 ₹1,37,255 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 32 | M3 | 6,044 ₹1,93,408 | 6,215 ₹1,98,880 | 5,731 ₹1,83,392 Lowest |
| 5.00 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. In Cement Mortar 1:5 For Foundation and Basement | 26 | M3 | 8,004 ₹2,08,104 | 8,231 ₹2,14,006 | 7,589 ₹1,97,314 Lowest |
| 6.00Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. In Cement Mortar 1:6 | ||||||
| 6.01 | For Foundation and Basement | 67 | M3 | 7,933 ₹5,31,511 | 8,157 ₹5,46,519 | 7,521 ₹5,03,907 Lowest |
| 6.02 | Superstructure in Ground floor | 112 | M3 | 8,031 ₹8,99,472 | 8,259 ₹9,25,008 | 7,615 ₹8,52,880 Lowest |
| 6.03 | Superstructure in First floor | 80 | M3 | 8,230 ₹6,58,400 | 8,463 ₹6,77,040 | 7,803 ₹6,24,240 Lowest |
| 6.04 | Superstructure in Second floor | 75 | M3 | 8,429 ₹6,32,175 | 8,667 ₹6,50,025 | 7,991 ₹5,99,325 Lowest |
Tender Value
₹2.8 Cr
EMD Value
₹1.5 L
Closing Date
28 Oct 2025, 3:00 pmClosed
The Superintending Engineer, P.W.D., Trichy
Office of the Superintending Engineer, P.W.D., Buildings (C and M), Circle, Trichy-1
Construction of Integrated Monitoring Office Building for the Officers of joint Director and Assistant Director of Animal Husbandry at Ariyalur in Ariyalur District.
2025_PWD_615218_1
Tn.No.31/2025-2026/07.10.2025
Open Tender
Civil Works - Buildings
Lump-sum
240 days
Ariyalur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.5 L
16 Mar 2026
17 Oct 2025
29 Oct 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
ADJDcondition.pdf
Tender Documents • 2.02 MB
BOQ_735037.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .