Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 LAccepted-AOC COLABA MUMBAI | L1 | Accepted-AOC QUOTED L1 | |
| 2 | L2₹55.2 L+₹2.5 L (4.81%)Rejected-AOC | L2 | Rejected-AOC NOT ADMITTED | |
| 3 | L3₹57.2 L+₹4.6 L (8.72%)Rejected-AOC COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L3 | Rejected-AOC NOT ADMITTED | |
| 4 | L4₹58.2 L+₹5.5 L (10.5%)Rejected-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L4 | Rejected-AOC NOT ADMITTED |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
3 Jan 2022, 6:00 pmClosed
CWE (SUBS) MUMBAI
Commander Works Engineer Subs NCHC Powai Bhandup Post Office Mumbai 400 078
MANUAL RESCUE AND OPERATION RESCUE AND COMPREHENSIVE MANUAL RESCUE AND OPERATION RESCUE AND COMPREHENSIVE REPAIRS MAINT OF CERTAIN LIFTS UNDER GE NW MANKHURD
2021_MES_493341_1
8812/E8
Open Tender
Civil Works
Item Rate
330 days
MANKHURD
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE (NW) MANKHURD
₹1.0 L
Yes
20 Jan 2022
8 Dec 2021
6 Jan 2022
8 Dec 2021
3 Jan 2022
24 Dec 2021
Amount
MANNING & OPERATION AND COMPREHENSIVE MAINTENANCE Manning & Operation of Two lifts from 0600 to 1400 and 1400 hrs to 2200 hrs in two shifts operated by one operator per shift for both the lifts (one operator for two lifts per shift shall be employed) on all days including holidays and during all type of weather/climatic conditions, providing rescue to the trapped person, maintaining the lifts and connected equipments and accessories including lift room in clean and tidy condition during the operation period and also Manning & Operation of Lifts in case of failure of commercial supply by running of DG Set installed within the vicinity meant for lift supply and Comprehensive maintenance for Both the Lifts: (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lifts and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lifts of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed, Location:- 08 passenger lift and 13 passanger lift, both the Lifts of Make OTIS, serving Ground + 7 Upper Floors and installed at Vidhut Cheetah, B Camp, P-56.
MANNING & OPERATION AND COMPREHENSIVE MAINTENANCE Manning & Operation of Two lifts from 0600 hrs to 2200 hrs in two shifts operated by one operator per shift for both the lifts of Godaveri Bldg and one lift of Kaveri Bldg (One operator for three lifts per shift shall be employed) on all days including holidays and during all type of weather/climatic conditions, providing rescue to the trapped person, maintaining the lifts and connected equipments and accessories including lift room in clean and tidy condition during the operation period and also Manning & Operation of Lifts in case of failure of commercial supply by running of DG Set installed within the vicinity meant for lift supply and Comprehensive maintenance for both the lifts of Godaveri lift only : (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lifts and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lifts of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed . Location:- 10 passenger lift and Goods Lift (Capacity 2000Kg), both of the lifts of Make OTIS, serving Ground + 06 Upper Floors and installed at NOFRA area.
Comprehensive maintenance (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lift and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lift of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed, Location :- 08 passenger lift serving Ground + 5 Upper Floors, OTIS Make, installed at KAVERI BUILDING (NOFRA) P-9.
Comprehensive maintenance (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lift and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lift of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed,Location :- 08 passenger lift of make : THYSSENKRUP ELEVATORS serving Ground + 6 Upper Floors and installed at Single officer Accn.
Comprehensive maintenance (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lift and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lifts of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed, Location :- 08 passenger lift serving Ground + 5, Upper Floors, MONARCH Make, installed at DSC Block (Bldg No. P-7).
Comprehensive maintenance (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lift and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lift of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed, Location:- 08 passenger two lift, both the Lifts of Make KONE, serving Ground + 5 Upper Floors and installed at Release Sailors Block
Comprehensive maintenance (Routine , preventive , breakdown) as per attached format (Daily, weekly, fortnightly, monthly, qtrly, half yearly, yearly maintenance) and keeping the lift and its connected equipments in servicable condition round the clock (on all days including holidays) and during all type of weather/climatic conditions for the undermentioned lift of any type (geared or gearless, Auto or manual operated, with or without VVVF drive system, with or without ARD system etc) and also maintaining the necessary documents complete all as specified and directed, Location:- Two Goods Lift (Capacity 2000 Kg & 3000 Kg), both the Lifts of Make THYSSENKRUP ELEVATORS, serving Ground + 2 Upper Floors and installed at NSD Store house.
Dismantling and taking out u/s old control panel and control wiring and S & F new control panel in hinged MS powder coated cabinet, with control wiring comprising with multiple micro controlled programmed chip based, controlled by pulse modulation, complete with all safeties such as thermal over load protection , over current protection, auto phase reverse link to each other in net work, and compitable to 5.0 KW / 7.5 HP capacity VVVF drive including proper connection with proper lugs, terminal connectors screws and motor connection with galvanished sheet trucking 24 SWG including wiring of main motor with suitable size of standard copper cable etc complete all as specified and as directed by Engr-in-Charge.
Disconnecting and Taking out existing unserviceable COP assembly and supply and fixing new car operating panel (COP) assembly with and including illuminated push button for floor position, alarm, nonstop, door stop, door close, cabin fan, cabin light stop, attendant out key etc, direction indicator of 7 segment display with SPI card on stainless steel face plate duly controlled and electric connection, also including necessary wiring for laminated push button of each floor, cutting wall, making good the surfaces to match with the existing surfaces, suitable for 08 Passenger lift complete all as specified and directed.
Dismantling and Taking out unserviceable old landing push button box alongwith illuminated call button with control wiring & in lieu supplying and fixing new landing push button box alongwith illuminated call button and LED display indicator with CPI card on stainless steel face plate with control wiring for 08 Passenger lift, complete all as specified and directed.
Dismantling & Taking out defective unserviceable main drive (any type) from existing control panel and supply and fixing new variable voltage, variable frequency drive (VVVF) of make Yasakawa/Fuji Japan/ Schneider upto 7.5 KW suitable for EXISTING LIFT and including making necessary electric connection, complete all as specified and directed.
Dismantling and taking out old unserviceble set of 2 Nos car door shutters, headers, hangers, door drive unit with full beam infrared sensor upto full length of car door, aluminium sill, VVVF door drive unit for motor complete with all accessories, disconnecting control connections from car cabin, supplying and fixing new set of 2 Nos car door shutters power operated, centre opening by horizontal sliding, flush type panels of 18 SWG stainless steel with hairline finish (N-304) complete with and including providing new headers, hangers, door drive unit with full beam infrared sensor upto full length of car door, aluminium sill, VVVF door drive unit for motor complete with all accessories, making control connections etc. for lift 08 passenger lift , complete all as specified and directed.
Dismantling and taking out old unserviceble set of 02 Nos landing door shutters, hangers, gate lock, aluminium sill etc. Supply and fixing new set of 2 Nos landing door shutters, power operated, centre opening by harizontal sliding, flush type panels of stainless steel 18 SWG with hair line finish (N-304) complete with and including provision of new hangers, gate lock, aluminium sill etc as required for entire completion for ift 08 passenger lift , complete all as specified and directed.
Dismantling existing cabin side panels and supply and fix side enclosures on three side of cabin made from SS 304 grade sheet, 1.2 mm thick, hair line finish, and stainless steel 1.2 mm thick sheet etc suitable lift cabin having 8 & 13 passenger capacity, including safety instruction, Do & Don't board, emergency Numbers etc for as per exisiting width & depth for lift 08 passenger lift , complete all as specified and directed
Dismantling existing cabin MS Platform and ceiling and supply and fix new platform made from 3mm thick formed 100 x 50 mm channel, covered with 5 mm thick aluminium checkered plate on MS Sheet and ceiling made from 2 mm thick CRCA Sheet, in powder coated finish, as per exisiting width & depth for lift 08 passenger lift , complete all as specified and directed
Dismantling / taking down carefully existing false ceiling with fan grill & LED and in lieu providing new false ceiling made of 1.2mm thick stainless steel with hair line finish (N-304) fitted with aluminium square fan grill & 05 watt LED at four corners, suitable for lift 08 passenger lift , complete all as specified and directed
Taking out existing shaft wiring and M&L for provision of shaft wiring 1.00 sqmm stranded copper conductor PVC insulated 1100 Volts grade FRLS including copper earth wire of 1.00 sq mm drawn through and including 24BG thick GI Trough with cap of suitable size (Trucking) in hoist way upto lower limit switch at ground floor to control following equipments from the control panel etc complete all as specified and directed Make ; Finolex / Polycab / Incab. a) Mid way Iunction of travelling cable b) All limit speed control switches c) All safty switches and fire man switch d) All operating panel & display
Taking out old unservicable travelling cable from hoist way and supply and fixing new travelling cable PVC insulated, 12 core, flat / round type with stranded copper conductor, 1100 volts grade of size 0.75 sqmm, conforming to relavant IS with and including crimping with lugs of appropriate thimbles, suspended type, freely moveable with car cabin up & down between ground & upper floors including necessary proper connection etc with mid way junction and other connections required in circuit, complete all as specifed and directed Make : Finolex / Polycab/Incab.
Taking down existing unserviceable ARD with 6 Nos 12 Volts, 24 AH batteries from machine room and S&F new Automatic Rescue Device (ARD) including relays, PCB cards/dioders card and 6 Nos. maintenance tree sealed batteries of 12 volts, 24 AH (Make Exide/Amron), complete all as specified and directed
Taking down existing unserviceble batteries from machine room and in lieu S & F new sealed maintenance free (SMF) batteries of 12 volts, 17 AH (Make : Exide/Amron), making necessary connections with and including copper lead to connect brass terminals of batteries etc, complete all as specified and directed by the Engr-in-Charge.
Dismantling and taking out old architrave from landing door complete all as specified and directed by Engineer - in - charge.
Material & labour for 16-18mm thick mirror polished black granite slab, machine cut mirror polished cladding with chamfered/rounded edges approved decorative design including necessery PCC work granite slab & jointing in cement slurry and pointed in white cement mixed with pigement to match with shade of granite for lifts architrave at all floors complete all as specified and directed by Engr-in-charge.
Taking out existing unserviceable cabin fan and providing new cabin fan, non-oscilating type, axial flow, single speed, 300mm sweep, 240 volt, with grill, (Make : EMCO/VBM/CINI), complete all as specified and directed.
Shree Elevator Engineering Co.
Escon Elevators Pvt Ltd
shakti engineering and electrical works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .