| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.8 LRejected-AOC R R ALLI CHINNAMPALLI | DHARMAPURI | TAMIL NADU | ₹19.8 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Addmited |
| Sl No | Description | Qty | Unit | A.Shanmugam L2 | Selvam m L1 |
|---|---|---|---|---|---|
| 1.00Construction of Community Hall Building at Mottupatti sathishwaran Temple Near H/O Sathiyanathapuram | |||||
| 2.00 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 13.03 | Cum | 263.78 ₹3,437.05 | 263.78 ₹3,437.05 |
| 3.00 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 10.61 | Cum | 5,735.93 ₹60,858.22 | 5,735.93 ₹60,858.22 |
| 4.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works | 9.02 | Cum | 9,627.49 ₹86,839.96 | 9,627.49 ₹86,839.96 |
| 5.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams,
staircase steps, etc. which require only nominal strutting using mild
Grade Beam
Coloumn Upto Grade | 33.06 | Cum | 5,951.19 ₹2.0 L | 5,951.19 ₹2.0 L |
| 6.00 | Column Upto Roof
Column Upto Lintel
Lintel Allround | 48.07 | Cum | 5,951.19 ₹2.9 L | 5,951.19 ₹2.9 L |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1 | mt | 91,787.94 ₹91,787.94 | 91,787.94 ₹91,787.94 |
| 8.00 | Brick work in C.M. 1:5 (One cement and five sand) mixing with water proofing compound 2% by weight of cement using second class bricks of size 8 3/4 x 4 1/4 x 2" etc., complete. | 12.61 | Cum | 6,243.62 ₹78,732.05 | 6,164 ₹77,728.04 |
| 9.00 | Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing,
curing etc. | 114.29 | Sqm | 290.41 ₹33,190.96 | 289.41 ₹33,076.67 |
| 10.00 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum | 212.38 | Cum | 169.91 ₹36,085.49 | 169.91 ₹36,085.49 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Development Officer (VB), Pennagaram Block
Block Development Officer (VB), Pennagaram Block
Construction of Community Hall Building at Mottupatti Sathishwaran Temple Near H/O Sathiyanathapuram
2026_RDTN_658860_1
Roc.No.243/2026/A3 Dt.06.02.2026 MLACDS 2025-2026 P02
Open Tender
Civil Works
120 days
Block Development Officer (VB), Pennagaram Block
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹20,000
Yes
Block Development Officer (VB), Pennagaram Block
21 May 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
18 Feb 2026
17 Feb 2026
17 Feb 2026
Construction of Community Hall Building at Mottupatti sathishwaran Temple Near H/O Sathiyanathapuram
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild Grade Beam Coloumn Upto Grade
Column Upto Roof Column Upto Lintel Lintel Allround
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Brick work in C.M. 1:5 (One cement and five sand) mixing with water proofing compound 2% by weight of cement using second class bricks of size 8 3/4 x 4 1/4 x 2" etc., complete.
Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Towards cost and supply of Tubeler channel including all charges 65mm GI Sqr. Pipe
Roofing with PPGI sheet of 0.47mm thick including cost of material and labour for fixing etc. cmplete. For 10m2
Distembering two coats with best approved distember with priming one coat over New cement plastered wall suface including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion Painting two coats over New Cement Plastered surface using Exterior Emulsion Paint including with Priming one coat cost and conveyance of paint and all labour charges etc complete
Towards fixing labour charges for welding charges
Provision for Electrification arrangements Light & Fan Point SD.no.20
Supply&Fixing of Tube Light SD.no.88
Supply & Fixing of Fan SD.no.110
Power Plug Point SD.no.39
S & Fixing DP Main swetch SD.no.142
S & FixingTNEB Meter board SD.no.125
Service pipe SD.no.70
Service Connection SD.no.65
Service Charge to EB
Cubical Arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.93 MB
01-TechBid.pdf
Tender Documents • 0.65 MB
BOQ_790455.xls
BOQ • 0.24 MB
01-Pri-Bid.pdf
Additional Documents • 0.40 MB
Download all tender documents and submit your bid