| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹18.2 L+₹76,050 (4.37%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹18.3 L+₹87,400 (5.02%)Rejected-Finance NARMADA COLONY BARADARI CHOURAHA MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹22.6 L+₹5.2 L (30.1%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹23.5 L+₹6.1 L (35.0%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | somyaenterprises L2 | M/s Sagar Construction L1 | M/S YOGANSH CONSTRUCTION CO. L5 | M/s Tirupati construction L3 | AUTOMATION AND SWITCHGEAR PANELS L6 | Aaradhya Ables Group L7 | BABA DEVELOPERS L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for transportation of transformer from site/E & M yard to workshop for repair of capacity 50 to 500 KVA complete including disconnection of transformer any make indoor/outdoor type from LV/HV side including disconnection of earthing GI strips and taking down transformer from plinth/04 pole structure/02 pole structure with the help of chain pulley/crane including megger test, ratio test, magnetic balance test, short circuit test and reinstallation the transformer after repair to its original position and making all LV/HV connections including earthing and testing complete all as specified and directed by Engineer-in-Charge.
Note:- Shifting of transformer from site/yard to workshop and return back from workshop to site/yard shall be measured as single unit. Necessary tools and equipments with labour for shifting of the transformer and transportation to workshop and back deemed to be included in the quoted rate. | 13 | Each Job | 8,500 ₹1,10,500 | 7,000 ₹91,000 | 10,000 ₹1,30,000 | 5,000 ₹65,000 | 1,800 ₹23,400 Lowest | 6,000 ₹78,000 | 5,000 ₹65,000 |
| 2.00Material and labour for draining out transformer oil from the transformer of any make indoor/out door and store in a clean barrel for re-use and disconnection of internal electrical connection by taking out the top cover complete, cleaning of tank, removal of sludge etc by lifting the core with complete LV/HV coil of transformer and segregating to serviceable and unserviceable coils shall be kept aside for reuse after complete varnishing and testing of each coil including removal of complete core and accessories such as HV/LV bushings with metal parts, oil temp indicator, winding temp indicator and disconnection of tap changer. Assembling of yoke fitting, assembling of LV/HV coil in completely intact position over the CCSI laminated core the HT coils shall be fixed over the LV coils by providing the insulation barriers and making the assembly complete in intact position (insulation material shall be measured and paid separately) including assembling of core mounted on channel connecting all the internal connections, soldering brazing of HV/LV connections by silver electrodes including replacement of leads complete by providing tubular insulation of tap changer assembly and its connections and lowering of complete assembly in tank with suitable locking arrangements re fixing the top cover of transformer including the other accessories and making the transformer leak proof complete all as specified and directed for the following capacity :- | ||||||||||
| 2.01 | 50 KVA to 100 KVA | 3 | Each Job | 5,000 ₹15,000 | 700 ₹2,100 Lowest | 1,900 ₹5,700 | 7,000 ₹21,000 | 2,200 ₹6,600 | 5,000 ₹15,000 | 4,000 ₹12,000 |
| 2.02 | 100 and upto 250 KVA | 5 | Each Job | 5,000 ₹25,000 | 800 ₹4,000 Lowest | 1,900 ₹9,500 | 8,000 ₹40,000 | 2,500 ₹12,500 | 6,000 ₹30,000 | 4,000 ₹20,000 |
| 2.03 | 250 KVA upto 500 KVA | 4 | Each Job | 4,500 ₹18,000 | 1,000 ₹4,000 Lowest | 2,800 ₹11,200 | 10,000 ₹40,000 | 2,400 ₹9,600 | 6,000 ₹24,000 | 5,000 ₹20,000 |
| 3.00 | Material and labour for winding of HV/LV coils of transformer DPC copper winding wire grade of existing gauge and size complete all as specified and directed. | 800 | Kg | 450 ₹3,60,000 Lowest | 480 ₹3,84,000 | 640 ₹5,12,000 | 475 ₹3,80,000 | 800 ₹6,40,000 | 600 ₹4,80,000 | 500 ₹4,00,000 |
| 4.00 | M&L for winding of HV/LV Coil of transformer DPC aluminium winding wire grade of existing gauge and size complete all as specified and directed. | 200 | Kg | 180 ₹36,000 Lowest | 290 ₹58,000 | 280 ₹56,000 | 275 ₹55,000 | 350 ₹70,000 | 350 ₹70,000 | 200 ₹40,000 |
| 5.00 | M&L for insulation material PCB electrical grade such as barriers, coil to coil insulation block and rings insulation cylinders, ebonies sleeves etc complete all as specified and directed for 50 KVA to 500 KVA transformer. | 13 | Each Job | 3,500 ₹45,500 | 300 ₹3,900 | 1,360 ₹17,680 | 1,500 ₹19,500 | 3,500 ₹45,500 | 250 ₹3,250 Lowest | 2,200 ₹28,600 |
| 6.00 | M&L for ovening of complete core assembly including HV/LV coils in oven for minimum 72 hrs for achieving desired insulation value complete all as specified and as directed.
Note:- Re opening shall be done without any extra cost if the desired result are not found after fixing the coils back to its original position in the tank. | 13 | Each Job | 1,500 ₹19,500 | 600 ₹7,800 Lowest | 1,900 ₹24,700 | 2,500 ₹32,500 | 2,200 ₹28,600 | 3,000 ₹39,000 | 5,500 ₹71,500 |
| 7.00 | S&F in renewal of heavy duty oil level indicator clean prismatic type with necessary gasket etc suitable for transformer up to 500 KVA capacity complete all as specified and directed. | 30 | Each Job | 800 ₹24,000 | 700 ₹21,000 | 190 ₹5,700 | 150 ₹4,500 Lowest | 1,300 ₹39,000 | 1,000 ₹30,000 | 1,000 ₹30,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Aug 2025, 6:00 pmClosed
Garrison Engineer Gwalior
Garrison Engineer Gwalior Morar Cantt
REPAIR/MAINT OF TRANSFORMER AND CONNECTED ITEM AT B/R-I AREA UNDER GE GWALIOR
2025_MES_723024_1
8178/GWL/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Garrison Engineer Gwalior
Please refer tender documents
9 documents required · 9 mandatory
₹500
Garrison Engineer Gwalior
₹60,000
Yes
6 Oct 2025
28 Jul 2025
27 Aug 2025
28 Jul 2025
25 Aug 2025
12 Aug 2025
Amount
Material and labour for transportation of transformer from site/E & M yard to workshop for repair of capacity 50 to 500 KVA complete including disconnection of transformer any make indoor/outdoor type from LV/HV side including disconnection of earthing GI strips and taking down transformer from plinth/04 pole structure/02 pole structure with the help of chain pulley/crane including megger test, ratio test, magnetic balance test, short circuit test and reinstallation the transformer after repair to its original position and making all LV/HV connections including earthing and testing complete all as specified and directed by Engineer-in-Charge. Note:- Shifting of transformer from site/yard to workshop and return back from workshop to site/yard shall be measured as single unit. Necessary tools and equipments with labour for shifting of the transformer and transportation to workshop and back deemed to be included in the quoted rate.
Material and labour for draining out transformer oil from the transformer of any make indoor/out door and store in a clean barrel for re-use and disconnection of internal electrical connection by taking out the top cover complete, cleaning of tank, removal of sludge etc by lifting the core with complete LV/HV coil of transformer and segregating to serviceable and unserviceable coils shall be kept aside for reuse after complete varnishing and testing of each coil including removal of complete core and accessories such as HV/LV bushings with metal parts, oil temp indicator, winding temp indicator and disconnection of tap changer. Assembling of yoke fitting, assembling of LV/HV coil in completely intact position over the CCSI laminated core the HT coils shall be fixed over the LV coils by providing the insulation barriers and making the assembly complete in intact position (insulation material shall be measured and paid separately) including assembling of core mounted on channel connecting all the internal connections, soldering brazing of HV/LV connections by silver electrodes including replacement of leads complete by providing tubular insulation of tap changer assembly and its connections and lowering of complete assembly in tank with suitable locking arrangements re fixing the top cover of transformer including the other accessories and making the transformer leak proof complete all as specified and directed for the following capacity :-
50 KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
Material and labour for winding of HV/LV coils of transformer DPC copper winding wire grade of existing gauge and size complete all as specified and directed.
M&L for winding of HV/LV Coil of transformer DPC aluminium winding wire grade of existing gauge and size complete all as specified and directed.
M&L for insulation material PCB electrical grade such as barriers, coil to coil insulation block and rings insulation cylinders, ebonies sleeves etc complete all as specified and directed for 50 KVA to 500 KVA transformer.
M&L for ovening of complete core assembly including HV/LV coils in oven for minimum 72 hrs for achieving desired insulation value complete all as specified and as directed. Note:- Re opening shall be done without any extra cost if the desired result are not found after fixing the coils back to its original position in the tank.
S&F in renewal of heavy duty oil level indicator clean prismatic type with necessary gasket etc suitable for transformer up to 500 KVA capacity complete all as specified and directed.
S&F cork sheet gasket kit cut to shape for the top covers and other required places of the transformer of following capacity of transformer complete all as specified and directed :-
50 KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
M&L for pouring fresh/topping up transformer oil for 33/11 KV and 11/0.433 KV transformer confirming to IS-335 in the transformer of any capacity complete duly filtered having dielectric breaking strength not less than 60 KV complete all as specified and as directed.
M&L for cleaning of surface of transformer of capacity by scrapping out old paint and painting of transformer by two coats of synthetic enamel gray paint externally over a coat of red oxide including writing of SM/MES No on the transformer complete all as specified and directed for the following capacity :-
50 KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
M&L for opening up top cover of transformer installed in position, disconnecting connections and reconnecting after renewal of worn out/defective parts such as check nuts, washers, LT bushes, HT bushes, Tap changers etc, refixing the top cover in position after completion of the repair work complete all as specified and directed for the following capacity of transformer :- Note : Defective parts shall be measured and paid seperately.
50 KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
S&F of LT bush with low Voltage brass studs with checks nuts, washers etc of 11 KV grade and LT bushing parts such as porcelain, clamp nuts and bolts etc complete all as specified and directed for the following capacity of transformer :-
50KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
S&F of HT bush with High Voltage brass studs with checks nuts, washers etc of 11 KV grade and HT bushing parts such as porcelain, clamp nuts and bolts etc complete all as specified and directed for the following capacity of transformer :-
50KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
Supply and fixing Breather assembly with silica gel and mounting packing with bolt & nuts complete all as specified and directed for the following capacity of transformer :-
50KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
Supply and fixing Tap changer assembly complete all as specified and directed for the following capacity of transformer :-
50 KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
Taking out complete core assembly with HV and LV coils tap changer assembly and connected items after opening of top cover of transformer. Complete inspection of core assembly carefully, cleaning of complete core assembly with pressure pump with transformer oil, necessary repairing as required, making necessary insulation etc and refixing the core assembly in tank locking with locking nut and bolts. Making all internal connections with required silver rods, copper strips etc. Refixing top cover etc and making the transformer leak proof complete all as specified and directed by Engineer-in-charge :-
50 KVA to 100 KVA
100 and upto 250 KVA
250 KVA upto 500 KVA
M&L for dehydration and filtration of transformer oil for 33/11 KV and 11/0.433 KV transformer to achieve dielectric breaking strength (BDV) not less than 45KV/22 KV any capacity to transformer by suitable filtration machine complete all as specified and directed.
M&L for preparation of LT side burnt cable end after cutting of burnt portion and supply & fixing new aluminium cable lugs (set of 3 Nos) insulation etc including taking out cable loop including necessary excavation earth work, returning filling etc compete all as specified and directed by Engineer-in charge for the following size of cables :-
Size 50 Sqmm to 95 Sqmm 3.5 Core
Size 120 Sqmm to 185 Sqmm 3.5 Core
Size 240 Sqmm to 400 Sqmm 3.5 Core
S&F cable joining kit for 11 KV (Earthed) grade cable for outdoor termination heat shrink type joint complete with joining material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 50 sqmm to 95 sqmm complete all as specified and directed.
S&F cable joining kit for 11 KV (Earthed) grade cable for outdoor termination heat shrink type joint complete with joining material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 120 sqmm to 185 sqmm complete all as specified and directed.
M&L Cable joining kit for LT cable for outdoor termination in repair heat shrink type joint complete with joining material and accessories suitable for 3.5 core XLPE armoured aluminium conductor cable of size 95 sqmm to 185 sqmm complete all as specified and directed.
M&L Cable joining kit for LT cable for outdoor termination in repair heat shrink type joint complete with joining material and accessories suitable for 3.5 core XLPE armoured aluminium conductor cable of size 185 sqmm to 400 sqmm complete all as specified and directed.
M&L for Earthing complete with galvanised steel earth plate electrode 60×60cm× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less than 1.5 metres below normal ground level, connected to but using galvanised iron strip 32×6mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point complete all as specified or indicated including testing on completion.
S&F Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated using 32 x 6 mm galvanized MS strip complete all as specified and directed.
Material and labour for transportation of transformer from site to E&M yard, E&M yard to Site and One Site to another site in morar cantt area of capacity 50 to 500 KVA complete including Disconnection of transformer any make indoor/outdoor type from LV/HV side including disconnection of earthing GI strips and taking down transformer from plinth/04 pole structure/02 pole structure with the help of chain pulley/crane including making all LV/HV connections and refixing after the shifting complete all as specified and directed by Engineer in charge. Note:- Shifting of transformer from Site to E/M yard and return back from E/M yard to site, One Site to another site and return back from another site to site one shall be measured as single unit. Necessary tools and equipments with labour for shifting of the transformer and back deemed to be included in the quoted rate.
M&L for rectify the leakage of transformer oil by opening up the top cover of transformer installed in position, disconnecting connections and reconnecting after rectified the leakage of oil refixing the top cover in position after completion of the repair work complete all as specified and directed for the capacity 50 KVA to 630 KVA transformer.
somyaenterprises (BID ID -3392214)
M/s Tirupati construction (BID ID -3405352)
BABA DEVELOPERS (BID ID -3396922)
M/S YOGANSH CONSTRUCTION CO. (BID ID -3404684)
AUTOMATION AND SWITCHGEAR PANELS (BID ID -3405545)
Aaradhya Ables Group (BID ID -3397362)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .