| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹64,800 (28.4%)Admitted-Finance KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | ₹2.9 L+₹64,800 (28.4%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 L+₹2.3 L (99.3%)Admitted-Finance SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | ₹4.5 L+₹2.3 L (99.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s R. Kumar Enterprises L1 | SHASHI ENGINEERING WORKS L2 | SUNSHINE ENGINEERING L3 |
|---|---|---|---|---|---|---|
| 1.00Name of work : Repairing of Crowd Cushion Assembly of BE-195 Shovel ( Sl No.04) at Nigahi Project. Maximum likely manpower to be deployed per shift : 11 Nos. (01 No. Highly skilled Supervisor, 02 Nos. Skilled, Semi-skilled - 04 Nos. and 04 No. Un-skilled). Scope of work : (1) Dismantling and fitting of crowd cushion (2) Cleaning of Crowd Cushion (3) Fabrication of long stud & retainer. (4) Repair of retainer clamp housing with welding and machining. (5) Repair of damage hole by welding and machining. | ||||||
| 2.00Repair of Crowd Cushion Assembly of BE-195 Shovel : | ||||||
| 2.01 | Cost/charges for Repairing of crowd cushion asssembly of BE-195 Shovel including labour charges contractor profit ( required Highly skilled supervisor, Skilled, Semi-skilled and Unskilled manpower to be deployed as per job requirement) | 1 | job | 1,59,800 ₹1,59,800 | 89,780 ₹89,780 Lowest | 3,25,950 ₹3,25,950 |
| 2.02 | Cost/charges for fabrication of 01 No. long stud with mat T-1 steel round 80mm dia x 2.5Mtrs. long including material cost, machining charges etc. | 45 | Hrs. | 100 ₹4,500 Lowest | 270 ₹12,150 | 200 ₹9,000 |
| 2.03 | Cost/charges for fabrication of 01 No. long stud with mat T-1 steel round bar 420mm dia x 95mm long including material cost, machining charges etc. | 46 | Hrs. | 100 ₹4,600 Lowest | 270 ₹12,420 | 200 ₹9,200 |
| 2.04 | Cost/charges for Machining of retainer clamp on heavy duty lathe machine | 80 | Hrs. | 100 ₹8,000 Lowest | 270 ₹21,600 | 200 ₹16,000 |
| 2.05 | Cost/charges for slot cutting on shapper machine | 120 | Hrs. | 100 ₹12,000 Lowest | 270 ₹32,400 | 200 ₹24,000 |
| 2.06 | Cost/charges for stud cutting on heavy duty lathe machine | 85 | Hrs. | 100 ₹8,500 Lowest | 270 ₹22,950 | 200 ₹17,000 |
| 2.07 | Cost/charges for hole on heavy duty drill machine | 80 | Hrs. | 105 ₹8,400 Lowest | 270 ₹21,600 | 200 ₹16,000 |
| 2.08 | Cost of rubber cushion ( PT No. 4106004558) | 26 | Nos | 600 ₹15,600 Lowest | 2,000 ₹52,000 | 1,000 ₹26,000 |
Tender Value
₹5.4 L
EMD Value
₹6,800
Closing Date
4 Apr 2026, 11:00 amClosed
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL, NIGAHI PROJECT, PO-NIGAHI , DISTT-SINGRAULI (MP)
Repairing of Crowd Cushion Assembly of BE-195 Shovel ( Sl No.04) at Nigahi Project.
2026_NCL_356955_1
NGH/EXCV/TENDERS/25-26/105
Open Tender
Excavation Department Work
Item Rate
20 days
NCL NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹6,800
3 Aug 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
4 Apr 2026
18 Mar 2026
17 Mar 2026 - 24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of work : Repairing of Crowd Cushion Assembly of BE-195 Shovel ( Sl No.04) at Nigahi Project. Maximum likely manpower to be deployed per shift : 11 Nos. (01 No. Highly skilled Supervisor, 02 Nos. Skilled, Semi-skilled - 04 Nos. and 04 No. Un-skilled). Scope of work : (1) Dismantling and fitting of crowd cushion (2) Cleaning of Crowd Cushion (3) Fabrication of long stud & retainer. (4) Repair of retainer clamp housing with welding and machining. (5) Repair of damage hole by welding and machining. | |||||
| 2Repair of Crowd Cushion Assembly of BE-195 Shovel : | |||||
| 2.01 | Cost/charges for Repairing of crowd cushion asssembly of BE-195 Shovel including labour charges contractor profit ( required Highly skilled supervisor, Skilled, Semi-skilled and Unskilled manpower to be deployed as per job requirement) | - | job | - | - |
| 2.02 | Cost/charges for fabrication of 01 No. long stud with mat T-1 steel round 80mm dia x 2.5Mtrs. long including material cost, machining charges etc. | - | Hrs. | - | - |
| 2.03 | Cost/charges for fabrication of 01 No. long stud with mat T-1 steel round bar 420mm dia x 95mm long including material cost, machining charges etc. | - | Hrs. | - | - |
| 2.04 | Cost/charges for Machining of retainer clamp on heavy duty lathe machine | - | Hrs. | - | - |
| 2.05 | Cost/charges for slot cutting on shapper machine | - | Hrs. | - | - |
| 2.06 | Cost/charges for stud cutting on heavy duty lathe machine | - | Hrs. | - | - |
| 2.07 | Cost/charges for hole on heavy duty drill machine | - | Hrs. | - | - |
| 2.08 | Cost of rubber cushion ( PT No. 4106004558) | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.98 MB
ANNEXURESANDOTHERIMPORTENTDOCUMENT.pdf
Tender Documents • 0.27 MB
UNDERTAKINGASPERANNEXURE-II.pdf
Tender Documents • 0.08 MB
BOQ_369814.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .