Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.4 L
Closing Date
30 Jul 2026, 3:00 pm
Ratlam Division - IND & DADN Coaching Depot - Escorting & A Check operation of EOG/HOG Power cars/ LSLRD of 500KVA 750V DA sets of M/s Kirloskar Oil Engine limited (KOEL) makes power cars of for two years.
EL-2026-27-09
EL-2026-27-09
Single
24 Months
Ratlam, Madhya Pradesh
₹0
₹6.4 L
7 Jul 2026
7 Jul 2026
16 Jul 2026
departure from primary station + 01 Hour after reaching destination + 01 Hour before departure from destination station
+ 01 Hour after reaching primary station) Rate calculation as follows- Per hour per man = (Minimum wages + EPF@ 13%
on minimum wage + ESI@ 3.25% on minimum wage + Bonus@ 8.33% on minimum wage) + GST@ 18%.
Escorting, operation, troubleshooting and HOG operation duties etc. of DG Set in working / non-working power car/ LSLRD
from train starting station to destination station and back. One number skilled fitter in each working/not working power
cars/LSLRD. Note: - Man Hour = Total hours of round trip of train (trip hours) + 4 hours (01 Hour before departure from
primary station + 01 Hour after reaching destination + 01 Hour before departure from destination station + 01 Hour after
reaching primary station) Rate calculation as follows- Per hour per man = (Minimum wages + EPF@ 13% on minimum
wage + ESI@ 3.25% on minimum wage + Bonus@ 8.33% on minimum wage) + GST@ 18%.
RATLAM DIVISION-ELECTRICAL/WESTERN RLY
1 1 Escorting, operation, troubleshooting and HOG operation duties Man-Hour 147212.00 168.69 24833192.28
etc. of DG Set in working / non-working power car/ LSLRD from
train starting station to destination station and back. One number
skilled fitter in each working/not working power cars/LSLRD. Note:
- Man Hour = Total hours of round trip of train (trip hours) + 4
hours (01 Hour before departure from primary station + 01 Hour
after reaching destination + 01 Hour before departure from
destination station + 01 Hour after reaching primary station) Rate
calculation as follows- Per hour per man = (Minimum wages +
EPF@ 13% on minimum wage + ESI@ 3.25% on minimum wage
+ Bonus@ 8.33% on minimum wage) + GST@ 18%.
Schedule B-'A' Check / trip maintenance and D-1 (for Both engines and alternators of power car either in warranty or out of
warranty) at base depot as per the' Schedule of Maintenance' including inspection of Alternator, Side body filter, Starting
Schedule Battery, Battery Charger, Self-starter motor, Power Panel, Control panel, Radiator, Radiator pipe line, Radiator chamber,
Radiator motor & starter, Roof exhaust fans and motor, Cables and trenches, Fuel tank, safety system etc. of power car as
per detailed specification.
'A' Check / trip maintenance and D-1 (for Both engines and alternators of power car either in warranty or out of warranty)
at base depot as per the' Schedule of Maintenance' including inspection of Alternator, Side body filter, Starting Battery,
Item- 1 Battery Charger, Self-starter motor, Power Panel, Control panel, Radiator, Radiator pipe line, Radiator chamber, Radiator
motor & starter, Roof exhaust fans and motor, Cables and trenches, Fuel tank, safety system etc. of power car as per
detailed specification.
1 1 'A' Check / trip maintenance and D-1 (for Both engines and Numbers 1768.00 4000.00 7072000.00
alternators of power car either in warranty or out of warranty) at
base depot as per the' Schedule of Maintenance' including
inspection of Alternator, Side body filter, Starting Battery, Battery
Charger, Self-starter motor, Power Panel, Control panel, Radiator,
Radiator pipe line, Radiator chamber, Radiator motor & starter,
Roof exhaust fans and motor, Cables and trenches, Fuel tank,
safety system etc. of power car as per detailed specification.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1.Letterofcreditasmodeofpayment04-06-2018.pdf
ATTACHMENT
2.ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf Procedureforpaymentofcontractorbill
ATTACHMENT
3.PBGproforma.pdf
ATTACHMENT
4.NOrelativecertificate.pdf
ATTACHMENT
5.certificateforrailwayemployeere-engagement_11.pdf
ATTACHMENT
6.BidsecurityAnnexure-VIA.pdf
ATTACHMENT
7.FormatVA.pdf
ATTACHMENT
8.FormatforAnnualcontractualturnoverAnnexure-VIB1.pdf
ATTACHMENT
9.GCCAPRIL-2022.pdf
ATTACHMENT
10.GCCACS-1dt.14-07-2022.pdf
ATTACHMENT
11.GCCACS-2dt.13-12-2022.pdf
ATTACHMENT
12.GCCACS-3dt.26-04-2023.pdf
ATTACHMENT
13.GCCACS-4dt.07-08-2023.pdf
ATTACHMENT
14.GCCACS-5dt.20-10-2023.pdf
ATTACHMENT
15.GCCACS-6dt.21-12-2023.pdf
ATTACHMENT
16.GCCACS-7dt.25-09-2024.pdf
ATTACHMENT
2.ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
ATTACHMENT
17.GCCACS-8dt.20-12-2024.pdf
ATTACHMENT
18.GCCACS-9dt.09-01-2025.pdf
ATTACHMENT
19.GCCACS-10dt.27-03-2025.pdf
ATTACHMENT
20.GCCACS-11dt13-03-2026_.pdf
ATTACHMENT
11thCorrectionslipofLHBMaintenanceManualversion1.1July2022Volume-II.pdf
ATTACHMENT
23.TERMINATIONCONTRACT.pdf
ATTACHMENT
21.ClarificationannexureV.pdf
ATTACHMENT
Provisionofefficientcompetentstaff2013-05-10.pdf
ATTACHMENT
RBEligibilitycriteriaforawardofwork20042020.pdfSECURED.pdf
ATTACHMENT
RBguideline03-06-2025.pdf
ATTACHMENT
CertificateofMedicalFitnessFormate.pdf
ATTACHMENT
TS808-.pdf
ATTACHMENT
Download all tender documents and submit your bid