Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68,000Qualified Item Categories: pH Meter 0 0 PANAPUR PANAPUR SARAN BIHAR 841424 | SARAN | BIHAR | 841424 | Item Categories: pH Meter | L1 | Qualified | |
| 2 | L2₹78,000+₹10,000 (14.7%)Not Evaluated Item Categories: pH Meter 3 C RAM NAGAR AMBALA CANTT AMBALA AMBALA HARYANA 133001 | AMBALA | HARYANA | 133001 | Item Categories: pH Meter | L2 | Not Evaluated | |
| 3 | L3₹1.3 L+₹57,080 (83.9%)Not Evaluated Item Categories: pH Meter | Item Categories: pH Meter | L3 | Not Evaluated | |
| 4 | L4₹1.4 L+₹73,200 (107.6%)Not Evaluated Item Categories: pH Meter PROP M S SUNTRONICS INDIA HOUSE NO 305 VILLAGE ABHAYPUR PANCHKULA HARYANA 134113 | PANCHKULA | HARYANA | 134113 | Item Categories: pH Meter | L4 | Not Evaluated | |
| 5 | L5₹1.6 L+₹87,600 (128.8%)Not Evaluated Item Categories: pH Meter 111 INDUSTRIAL AREA PHASE II IND AREA PANCHKULA HARYANA 134113 INDIA | PANCHKULA | HARYANA | 134113 | Item Categories: pH Meter | L5 | Not Evaluated Category: General |
Tender Value
₹70,800
EMD Value
Exempted
Closing Date
7 Aug 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
pH Meter (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Bid Number : GEM/2025/B/6432948 Dated : 17-07-2025 Bid Document 1/7 Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 70800 Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8066745
GEM/2025/B/6432948
Single Packet Bid
pH Meter (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria
45 days
Sasi Kumar Reddy761045IREL(India) Limited PO MATIKHALO, CHATRAPUR Ganjam District.
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
Exempted
7 Aug 2025
17 Jul 2025
7 Aug 2025
pH Meter (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Bid Number : GEM/2025/B/6432948 Dated : 17-07-2025 Bid Document 1/7 Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 70800 Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8066745.pdf
GEM_BID
1752050217.xlsx
OTHER
1752050126.pdf
OTHER
GCOC_b5cfa1a2-0a2c-4c2d-8b051752050318963_buycon2.irel.odisha.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .