| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 CrAccepted-Finance | ₹11.0 Cr | L1 | Accepted-Finance L1 BIDDER |
| Sl No | Description | Qty | Unit | SARAN BUILDWELL PVT. LTD. L1 |
|---|---|---|---|---|
| 1.00 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth
above 3 metre & upto 6 metre | 716.76 | Cum | 225 ₹1,61,271 Lowest |
| 2.00 | Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and MoRTH Specification Clause 801 Hindi(Matras commas and the like not to be measured and paid for. Half letters shall be counted half only) | 9,600 | Per Cm Height Per Letter | 0.6 ₹5,760 Lowest |
| 3.00 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth
above 3 metre & upto 6 metre | 2,638.89 | Cum | 190 ₹5,01,389.1 Lowest |
| 4.00 | Carriage of Materials by mechanical transport including loading, unloading and stacking, if stacking is not required no deduction is to be done for; Cement, Surkhi (Pulverized), Fly ash, Tar, Timber, bricks, steel, cut stone etc.Lead up to 5 Km | 55.25 | MT | 155 ₹8,563.75 Lowest |
| 5.00 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801 200 m stone (precast) | 69 | Each | 407 ₹28,083 Lowest |
| 6.00 | Earth work for sand and silt clearance of channels and berm unloading; 6.1.2 Basket work undressed with combined lead upto 50 m | 81,707.12 | CUM | 30 ₹24,51,213.6 Lowest |
| 7.00 | Vitreous china foot rests 250x130x30 mm | 4 | pair | 175 ₹700 Lowest |
| 8.00 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary. 10.2.2 for uncommand area | 41,293.64 | Cum | 13 ₹5,36,817.32 Lowest |
| 9.00 | Supply and fixing in position of APM blocks made of CI as per standard specification with adjustable arrangement and required fixtures including transportation to site second stage concreting in (CC 1:2:4 ) centering ,shuttering, painting with red oxide finishing etc complete in all respect cost of APM Block (all size) per block. | 18 | Each | 9,890 ₹1,78,020 Lowest |
| 10.00 | Plastering with cement mortar (1:3), 15 mm thick on brickwork in parapet as per MoRTH specification Clauses 1312.4 | 81 | Sqm | 145 ₹11,745 Lowest |
Tender Value
₹11.6 Cr
EMD Value
₹23.2 L
Closing Date
13 Nov 2025, 6:00 pmClosed
Superintending Engineer WR Circle Nohar
SE WR CIRCLE, CANAL COLONY, BHADRA ROAD NOHAR
Rehabilitation of Jasana Distributary Km 17 to tail Nohar Canal System
2025_WRDAS_507874_1
NIB_06/2025-26 Item 01
Open Tender
Civil Works
Item Rate
365 days
NOHAR
As per bid documents
3 documents required · 3 mandatory
₹10,000
EE WR DIVISION/Secretary, RREIS
₹23.2 L
SE WR CIRCLE NOHAR
12 Dec 2025
16 Oct 2025
14 Nov 2025
16 Oct 2025
13 Nov 2025
16 Oct 2025
30 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth
above 3 metre & upto 6 metre | 716.76 | Cum | - | - |
| 2 | Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and MoRTH Specification Clause 801 Hindi(Matras commas and the like not to be measured and paid for. Half letters shall be counted half only) | 9,600 | Per Cm Height Per Letter | - | - |
| 3 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth
above 3 metre & upto 6 metre | 2,638.89 | Cum | - | - |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking, if stacking is not required no deduction is to be done for; Cement, Surkhi (Pulverized), Fly ash, Tar, Timber, bricks, steel, cut stone etc.Lead up to 5 Km | 55.25 | MT | - | - |
| 5 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801 200 m stone (precast) | 69 | Each | - | - |
| 6 | Earth work for sand and silt clearance of channels and berm unloading; 6.1.2 Basket work undressed with combined lead upto 50 m | 81,707.12 | CUM | - | - |
| 7 | Vitreous china foot rests 250x130x30 mm | 4 | pair | - | - |
| 8 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary. 10.2.2 for uncommand area | 41,293.64 | Cum | - | - |
| 9 | Supply and fixing in position of APM blocks made of CI as per standard specification with adjustable arrangement and required fixtures including transportation to site second stage concreting in (CC 1:2:4 ) centering ,shuttering, painting with red oxide finishing etc complete in all respect cost of APM Block (all size) per block. | 18 | Each | - | - |
| 10 | Plastering with cement mortar (1:3), 15 mm thick on brickwork in parapet as per MoRTH specification Clauses 1312.4 | 81 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
jasanabidfinal.pdf
Tender Documents • 3.23 MB
BOQ_904535.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .