| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹4.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.4 Cr+₹79.3 L (17.4%)Admitted-Finance | ₹5.4 Cr+₹79.3 L (17.4%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L1 | MSS CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Check surveying and pit marking of tower locations including cost of all labour, lead, lift, hire charges for T&P etc complete. | 14 | Loc. | 2,500 ₹35,000 | 2,300 ₹32,200 Lowest |
| 2.00 | Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete | 19,957 | m2 | 3 ₹59,871 Lowest | 3 ₹59,871 Lowest |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard gravelly soil | 2,033 | m3 | 150 ₹3,04,950 Lowest | 150 ₹3,04,950 Lowest |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In soft distengrated rock not requiring blasting | 508 | m3 | 200 ₹1,01,600 Lowest | 200 ₹1,01,600 Lowest |
| 5.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In medium rock and dense medium rock not requiring blasting | 508 | m3 | 350 ₹1,77,800 Lowest | 350 ₹1,77,800 Lowest |
| 6.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring blasting | 170 | m3 | 600 ₹1,02,000 Lowest | 600 ₹1,02,000 Lowest |
| 7.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring Wedging and chesiling | 169 | m3 | 1,500 ₹2,53,500 Lowest | 1,500 ₹2,53,500 Lowest |
| 8.00 | Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For HCR tower | 5 | Loc. | 30,000 ₹1,50,000 Lowest | 30,000 ₹1,50,000 Lowest |
| 9.00 | Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For KCR tower | 1 | Loc. | 35,000 ₹35,000 Lowest | 35,000 ₹35,000 Lowest |
| 10.00 | Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For QC tower | 2 | Loc. | 65,000 ₹1,30,000 Lowest | 65,000 ₹1,30,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
6 May 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Extension of 110 kV supply to M/s Chemplast Sanmar limited plant - III,EHT SC No.23 for demand of 15,500 KVA by utilizing the existing 110 kV Malco - III Feeder bay in Mettur 230/110 kV SS take off arrangement by providing 110 kV dedicated radial fe
2025_EB_542714_1
TP1-04/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
salem
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.6 L
Yes
31 May 2025
9 Apr 2025
7 May 2025
9 Apr 2025
6 May 2025
9 Apr 2025
Amount
Check surveying and pit marking of tower locations including cost of all labour, lead, lift, hire charges for T&P etc complete.
Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In medium rock and dense medium rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring Wedging and chesiling
Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For HCR tower
Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For KCR tower
Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For QC tower
Transport & setting of Stub & Cleat and bolt & nuts, Transport and setting of stubs including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For QD tower
PCC 1:3:6, using 20mm HBG metal for foundation without form work including cost of cement all materials, labour, lead, lift, etc., complete.
PCC 1:2:4 using 12 to 20mm HB Stone for foundation with steel form work including cost of cement all materials labour etc., complete.for frustem shaped foundation & Chimney
Rcc 1:1.5:3 using 20 mm metal with form work of tower foundation concrete including cost of cement and all materials , labour , lead , curing , form work charges for T&P etc complete but excluding the cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete. For HCR tower Location
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete. For KCR tower Location
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete. For QC tower Location
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete. For QD tower Location
Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and transporting charges etc., complete.
Providing muffing copping with PCC 1:2:4 using 12-20mm HBG metal with form work including cost of cement all materials, labour, lead, lift, etc., complete.
Providing pipe type earthing using earth pipe and GI earth wire supplied including all labour and cost of earth pipe, etc., complete
Providing special earthing arrangements for Terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip including all cost of materials lead lift etc complete.
Plastering with C.M 1:3 12mm thick including cost of cement, all materials labour etc., complete.
Transport and erection of towers including sorting out of tower members, tightening punching the bolts and nuts whereever necessary, patch painting, cutting of angles wherever necessary, minor fabrication workss, final checking, cost of T & P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials,adhering to the BOCW act 1996 and rules 2006 without any compromise all leads and lifts etc., complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of ST fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Providing trussel for High way Road crossings and Telephone lines during paying out, rough sagging and tensioning of power conductors and earth wire including cost of bamboo, coir and labor etc., complete.
Providing temporary stays during rough sagging and tensioning including excavation, refilling and dismantling the stays after tensioning etc., complete.
Labour charges for transport of 3 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For KM
Labour charges for transport of 3 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For KM (under LC condition)
Labour charges for transport of 6 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For KM (under LC condition)
Labour charges for transport of 9 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For KM (under LC condition)
Labour charges for dismantling of GI existing tower angles including cost of materials,T & P,labour, lead, lift etc complete. as per approved drawing and specification
Labour charges for dismantling of GI existing tower angles under Re- usable condition including cost of materials,T & P,labour, lead, lift etc complete. as per approved drawing and specification
Releasing and lowering of 7 units of single suspension insulator with fittings and refixing the same after completion of new line stringing including all labour lead lifts, and T & P etc complete.
Releasing and lowering of 8 units of single Tension insulator with fittings and refixing the same after completion of new line stringing including all labour lead lifts, and T & P etc complete.
Labour charges for Releasing and lowering of 6 Nos of existing Panther conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. (Under LC condition)
Labour charges for Releasing and lowering of existing 1 No. OPGW 48 fiber including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete (Under LC condition)
Labour charges for Releasing and lowering of existing 1 No. GI earth wire including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete (Under LC condition)
Arranging and availing of LC on HT/LT power lines and lowering and retensioning after stringing is completed including all labour etc., complete
Painting with best quality of anti-corrosive black paint for a height of 1.00m from the top level of coping including cost of paint all labour etc., complete.
Labour charges for Tack welding of bolts and nuts in towers up to bottom cross arm using diesel generator sets and applying cold galvanizing paint including cost of all materials, lead and hire charges etc., complete.
Providing shoring and shuttering with CW scantlings and planks including cost of all materials, labour etc., complete.
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete
Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete
Transport charges for dismantled tower , 120 KN disc insulator & 90 KN disc insulator under useful condition from site to K.R.Thoppur Central store including the hire charges for T & P etc. complete.
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supply, transporting and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supply, transporting and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
Supply, transporting and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Supply, transport and fixing of Single Tension fittings for panther as per design drawing and specifications.
Supply, transport and fixing of Single Suspension fittings for Panther as per design drawing and specifications.
Supply, transport and fixing of SB damber for panther as per design drawing and specifications.
Supply, transport and fixing of Mid span joint for Panther as per design drawing and specifications
Supply, transport and fixing of Repair sleeve for Panther as per design drawing and specifications
Supply and erection of 48 OPGW cable as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
supply and erection of 48 fiber OFC cable with splicing box,HDPE pipe and FODP panel with accessories ,testing and commissioning
Dismantling of GI Tower Angle in AS IS WHERE IS CONDITION clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.25,000/-)
Dismantling of ACSR panther conductor in AS IS WHERE IS CONDITION clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.90,000/-)
Dismantling of 48 F OPGW cable in AS IS WHERE IS CONDITION clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.18,000/-)
Dismantling of GI earth wire conductor in AS IS WHERE IS CONDITION clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.18,000/-)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
MSS CONTRACTORS (BID ID -1327714)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .