Loading…
Loading…
Tender Value
₹30.8 L
EMD Value
₹3.1 L
Closing Date
23 Jun 2026, 3:00 pm
ce knn
CE Office knn
Construction of RCC drain from near Yadav flour mill to Hanuman temple under Zone 06 Ward 52 Sharda Nagar.
2026_NNKAN_1160401_1
176/AA-6/2026-27
Open Tender
Civil Works
90 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,723
₹3.1 L
13 Jun 2026
13 Jun 2026
23 Jun 2026
13 Jun 2026
23 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantaling R.C.C work including stocking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) etc all complete | 39.6 | sqm | 1,000 | ₹39,600 | BI01010001010000000000000515BI0100001171 |
| 2 | Earth work in excavation by mechanical means hydraulic excavator in trenches for foundation pipe cable etc in ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. | 288 | cum | 215 | ₹61,920 | BI01010001010000000000000515BI0100001172 |
| 3 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. | 28.8 | cum | 4,380 | ₹1,26,144 | BI01010001010000000000000515BI0100001173 |
| 4 | R.C.C works with1:1.5:3 cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All complete | 163.06 | cum | 8,720 | ₹14,21,883.2 | BI01010001010000000000000515BI0100001174 |
| 5 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. tor etc.all complete. | 128 | qtl | 7,200 | ₹9,21,600 | BI01010001010000000000000515BI0100001175 |
| 6 | cartage of earth upto 3km including loading and unloading incl mat all complete. | 264.58 | cum | 116.96 | ₹30,945.28 | BI01010001010000000000000515BI0100001176 |
| 7 | 1 SIGN. BOARD efte all completion. of went | 1 | nos | 3,840 | ₹3,840 | BI01010001010000000000000515BI0100001177 |
| 8 | TAX18% | 1 | TaX | 4,69,067.85 | ₹4,69,067.85 | BI01010001010000000000000515BI0100001178 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.38 MB
BOQ_2174700.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid