| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.1 LAccepted-AOC FLAT NO G 406 HANSA COURTYARD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | ₹37.1 L Quoted ₹42.7 L | L1 | Accepted-AOC L1 Bidder AOC issued |
| 2 | L2₹44.1 LRejected-AOC | ₹44.1 L | L2 | Rejected-AOC L2 Bidder Rejected |
| Sl No | Description | Qty | Unit | Gold Engineering Works L1 | Selvi Engineering Works L2 |
|---|---|---|---|---|---|
| 1.00 | I. Material Portion: M.S Sheet 4 mm thick | 5.03 | MT | 89,900 ₹5,33,592.46 | 91,000 ₹5,40,121.4 |
| 2.00 | ISMB 150 x 75 | 0.82 | MT | 73,000 ₹70,634.8 | 74,000 ₹71,602.4 |
| 3.00 | M.S Plate 12 mm TK | 3.72 | MT | 91,800 ₹4,02,965.28 | 92,000 ₹4,03,843.2 |
| 4.00 | ISA 65 X 65 X 8mm | 0.22 | MT | 68,000 ₹17,652.8 | 69,000 ₹17,912.4 |
| 5.00 | ISA 50 X 50 X 6 | 0.57 | MT | 67,000 ₹45,064.2 | 68,000 ₹45,736.8 |
| 6.00 | GI Grating. | 15.2 | Sq.m | 17,600 ₹3,15,673.6 | 18,000 ₹3,22,848 |
| 7.00 | II. Labour Portion: Dismantling of existing severely corroded/ damaged triper conveyor column and bracing for boom conveyor structures & operator cabin in Reclaimer – 1B which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc., | 4.5 | MT | 11,600 ₹61,596 | 12,500 ₹66,375 |
| 8.00 | Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges & T&P consumables. | 10.36 | MT | 6,100 ₹74,571.28 | 6,500 ₹79,461.2 |
| 9.00 | Fabrication of boom conveyor structures & operator cabin in Reclaimer – 1B by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges. | 10.36 | MT | 84,900 ₹10,37,885.52 | 88,000 ₹10,75,782.4 |
| 10.00 | Erection of boom conveyor structures & operator cabin in Reclaimer – 1B by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane winch hire charges, consumables and T&P hire charges. | 10.36 | MT | 94,500 ₹11,55,243.6 | 98,000 ₹11,98,030.4 |
Tender Value
Refer Docs
EMD Value
₹35,100
Closing Date
6 Oct 2025, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
NCTPSI SEMII Circle ECHS Dn Strengthening of existing severely damaged or corroded boom conveyor structures MCC room and operator cabin in Reclaimer1B
2025_EB_607358_1
CE/NCTPSI/SE/MII/SpNo100/25-26
Open Tender
Power/Energy Projects/Products
45 days
NCTPS-I Chennai
Refer to tender specification
3 documents required · 3 mandatory
₹0
₹35,100
Yes
17 Mar 2026
22 Sept 2025
7 Oct 2025
22 Sept 2025
6 Oct 2025
22 Sept 2025
Amount
I. Material Portion: M.S Sheet 4 mm thick
ISMB 150 x 75
M.S Plate 12 mm TK
ISA 65 X 65 X 8mm
ISA 50 X 50 X 6
GI Grating.
II. Labour Portion: Dismantling of existing severely corroded/ damaged triper conveyor column and bracing for boom conveyor structures & operator cabin in Reclaimer – 1B which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc.,
Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges & T&P consumables.
Fabrication of boom conveyor structures & operator cabin in Reclaimer – 1B by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of boom conveyor structures & operator cabin in Reclaimer – 1B by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane winch hire charges, consumables and T&P hire charges.
Erection of GI Gratings in newly erected steel support structure for Reclaimer – 1B working platform by marking, cutting welding, including transportation, painting of red oxide paint, cost of consumables & T&P’s hire charges, etc.,
Cleaning the surface with shot basting the boom conveyor structures & operator cabin in Reclaimer – 1B including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges.
Painting three coat of epoxy paints (one coat of primer and two coat of epoxy paint) epoxy Thinner consumables and T&P’s & hire charges.
Cost of paint for one coat of Zinc phosphate epoxy primer (60-70 microns DFT) in the boom conveyor structures & operator cabin in Reclaimer -1B.
Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures of boom conveyor structures & operator cabin in Reclaimer-1B.
Cost of paint for one coat of aromatic polyurethane (30-35 microns DFT) with total DFT of 190 to 225 microns in the structures of boom conveyor structures & operator cabin in Reclaimer 1B.
Selvi Engineering Works (BID ID -1478488)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid