Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance 2 11 DHAJU FARIDABAD HARYANA 121004 | FARIDABAD | FARIDABAD | HARYANA | 121004 | L1 | Admitted-Finance | ||
| 2 | L2₹4.5 L+₹17,790.62 (4.08%)Admitted-Finance 464 21 NEW ANAJ MANDI TOHANA 125120 | FATEHABAD | HARYANA | 125120 | L2 | Admitted-Finance | ||
| 3 | L3₹5.2 L+₹81,808.29 (18.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.3 L+₹92,096.84 (21.1%)Admitted-Finance HOUSE NO R17 ADARSH COLONY NEARBY MULLAH HOTEL NIT FARIDABAD 121001 | FARIDABAD | FARIDABAD | HARYANA | 121001 | L4 | Admitted-Finance | ||
| 5 | L5₹5.3 L+₹92,954.22 (21.3%)Admitted-Finance H NO 2 88 A THAKUR WADA OLD FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | L5 | Admitted-Finance |
Tender Value
₹7.1 L
EMD Value
₹14,280
Closing Date
29 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sandeep Dahiya
DIV Faridabad
A/mtc of sewerage scheme in sector-2, Faridabad. Providing and Laying of 250 mm HDPE Pipe, Excavation, Brick Work, PCC, Slab etc. in front of DSS No. 211 To 219 in Sector-2, Faridabad and all other works contingent thereto
2026_HBC_555775_1
202693358CD8 62E7 4B84 9053 140C688E7B61248HSV
Open Tender
Civil Works
Works
60 days
Faridabad (MC)
A/mtc of sewerage scheme in sector-2, Faridabad. Providing and Laying of 250 mm HDPE Pipe, Excavation, Brick Work, PCC, Slab etc. in front of DSS No. 211 To 219 in Sector-2, Faridabad and all other works contingent thereto
2 documents required · 2 mandatory
₹1,000
₹14,280
Yes
2 Nov 2026
22 Oct 2026
30 Oct 2026
22 Oct 2026
29 Oct 2026
22 Oct 2026
22 Oct 2026 - 24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil | 693 | per cum | 78 | ₹54,054 |
| 2 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | 90 | per sqm | 139 | ₹12,510 |
| 3 | [11.52]Cement rendering on plaster 1 mm thick | 93.45 | per sqm | 28 | ₹2,616.6 |
| 4 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 24.23 | per cum | 4,404 | ₹1,06,686.9 |
| 5 | [22.198.1]Providing M.S. foot rests including fixing in manholes with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) as per standard design : 1. With 20x20 mm square bar | 50 | Each | 243 | ₹12,150 |
| 6 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | 20 | Each | 1,155 | ₹23,100 |
| 7 | [21.96.3]Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 3. 250 mm Outside Dia. | 150 | Per mtr. | 2,322 | ₹3,48,300 |
| 8 | [6.1.3]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 0.8 | per cum | 3,426 | ₹2,740.8 |
| 9 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 1.36 | per cum | 2,442 | ₹3,311.35 |
| 10 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 9.78 | per sqm | 208 | ₹2,033.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_635713.xls
BOQ • 0.35 MB
778797Z183034.pdf
Additional Documents • 0.24 MB
OT0183034.pdf
Other Document • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .