| 1 | L1₹14.5 LAdmitted-Finance | ₹14.5 L | L1 | Admitted-Finance |
| 2 | L2₹15.0 LAdmitted-Finance | ₹15.0 L | L2 | Admitted-Finance |
| 3 | L3₹16.2 LAdmitted-Finance | ₹16.2 L | L3 | Admitted-Finance |
| 4 | L4₹17.3 LAdmitted-Finance D NO 106C 14TH STREET KEASAVAPURAM NAALUR POST MINJUR 601203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | ₹17.3 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V P MUNIRAMAN L4 | THIRUMURUGAN ENTERPRISES L3 | KSM CONSTRUCTION L2 | SCAN CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc. | 41 | Cu.m | 142 ₹5,822 | 130 ₹5,330 | 130 ₹5,330 | 120 ₹4,920 |
| 2.00 | M.sand filling including cost of sand ,filling charges , labour for watering and consolidation leads and lift etc.complete. (10 Cm - Depth) | 3 | Cu.m | 2,150 ₹6,450 | 2,010 ₹6,030 | 1,900 ₹5,700 | 1,500 ₹4,500 |
| 3.00 | Plain Cement Concrete 1:3:6 using 20mm HBG stone including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | 36.5 | Cu.m | 7,142 ₹2.6 L | 6,680 ₹2.4 L | 6,600 ₹2.4 L | 6,000 ₹2.2 L |
| 4.00 | Providing RCC 1:1.5:3 raft using 20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete excluding steel reinforcement (Raft) | 51 | Cu.m | 10,530 ₹5.4 L | 9,830 ₹5.0 L | 8,800 ₹4.5 L | 9,000 ₹4.6 L |
| 5.00 | Providing RCC 1:1.5:3 using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete excluding steel reinforcement (with form work) | 9 | Cu.m | 11,600 ₹1.0 L | 10,830 ₹97,470 | 10,000 ₹90,000 | 10,000 ₹90,000 |
| 6.00 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site | 3.1 | MT | 98,420 ₹3.1 L | 91,900 ₹2.8 L | 81,000 ₹2.5 L | 83,000 ₹2.6 L |
| 7.00 | Supply and laying of PVC pipe 10 Kg/cm² including all specials in ISI make and cost of materials, labour, lead and lift etc., complete. - 25mm Dia Pipe | 90 | Mtr | 230 ₹20,700 | 215 ₹19,350 | 200 ₹18,000 | 190 ₹17,100 |
| 8.00 | Supply and laying of PVC pipe 10 Kg/cm² including all specials in ISI make and cost of materials, labour, lead and lift etc., complete. - 20mm Dia pipe | 40 | Mtr | 210 ₹8,400 | 195 ₹7,800 | 180 ₹7,200 | 190 ₹7,600 |
| 9.00 | Labour charges for demolishing Indian water closet with cement mortar including cost of all labour, lead , lift etc., complete. | 1 | Nos. | 1,605 ₹1,605 | 1,500 ₹1,500 | 2,000 ₹2,000 | 1,500 ₹1,500 |
| 10.00 | Supply and fixing of European water closet with cement mortar ISI make (Polyware make), including cost of all labour, lead , lift etc., complete. | 1 | Nos. | 5,610 ₹5,610 | 5,200 ₹5,200 | 5,000 ₹5,000 | 5,000 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹16,150
Closing Date
8 Dec 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_625425_1
OT-72/2025-26 of SE/GCC-II
Open Tender
Civil Works
120 days
Kakkalur
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹16,150
Yes
23 Jan 2026
21 Nov 2025
9 Dec 2025
21 Nov 2025
8 Dec 2025
21 Nov 2025
Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc.
M.sand filling including cost of sand ,filling charges , labour for watering and consolidation leads and lift etc.complete. (10 Cm - Depth)
Plain Cement Concrete 1:3:6 using 20mm HBG stone including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
Providing RCC 1:1.5:3 raft using 20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete excluding steel reinforcement (Raft)
Providing RCC 1:1.5:3 using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete excluding steel reinforcement (with form work)
Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site
Supply and laying of PVC pipe 10 Kg/cm² including all specials in ISI make and cost of materials, labour, lead and lift etc., complete. - 25mm Dia Pipe
Supply and laying of PVC pipe 10 Kg/cm² including all specials in ISI make and cost of materials, labour, lead and lift etc., complete. - 20mm Dia pipe
Labour charges for demolishing Indian water closet with cement mortar including cost of all labour, lead , lift etc., complete.
Supply and fixing of European water closet with cement mortar ISI make (Polyware make), including cost of all labour, lead , lift etc., complete.
Dadooing walls with glazed tiles of best approved quality of make Johnson ,neycer etc over cm 1:3 12mm thick including cost of all materials,labour ,lead,lift etc complete
Paving the floor with Antiskid tiles for toilets (quality, colour and shade as directed by the engineer at site) of size 300 mm x 300 mm x 10 mm over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured cement
Supplying and fixing in position tap with necessary cutting, threading and jointing using shellac etc., complete complying with standard specification and as directed by the departmental officers (20mm Dia)
Supplying & fixing barbed wire 30 cm C/C 8 rows horizontal & vetically - Six ply and four Pronged (Galvanised) including cost of GI binding wire all materials transport, labour, lead and lift etc., complete.
Plastering with CM 1:3, 12mm thick inside including cost of cement, all materials, curing, labour, lead and lift etc., complete
Fabrication, Supplying and fixing of MS main gate with flat and square rods as directed by the Engineer at site including painting two coats with enamel paint over a coat of primer cost of materials, labour, lead ad lift etc., complete.
Colour washing two coats of exterior emulsion paint over a primer coat of approved colour and quality including cost of all materials, labour, lead lift etc., complete.
Cleaning of existing septic tank with size of 3.00mx2.00mx2.50m including transport charges, labour, lead, lift etc., complete.
Clearing of juliflora jungle including cost of all labour, lead, lift, etc., complete
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_747895.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid