Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-Finance | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹19.3 L+₹95,050 (5.17%)Accepted-Finance 2 64 24 1 PONNANDI NAGAR 2ND STREET MUTHIAHPURAM TUTICORIN 628 005 | TUTICORIN | TAMIL NADU | 628005 | L2 | Accepted-Finance BOQ Accepted |
Tender Value
₹23.7 L
EMD Value
₹23,700
Closing Date
16 Mar 2023, 2:00 pmClosed
Superintending Engineer/Mechanical-I
O/o SE/MI/TTPS
ECHP-II- Attending preventive breakdown mechanical maintenance in Conveyor-65 to 68 at Coal Jetty-II and related equipments for the period from 01.04.2023 to 30.09.2023
2023_EB_291930_1
SE/MI/TTPS/69/2023-2024
Open Tender
Miscellaneous Works
Works
180 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹23,700
Yes
22 Mar 2023
1 Mar 2023
17 Mar 2023
1 Mar 2023
16 Mar 2023
1 Mar 2023
PREV MTNCE WORKS IN CONVRS 65 TO 68
Charges for assisting work for providing exclusive belt joint /lagging work including belt clamping, including take up tower arresting, removing and refixing 10 nos idler frames with the idlers, normalizing the system and trial operation of the conveyor including T&P hire charges cost of consumables, etc., complete.
Charges for taking out the pulley from the conveyor for bearing inspection at both sides by removing the bearing and sleeves from the pulley cleaning with diesel if find necessary replacing with new one reassembling the bearings and sleeves with pulley in their respective position, free rotation checkup, normalizing the system and trial operation of the conveyor including T & P hire charges cost of consumables, etc., complete.
Charges for replacement of pulley which may be any one of take up pulley or bend pulley or tail pulley in the respective conveyor leading the new/reconditioned pulley from stores to the respective work spot, lifting and arresting counter weight, belt clamping, removing the failed pulley placing the new/reconditioned pulley in all respects, normalizing the system and trail operation of the convey- including T & P hire charges cost of consumables, corporation charges, etc., complete.
Charges for disconnecting the solenoid valve oil pipe line for fluid coupling of conveyor drive (65 to 68) decoupling of 2 nos resilient coupling dismantling the fluid coupling(of conveyor 65 to68) lowering down the drive bed by chain pulley block and then loading the fluid coupling unit to the workshop, after overhauling the fluid coupling placing the fluid coupling on the drive bed of conveyors by chain pulley block connecting the auxiliaries with fluid coupling assembly (connecting pipe lines, oil lines and fixing of solenoid valve) alignment of gear box to fluid coupling, fluid coupling to motor and holdback checking, coupling the fluid coupling with gear box and HT motor by 2 nos resilient coupling, topping up of oil and commissioning and trial. including T & P hire charges cost of consumables, etc., complete.
Charges for changing the drive in conveyor 65/66/67/68 from drive A to B (or) B to A and holdback checking in the fluid coupling. including T & P hire charges cost of consumables, etc., complete.
Charges for dismantling the coupling of fluid coupling with gear box and HT motor by 2 nos resilient coupling ,alignment of gear box to fluid coupling, fluid coupling to HT motor by 2 nos resilient coupling, topping up of oil and commissioning and trail run. including T & P hire charges cost of consumables, etc., complete.
Charges for replacing and overhauling the defective oil heat exchanger from its position dismantling the oil exchanger top & bottom sides separated by cutting heating the oil pipe lines to remove sediments in all the pipe lines cleaning with water and rinse with diesel, assembling the whole unit, lifting, leading, positioning and commissioning the system in conveyors 65/66/67/68 including T & P hire charges cost of consumables, etc., complete.
Charges for routine cleaning of the Plummer blocks ,resilient couplings, greasing of 6 to 7 points periodically, routine checking of belt scrubbers and skirt board rubber and replacing of worn out rubber, fabrication and providing of new scrubbers and skirt Board sealing system if required, checking oil level and top up in conveyor 65/66/67/68, including T & P hire charges cost of consumables, corporation charges, etc., complete.
Charges for transporting, loading the respective idler frames / idlers from stores, unloading to the required conveyors 65/66/67/68 replacing the existing worn-out idler frames / idlers by providing by new one, monitoring the belt away, scrap material devoluted to stores, including T & P hire charges cost of consumables, etc. complete.(One set consists of 3 Nos idlers)
Charges for dismantling the Resilient coupling, scoop actuator assembly, and fluid coupling assembly , cooling fan leading and lifting the input pinion shaft, inspecting the bearing, shaft, removing the hub and wornout oil seal providing new one, or both sides assembly the auxiliaries, alignment checking, trial run, monitoring the conveyor, including T & P hire charges cost of consumables, ,corporation charges, etc. complete.
Charges for leading the rope grease from pocket / department stores to required place of conveyor 65/66/67/68 area, cleaning the rope, sheave pulleys and applying the rope grease on Conveyor 65/66/67/68 including T & P hire charges cost of consumables, etc., complete.
Charges for dismantling the fluid coupling from the drive motor and gear box, oil draining lifting and lowering the rotor assembly, dismantling the internal parts, removing the worn out oil seal, assembly by new one, checking the bearing, assembly the accessories oil filling, trial run, monitoring the conveyor including T&P hire charges cost of consumables, etc. complete.
Charges for transporting, loading the MS / SS 304 / 10mm thick liner plates from Stores / Unloading to respective discharge chutes of conveyor 65/66/67/68. preparation of required size, removal of existing worn out liner plates, fixing by new one scrap materials devoluted to stores, including cost of MS / SS welding electrodes, lead and lift, consumables and T&P hire charges, etc., complete.
Charges for transporting, loading the MS / SS 304 / 10mm thick parent plates from Stores / Unloading to respective discharge chutes of conveyor 65/66/67/68. preparation of required size, removal of existing worn out parent plates with Liner plates fixing by new one scrap materials devoluted to stores, including cost of MS / SS welding electrodes, lead and lift, consumables and T&P hire charges, etc., complete.
A. SUDALAIMUTHU CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .