Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | -40.00% | ₹4.2 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Name of work not mentioned in Bild validity |
Tender Value
₹7.0 L
EMD Value
₹14,008
Closing Date
17 Aug 2026, 6:00 pmClosed
XEN IFC
Office of the Executive Engineer IFC Division Poonch
Restoration/ Improvement of Sangla Main Khul
2026_IFC_319983_2
e-NIT No.20 of 2026-27 Dated 07-08-2026
Open Tender
Civil Works
Percentage
45 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
XEN IFC POONCH
₹14,008
22 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 28.8 | cum | 592.9 | ₹17,075.52 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 59.7 | cum | 5,733.6 | ₹3,42,295.92 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 19.8 | sqm | 286.35 | ₹5,669.73 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 178.2 | sqm | 628.95 | ₹1,12,078.89 |
| 6 | Dry stone pitching (any thickness) excluding cost of stones.
On Horizontal | 36.84 | cum | 535.55 | ₹19,729.66 |
| 7 | Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on
horizontal/side slopes; complete including curing. | 245.6 | sqm | 199.3 | ₹48,948.08 |
| 8 | supply of stones | 31.31 | cum | 700 | ₹21,917 |
| 9 | Carriage of stone by an avg 5 km by MT and 200m by HL | 31.31 | cum | 626.44 | ₹19,613.84 |
| 10 | carriage of sand &agg by avg 5km by Mt and 200m by HL | 212.34 | cum | 532.48 | ₹1,13,066.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_1061853.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .