Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
1 Oct 2026, 4:00 pm3d left
Superintending Engineer
Irrigation, Kothagudem
Conducting detailed survey including Preliminary Investigation, Net level survey, taking Longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and Estimates of Distributory network including Minors or Sub-minors or Field Channels by conducting detailed block level survey for an extent 35,220 Acres to identify a minimum net ayacut of 29,937 Acres by proposing a PH at Pragallapalli Village, Dummugudem Mandal of Bhadradri Kothagudem District on Left Bank of Sitamma Sagar Multi Purpose Project.
735227
13/2026-27, Dt: 15.09.2026
OPEN
Consultancy
BHADRADRI KOTHAGUDEM, TELANGANA
17 documents required · 17 mandatory
₹5,902
₹1.7 L
17 Sept 2026
17 Sept 2026
17 Sept 2026
Conducting Chain and Prismatic survey of Major Distributories including alternatives for finalizing the Alignment as directed by the Engineer - in - Incharge including cost and conveyance of all materials, labour etc and supply of field records.
Conducting survey for Logitudinal Sections at an interval of 25 m, supply of plans neatly drawn on computer, including cost of materials, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records.
Carrying of DCBM value from G.T.S Bench mark to project site along the Major Distributory at an interval of 1.00 Km by conducting levelling and writing the values on RCC stone including cost and conveyance of materials, painting and all other materials, LF books and all operations required to carryout the finished item of work as directed by the Executive Engineer and supply of recorded LF books.
Conducting survey for Cross Sections at an interval of 25 m with levels taken at 5 m intervals for a length of 30/15 mt along cross section on either side, supply of cross section book neatly drawn on computer, including cost of materials, Stationery, hire charges of survey equipment, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records.
Providing and fixing DCBM Stones of size 20 x 20 x 75 cm in CC (1:4:8) using 40 MSA including cost of all materials, labour, painting BM reference etc., complete with a lead upto 50 m and all lifts. IRR PMW 2-8
Providing and fixing granite cuddy stones of size 20 x 20 x 75 cm in CC (1 : 4 : 8) for Land Acquisition boundary marking using 40 MSA including cost of all materials, labour, painting etc.,complete with a lead upto 50 m and all lifts as directed by the Engineer-in-Charge. IRR PMW 2-8
Providing and fixing granite cuddy stones of size 20 x 20 x 75 cm for Centre Line marking including cost of all materials, labour, painting etc.,complete with a lead upto 50 m and all lifts as directed by the Engineer-in-Charge. IRR PMW 2-8
Conducting the site surveys for CM & CD works on Major Distributories as per CE, CDO guide lines including labour charges, cost of materials, paints, all materials and operations required for finished item of work as directed by the Engineer-in-charge duly marking contour lines @1m interval and all other features etc.
Preparation of Hydraulic particulars of Major Distributory including all operations required to complete finished item of work as directed by Engineer-in-Charge
Design of CM & CD structures on Major Distributories and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by Engineer-in-Charge
Preparation of Estimates of CM&CD structures on Major Distributories as per departmental guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge .
Preparation of Earth work estimates of Major Distributories by adopting current SoR and Standard Data including labour charges, cost of drawing materials and all other materials and operations, required to complete finished item of work.
Conducting Geophysical investigation studies by Electrical Resistivity Method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete including cost of transportation arrangements. IRR-PMW-2-3
Preparation of Land Plan Schedules for Major Distributories as per the standards duly marking the boundary of land widths both on village maps showing the widths required Survey Number wise and holding wise for acquisition including labour charges, cost of materials and all materials and operations, required to complete finished item of work .
Conducting peg marking for land aquisition of Major Distributories for finalised Alignment including cost and conveyance of all materials, stationery, hire charges of survey equipments, labour and hire charges of jeep etc and supply of field records as directed by Engineer-in-Charge .
Investigation , Conducting block levels for contours at an intervel of 0.5 meter of distributory network system consisting of Minor/Distibutories/Minors/Sub-Minors up to field channel including perperation of Block command area maps.
Conducting preliminary investigation of minors/sub-minors including alternatives for finalizing the Alignment as directed by the Engineer - in - Incharge including cost of all materials , labour and supply of field records.
Conducting the site surveys for CM & CD works on Distributories with discharge varing between 3 to 10 cumecs as per CE, CDO guide lines including labour charges, cost of materials, paints, all materials and operations required for finished item of work as directed by the Engineer-in-charge duly marking contour lines @1m interval and all other features etc.
Conducting the site surveys for CM & CD works on Distributory with a discharge less than 3 cumecsas per CE, CDO guide lines including labour charges, cost of materials, paints, all materials and operations required for finished item of work as directed by the Engineer-in-charge duly marking contour lines @1m interval and all other features etc.
Design of CM & CD structures on Distributories with discharge varing between 3 to 10 cumecs and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials, etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge.
Design of CM & CD structures on Sub Minor Distributories with a discharge less than 3 cumecs and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials, etc. all materials, operations required to complete the finished item of work as directed by the as directed by Engineer-in-Charge.
Preparation of Estimates of CM&CD structures on Distributories with discharge varing between 3 to 10 cumecs as per departmental guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge.
Preparation of Estimates of CM&CD structures on Distributories with a discharge less than 3 cumecs as per departmental guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge.
Conducting survey for Logitudinal Sections on field channels at an interval of 25 m, supply of plans neatly drawn on computer, including cost of materials, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records.
Preparation of Hydraulic particulars of Field channel including all operations required to complete finished item of work and as directed by Engineer-in-Charge
Preparation of Earth work estimates of Field channel by adopting current SoR and Standard Data including labour charges, cost of drawing materials and all other materials and operations, required to complete finished item of work.
Design of CM & CD structures on Field Channels and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by the as directed by Engineer-in-Charge.
Preparation of Ayacut registers pipe wise on major, minor and sub-minor by asertaining the details such as the Sy.Nos, total Extent, Extent of irrigation, particulars of cultivation etc. from concerned revenue authorities and verifying the same in field marking suitable necessary corrections in command plans for each block including labour charges and all other materials and operations, required to complete finished item of work.
Hiring of vehicles for investigation and Land acquisition work including fuel, lubricants, minor repairs and salary of the driver etc. complete.
Accomodation for Investigation teams and Land Acquisition teams etc., complete.
Cost of Stationery, Computer typing, Printing and binding for the Index Maps of Canal Alignment including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Cost of Stationery, Computer typing, Printing and binding for HP's of main canal up to Sub-minorof Canal Alignment including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Cost of Stationery, Computer typing, Printing and binding for the following items Site Surveys, Design and Drawing booklets of Major, Minor and Sub Minors/CM&CD structuresincluding labour charges, cost of including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete. materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Cost of Stationery, Computer typing, Printing and binding for the following itemsEstimates for EWE & FE including CM&CD works including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Cost of Stationery, Computer typing, Printing and binding for the following items H.P's of Field Channel
Cost of Stationery, Computer typing, Printing and binding for the following items Field channel estimates including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Cost of Stationery, Computer typing, Printing and binding for the following items Land Plan Schedules village wise booklets including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Cost of Stationery, Computer typing, Printing and binding for the following items Ayacut Registers including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bid Document - Pragallapalli SID.docx
TENDER_DOCUMENT • 0.60 MB
BOQ-Pragallapalli PS -Upload.xlsx
TENDER_DOCUMENT • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .