| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 CrAccepted-Finance | ₹3.9 Cr | 1 | Accepted-Finance Lowest quoted rate |
| 2 | 2₹3.9 Cr+₹6.0 L (1.55%)Rejected-Finance | ₹3.9 Cr+₹6.0 L (1.55%) | 2 | Rejected-Finance High quoted rate |
| 3 | 3₹4.0 Cr+₹14.0 L (3.64%)Rejected-Finance | ₹4.0 Cr+₹14.0 L (3.64%) | 3 | Rejected-Finance High quoted rate |
| 4 | 4₹4.0 Cr+₹15.3 L (3.98%)Rejected-Finance | ₹4.0 Cr+₹15.3 L (3.98%) | 4 | Rejected-Finance High quoted rate |
| 5 | 5₹4.2 Cr+₹37.5 L (9.73%)Rejected-Finance | ₹4.2 Cr+₹37.5 L (9.73%) | 5 | Rejected-Finance High quoted rate |
Tender Value
₹6.2 Cr
EMD Value
₹12.5 L
Closing Date
24 Nov 2025, 3:00 pmClosed
ACE WR Zone Jaipur
O/o Additional Chief Engineer Water Resources Zone, Sinchai Bhawan JLN Marg, Jaipur
Construction of Anicut at Sanwa river at Village Syalawas Kalan G.P. Syalwas kalan. P.S. Bandikui District Dausa
2025_WRDAS_509925_1
ACE NIT 31/2025-26_Syalawas
Open Tender
Civil Works
Percentage
547 days
under jurisdiction of EE Dausa
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹12.5 L
Yes
Jaipur
12 Jan 2026
31 Oct 2025
25 Nov 2025
31 Oct 2025
24 Nov 2025
31 Oct 2025
12 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 2,002.53 | Sqm | 160 | ₹3,20,404.8 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 4,882.98 | Sqm | 220 | ₹10,74,255.6 |
| 3 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Curved edges or sides of special shapes like baffle or chute blocks, end sills, Basin Block, projected copings, extended sills, curved surfaces arches, circular ducts etc. | 245.36 | Sqm | 340 | ₹83,422.4 |
| 4 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 1,315.25 | Cum | 140 | ₹1,84,135 |
| 5 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 880.82 | Cum | 200 | ₹1,76,164 |
| 6 | Supply & fixing 6 mm thick rubber water seal of approved quality in construction/contraction joints as per drawing complete in all respect. 305 mm wide | 33 | R.M. | 675 | ₹22,275 |
| 7 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 1,57,788.38 | Kg. | 89 | ₹1,40,43,165.82 |
| 8 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 7,000 | Sqm | 1.45 | ₹10,150 |
| 9 | Supply of wire crates in required sizes made of hot dipped G.I. Wire conforming to IS 4826 -1979 having mesh of 10 cm x 10 cm (surface area of crate will be measured) made of wire of 5 mm diameter. | 2,330 | Sqm | 389 | ₹9,06,370 |
| 10 | Filling crates with stone, in position at site including hinging with hot dipped G.I. Wire 5 mm dia, excluding cost of wire crates, including cost of stones in position complete in all respects. | 1,500 | Cum | 1,090 | ₹16,35,000 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
SaliwaysBidDocument.pdf
Tender Documents • 2.69 MB
BOQ_908318.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .