Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAccepted-AOC SRIKOLI TULASIPUR TENTULIGAON NIMAPARA | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹24.1 L+₹2.4 L (11.1%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹25.3 L+₹3.6 L (16.6%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹25.6 L+₹3.9 L (17.8%)Rejected-Finance NOT AVAILABLE | NA | NA | 121004 | L4 | Rejected-Finance Rejected |
Tender Value
₹24.1 L
EMD Value
₹24,200
Closing Date
11 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Central Tender Cell
Central Tender Cell,UG Floor, ICOMC Tower.
Renovation of Children Park infront at Baragada Police Station Kalam Park and EB Colony Park at Brit Colony in Ward No. 57
2026_ORULB_126636_3
BMC-EE-Tender Cell-73/2025-26 Dt. 25.02.2026
Open Tender
Civil Works - Others
Percentage
75 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹24,200
Yes
Office chamber of the EE,Central Tender Cell
29 Oct 2026
28 Feb 2026
12 Mar 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
28 Feb 2026 - 5 Mar 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing old tiled flooring including removing the base coarse and stacking the useful materials for re-use and removing the debries within 50mtr lead (Data for 9.30 M2) | 102.6 | sqm | 144.25 | ₹14,800.05 |
| 2 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. (Data for 1 Cum) | 10.26 | cum | 858.58 | ₹8,809.03 |
| 3 | Earthwork in excavation in hard soil including rough dressing and leveling the bed and depositing the excavated materials at places away from the work site with all leads and lifts etc complete as per directed by the Engineer-in-charge. | 30.83 | cum | 230.74 | ₹7,113.71 |
| 4 | Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & P sundries etc complete as per direction of Engineer- in-charge. | 30.83 | cum | 160.68 | ₹4,953.76 |
| 5 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge. | 116.75 | cum | 519.79 | ₹60,685.48 |
| 6 | Providing & laying P.C:C: (1:4:8) using 4 cm. size H.G. (C.B) metal including the cost of all materials, labour carriage, royalty T& P and all Taxes etc complete as per direction of EIC. | 8.96 | cum | 5,775.39 | ₹51,747.49 |
| 7 | Fly ash brick masonry in C.M. (1:6) in founadtion & plinth and super structure using 25cm x 12cm x 8cm brick having crushing strength not less than 75 Kg / cm2 | 6.56 | cum | 5,475.69 | ₹35,920.53 |
| 8 | Fly ash brick masonry in C.M. (1:6) in founadtion & plinth and super structure using 25cm x 12cm x 8cm brick having crushing strength not less than 75 Kg / cm2 | 7.85 | cum | 5,511.52 | ₹43,265.43 |
| 9 | 16mm thick C.P. in C.M.(1:6) over Brick surface including close deep cheaping & slurry treatment including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 60.29 | sqm | 270.56 | ₹16,312.06 |
| 10 | Supplying all materials, labour, T&P and providing Cement Concrete/ CC (1:2:4) using 12 to 20mm size BHGCB chips including cost of all materials ,labour,T&P sundries etc. complete as per the direction of EIC. | 13.98 | cum | 7,743.92 | ₹1,08,260 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_583128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
DTCN_73.pdf
Tender Documents • 0.95 MB
BOQ_583128.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .