Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.7 LAccepted-AOC | ₹88.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹89.2 LRejected-AOC | ₹89.2 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹89.3 L
EMD Value
₹1.8 L
Closing Date
3 Jul 2026, 3:00 pmClosed
General Manager Zone-3 UPPCL Lucknow
Office of the General Manager Zone-3 UPPCL Lucknow
Tourism Development and Beautification of Pracheen Vishnu Mandir at Ashuran Chauk Distt. Gorakhpur
2026_UPPRC_1161662_1
19/GM-3/UPPCL/2026-27 DATE-18.06.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Gorakhpur
As per Bid Documents
2 documents required · 2 mandatory
₹11,800
₹1.8 L
13 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ghat | - | - | - | - |
| 2 | Excavation in foundation in ordinary Soil ( Loam clay or sand ) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30 m.from foundation trenches. | 78.56 | Cum | 194.19 | ₹15,255.57 |
| 3 | Filling of Carted earth. | 168.89 | CUM | 522.6 | ₹88,261.91 |
| 4 | Providing and laying Cement concrete 1:4:8 (1cement :4 coarse sand :8 graded stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation. | 29.64 | Cum | 5,081.98 | ₹1,50,629.89 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
| 6 | All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 40.5 | Cum. | 7,090.87 | ₹2,87,180.24 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
| 8 | All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 41.56 | Cum. | 7,356.19 | ₹3,05,723.26 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : | - | - | - | - |
| 10 | Foundations, footings, bases of columns, etc. for mass concrete | 15.25 | Sqm. | 292.56 | ₹4,461.54 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.13 MB
BID_DOC.pdf
Tender Documents • 12.92 MB
BOQ_2177563.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].