Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.3 L+₹4,462.40 (1.38%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.5 L+₹28,444 (8.80%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical As per Clause 19 (II) of the tender the reach of work for idt3 was different. |
| Sl No | Description | Qty | Unit | DHARAM PAL SINGH THEKEDAR L2 | M/s Rakesh Kumar Thekedar L1 | M/S DEV SINGH THEKEDAR L3 |
|---|---|---|---|---|---|---|
| 1.00Silt Clearance and scraping work Of Sakeet Dy From Km. 0.000 To Km. 9.480. | ||||||
| 1.01 | Silt clearance/trench digging Including lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc but execluding leveling dressing & compaction. | 10,711 | m3 | 25.9 ₹2,77,414.9 Lowest | 27.5 ₹2,94,552.5 | 31.5 ₹3,37,396.5 |
| 1.02 | Scrapping internal section of existing channel i.e. Left & Roght Sideslope Of Minor with silt up to 5 cm. | 14,400 | m2 | 3.5 ₹50,400 | 2 ₹28,800 | 1 ₹14,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹49,000
Closing Date
5 Oct 2026, 10:00 amClosed
Executive Engineer
silt clearance And Scraping work of Sakit Dy From Km. 0.000 To Km. 9.480
silt clearance And Scraping work of Sakit Dy From Km. 0.000 To Km. 9.480
2026_UPIDC_1189005_2
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
30 days
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹49,000
12 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Silt Clearance and scraping work Of Sakeet Dy From Km. 0.000 To Km. 9.480. | |||||
| 1.01 | Silt clearance/trench digging Including lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc but execluding leveling dressing & compaction. | 10,711 | m3 | 1.25 | ₹13,388.75 |
| 1.02 | Scrapping internal section of existing channel i.e. Left & Roght Sideslope Of Minor with silt up to 5 cm. | 14,400 | m2 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2244994.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .