Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 CrAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹30.1 Cr+₹2.1 Cr (7.44%)Rejected-AOC 236 2ND BLOCK 3RD FLOOR K K S ROAD SRIRAMAPURAM RANKA NEST APARTMENTS BANGALORE 560021 | BANGALORE | BANGALORE | KARNATAKA | 560021 | L2 | Rejected-AOC L2 Bidder | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| Sl No | Description | Qty | Unit | V.P.KARIKAL L1 | RAVINDRANATH CONSTRUCTIONS PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00EW : EARTH WORK | |||||
| 2.00Note: (i) Existing Ground level / TL shall be recorded jointly before starting of excavation. All surveying equipment (Total Station / Theodelite) shall be managed by contractor at his own cost. (ii) Carriage / Transport of unserviceable/ surplus earth/ excavated rock/ building rubbish/ malba/ debris/ dismantled or waste material to the designated dumping area will be measured and paid for separately under relevent item No. EW-8 (iii) Sufficient quantity of excavated serviceable soil shall be stacked at site for filling in trenches, plinth, sides of foundation / raft etc., to operate item No. EW-6 (iv) In case of open footings/Rafts/ Pile caps up to the depth of 1.5 metres, allround excavation of 30 cm beyond the outer dimension of footing shall be measured for payment to make allowances for centering and shuttering. Any additional excavation beyond this limit shall be at the risk and cost of the contractor and shall not be measured for payment. (v) In case of open footings/Rafts/ Pile caps at a depth of more than 1.5 metre, allround excavation of 75 cm shall be measured for payment to make allowance for centering and shuttering. Additional excavation beyond this limit shall be at the risk and cost of the contractor and shall not be measured for payment. (vi) The quoted rates for all excavation shall include the cost towards any dewatering (if required). (vii) The quoted rates for all excavation shall include the cost towards the side slope protection, shoring, strutting, etc. | |||||
| 3.00 | Clearing bushes including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level, removal and disposal of rubbish/ unserviceable material to the designated dumping area as directed by the Engineer-in-charge, complete as per specification. | 1,000 | sqm | 20,000 ₹23,600 | 18,000 ₹21,240 Lowest |
| 4.00Note: The quoted rate shall include loading, unloading and transportation of rubbish/unserviceable material. | |||||
| 5.00Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material to the designated dumping area as directed by the Engineer-in-charge, complete as per specification. | |||||
| 6.00Note: The quoted rate shall include loading, unloading and transportation of unserviceable material. | |||||
| 7.00 | Beyond 30 cm girth upto and including 60 cm girth | 2 | sqm | 1,000 ₹1,180 | 800 ₹944 Lowest |
| 8.00 | Beyond 60 cm girth upto and including 120 cm girth | 2 | sqm | 4,800 ₹5,664 Lowest | 5,000 ₹5,900 |
| 9.00 | Beyond 120 cm girth upto and including 240 cm girth | 1 | sqm | 7,500 ₹8,850 Lowest | 8,500 ₹10,030 |
| 10.00Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and stacking (maximum height 40cm) of excavated earth upto 50 m and lift upto 1.5 m, as directed by the Engineer-in-charge, complete as per specification. Note: The quoted rate shall include stacking and preserving the top fertile layer of soil & effective erosion and sedimentation control to prevent erosion around the excavated area and disposal of unserviceable earth to dumping area outside CDAC premises. The carriage of unserviceable earth to any dumping area shall not be paid | |||||
Tender Value
Refer Docs
EMD Value
₹55 L
Closing Date
6 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANAGER, ADMIN, MMG
Centre for Development of Advanced Computing CDAC Knowledge Park, No. 1, Old Madras Road, Baiyppanahalli
Extension of further floors on the 20PF Data Centre building at C-DAC Electronic City Campus, Bengaluru
2025_DIT_875500_1
CDACB/20PF-EXPANSION/25-26/001
Open Tender
Civil Works
Works
365 days
CENTRE FOR DEVELOPMENT OF ADVANCED COMPUTING
Please refer Tender Document
17 documents required · 17 mandatory
₹0
₹55 L
Yes
Please refer Tender documents
14 Feb 2026
1 Sept 2025
7 Oct 2025
1 Sept 2025
6 Oct 2025
1 Sept 2025
1 Sept 2025 - 8 Sept 2025
8 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | EW : EARTH WORK | - | - | - | - | - |
| 3 | Clearing bushes including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level, removal and disposal of rubbish/ unserviceable material to the designated dumping area as directed by the Engineer-in-charge, complete as per specification. | 1,000 | sqm | - | - | 0.18% |
| 5 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material to the designated dumping area as directed by the Engineer-in-charge, complete as per specification. | - | - | - | - | - |
| 7 | Beyond 30 cm girth upto and including 60 cm girth | 2 | sqm | - | - | 0.18% |
| 8 | Beyond 60 cm girth upto and including 120 cm girth | 2 | sqm | - | - | 0.18% |
| 9 | Beyond 120 cm girth upto and including 240 cm girth | 1 | sqm | - | - | 0.18% |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and stacking (maximum height 40cm) of excavated earth upto 50 m and lift upto 1.5 m, as directed by the Engineer-in-charge, complete as per specification.
Note:
The quoted rate shall include stacking and preserving the top fertile layer of soil & effective erosion and sedimentation control to prevent erosion around the excavated area and disposal of unserviceable earth to dumping area outside CDAC premises.
The carriage of unserviceable earth to any dumping area shall not be paid | - | - | - | - | - |
| 11 | In all kinds of soil | 500 | sqm | - | - | 0.18% |
| 12 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out the excavated earth and disposal of excavated earth outside CDAC premises
Note: Required serviceable earth for back filling should be stacked to operate item no. EW-6
The carriage of unserviceable/ surplus earth to designated dumping area shall be not be paid | - | - | - | - | - |
| 13 | In all kinds of soil for | - | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TS_29-08-2025.pdf
PDF • 11.58 MB
DRAWINGS_FINAL.pdf
PDF • 20.83 MB
RFP_FINAL.pdf
PDF • 0.94 MB
BOQ_920341.xls
BOQ • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .