Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 2 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 3 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 4 | L1₹21.4 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 5 | L1₹22.1 LAccepted-AOC | L1 | Accepted-AOC AWARDED |
| Sl No | Description | Qty | Unit | SRI HITESH KALITA L1 | M/S K.B. ENGINEERS L1 | MS D.M. ENTERPRISE L1 | M/S M R ENTERPRISE L1 | SKYLARK TRADERS L1 | M/S DHANANJALI ENTERPRISE L1 | M/S K M ENTERPRISE L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing of garbage, debris and waste materials from the drainage channel along bed and bank slopes of the channel including carriage of the spoils to a safe distance up to 100 m and stacking in measurable stacks etc. complete as directed. | 13,000 | cum | 480.38 ₹62,44,940 Lowest | 480.38 ₹62,44,940 Lowest | 480.38 ₹62,44,940 Lowest | 480.38 ₹62,44,940 Lowest | 480.38 ₹62,44,940 Lowest | 480.38 ₹62,44,940 Lowest | 480.38 ₹62,44,940 Lowest |
| 2.00 | Hire charges for heavy-duty flat low-bed trailer for carriage of hired chain-mounted hydraulic excavators including loading and unloading, fuel, POL, operator, helper etc. to the designated worksite . | 4 | Operation | 30,000 ₹1,20,000 Lowest | 30,000 ₹1,20,000 Lowest | 30,000 ₹1,20,000 Lowest | 30,000 ₹1,20,000 Lowest | 30,000 ₹1,20,000 Lowest | 30,000 ₹1,20,000 Lowest | 30,000 ₹1,20,000 Lowest |
| 3.00 | Hire charges for deployment of Chain Mounted Hydraulic Excavators – 210/220 with bucket capacity of 0.90 cum for desiltation and excavation of the drainage channel to the required grade and slope as per section including cutting and dressing of channel bed and slopes, removing deposited silt, debris, vegetation, etc. and loading of excavated muddy/slushy soil / garbage in hired Tripper/Dumper as directed including cost of operator, maintenance and all incidental charges excluding fuel/POL on daily basis considering 8 effective working hours per day. | 1,920 | Hour | 1,534 ₹29,45,280 Lowest | 1,534 ₹29,45,280 Lowest | 1,534 ₹29,45,280 Lowest | 1,534 ₹29,45,280 Lowest | 1,534 ₹29,45,280 Lowest | 1,534 ₹29,45,280 Lowest | 1,534 ₹29,45,280 Lowest |
| 4.00 | Deployment of JCB 4DX or equivalent Backhoe Loader Excavators on hire-charge basis for loading of excavated and stacked muddy/slushy soil, silt, garbage and other debris into tippers/dumpers including cost of operators, fuel/POL, maintenance and all incidental charges complete, with a minimum effective operation of 6 (six) hours per day. | 360 | Hr | 2,286.16 ₹8,23,017.6 Lowest | 2,286.16 ₹8,23,017.6 Lowest | 2,286.16 ₹8,23,017.6 Lowest | 2,286.16 ₹8,23,017.6 Lowest | 2,286.16 ₹8,23,017.6 Lowest | 2,286.16 ₹8,23,017.6 Lowest | 2,286.16 ₹8,23,017.6 Lowest |
| 5.00 | Hire charge of Tripper / Dumper of 10 Ton capacity along with operator including fuel and lubricant for carriage of excavated muddy/slushy soil / garbage and depositing the same in suitable dumping ground within an average lead of 5.00 KM and loading /unloading charges etc. complete. | 1,800 | Hour | 1,483.49 ₹26,70,282 Lowest | 1,483.49 ₹26,70,282 Lowest | 1,483.49 ₹26,70,282 Lowest | 1,483.49 ₹26,70,282 Lowest | 1,483.49 ₹26,70,282 Lowest | 1,483.49 ₹26,70,282 Lowest | 1,483.49 ₹26,70,282 Lowest |
| 6.00 | Engagement of ordinary labours for various assisting & helping requirements during de-siltation and excavation works of the drainage channel for watch keeping duty, clearing of jungles, garbage, plastics etc. from work site including intermittent cleaning. | 720 | Manday | 402.33 ₹2,89,677.6 Lowest | 402.33 ₹2,89,677.6 Lowest | 402.33 ₹2,89,677.6 Lowest | 402.33 ₹2,89,677.6 Lowest | 402.33 ₹2,89,677.6 Lowest | 402.33 ₹2,89,677.6 Lowest | 402.33 ₹2,89,677.6 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
17 Sept 2026, 2:00 pmClosed
Additional Chief Engineer, Mechnical Zone
O/o the Additional Chief Engineer, Mechnical Zone, Basistha, Ghy 29
Cleaning and De-siltation of Kalmoni Rivulet for Augmentation of Flow Capacity for the year 2026-27
2026_DoWR_53827_1
Mech/WR/690 03/09/2026
Open Tender
Civil Works
Works
Guwahati
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹2.6 L
Yes
7 Oct 2026
7 Sept 2026
17 Sept 2026
7 Sept 2026
17 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of garbage, debris and waste materials from the drainage channel along bed and bank slopes of the channel including carriage of the spoils to a safe distance up to 100 m and stacking in measurable stacks etc. complete as directed. | 13,000 | cum | 480.38 | ₹62,44,940 |
| 2 | Hire charges for heavy-duty flat low-bed trailer for carriage of hired chain-mounted hydraulic excavators including loading and unloading, fuel, POL, operator, helper etc. to the designated worksite . | 4 | Operation | 30,000 | ₹1,20,000 |
| 3 | Hire charges for deployment of Chain Mounted Hydraulic Excavators – 210/220 with bucket capacity of 0.90 cum for desiltation and excavation of the drainage channel to the required grade and slope as per section including cutting and dressing of channel bed and slopes, removing deposited silt, debris, vegetation, etc. and loading of excavated muddy/slushy soil / garbage in hired Tripper/Dumper as directed including cost of operator, maintenance and all incidental charges excluding fuel/POL on daily basis considering 8 effective working hours per day. | 1,920 | Hour | 1,534 | ₹29,45,280 |
| 4 | Deployment of JCB 4DX or equivalent Backhoe Loader Excavators on hire-charge basis for loading of excavated and stacked muddy/slushy soil, silt, garbage and other debris into tippers/dumpers including cost of operators, fuel/POL, maintenance and all incidental charges complete, with a minimum effective operation of 6 (six) hours per day. | 360 | Hr | 2,286.16 | ₹8,23,017.6 |
| 5 | Hire charge of Tripper / Dumper of 10 Ton capacity along with operator including fuel and lubricant for carriage of excavated muddy/slushy soil / garbage and depositing the same in suitable dumping ground within an average lead of 5.00 KM and loading /unloading charges etc. complete. | 1,800 | Hour | 1,483.49 | ₹26,70,282 |
| 6 | Engagement of ordinary labours for various assisting & helping requirements during de-siltation and excavation works of the drainage channel for watch keeping duty, clearing of jungles, garbage, plastics etc. from work site including intermittent cleaning. | 720 | Manday | 402.33 | ₹2,89,677.6 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_84593.xls
BOQ • 0.38 MB
bid_kalmoni.pdf
Tender Documents • 0.69 MB
extension_notice.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .