| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-Finance | 1 | Accepted-Finance ok | |
| 2 | 2₹8 L+₹70,115.66 (9.61%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | 3₹8.5 L+₹1.2 L (16.5%)Accepted-Finance | 3 | Accepted-Finance ok |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
24 Oct 2023, 6:00 pmClosed
DFO Udhampur
DFO Udhampur
Upgradation/Maintenance of Mand Nursery (Construction of 02 green poly house shed and water tank) Udhampur Forest Division under CAMPA FY 2023-24
2023_FD_232092_1
93 NIT of 2023-24
Open Tender
Civil Works
Item Wise
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Convener, purchase committee, Directorate of ISM
₹20,000
31 Oct 2023
6 Oct 2023
25 Oct 2023
6 Oct 2023
24 Oct 2023
6 Oct 2023
6 Oct 2023 - 16 Oct 2023
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 complete job
Dumping of stones incl supply/stacking/hand packing at site complete job.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level. 1:2:4 complete job
Centering and shuttering including strutting, propping etc. and removal of form for: : Foundations, footings, bases of columns etc. for mass concrete.complete job
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. complete job
Providing & Fixing Green House Net. complete job
Providing & Fixing Green Transparent Fibre Glass (Polycorbonate sheet double layer) Roofing sheet 2mm thick incl all fittings complete job.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Providing and fixing 1mm thick M.S. sheet Steel shutters with frame of 40x40x5mm angle iron, incld. Hinges earl nut bolt welding complete job .
Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution. Complete job.
Provision for sprinklers including upvc pipes and all other required items for installing and testing of sprinkler system for the area of 30'x29' Complete job. L.S
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
Providing and laying in position cement concrete of specified grade including curing but.excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but.excluding the cost of centring and shuttering. All work upto plinth level with: - 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth inCement mortar 1 :4 ( 1 cement : 4 coarse sand)
18mm plastering with terrazzo finish rubbed and polished complete, under layer 12mm thick cement plaster 1 :3 (1 cement : 3 coarse sand) and top layer 6mm thick white, black, chocolate, grey, yellow or Baroda green marble chips of 3mm and down size laid in cement marble powder mix 3 :1 (3 cement : 1 marble powder) by weight in proportion 4 : 7 (4 cement marble powder mix : 7 marble chips) by volume
12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) incl. all leads lifts carriages complete job.
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. Crushed.
Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors,balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Cold twisted bars
Edges of slabs and breaks in floors and walls Under 20 cm wide
Providing and fixing G.l. pipes complete with G.l. Fittings excluding trenching and refilling etc. (internal work) 80 mm complete job
Providing and fixing installing testing of three phase Centrifugal SS water Pump for lifting of water from 200 meter vertical lead including all required fittings of make like kirlosker, shakti Havells etc. complete job
KANTA DEVI
YASHPAL
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .