Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹22.9 L (13.4%)Admitted-Finance | ₹1.9 Cr+₹22.9 L (13.4%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹31.9 L (18.6%)Admitted-Finance | ₹2.0 Cr+₹31.9 L (18.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Amardeep Constructions L1 | M/S GHULAM MOHD. TANVIR AHMED L2 | M/S MOHD IQBAL AGOO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, Fabrication, Launching 75mtr Span Foot suspension Bridge over river Marsudhar at Yanwan Dachhan, including providing steel Decking (Complete) Towers four No’s main cables, wind guys, suspenders , Ties with fixtures & charges (Complete job) including all cost and carriages Anchor | 75 | Mtr | - | - | - |
| 2.00Earth work in excavation by manual means in trenches for foundations ,Drains,Pipes,cables etc.(Not exceeding)1.5mtr in width )and for shafts,Wells,Cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge ,disposed earth is to be levelled and neatly dressed :- | ||||||
| 2.10 | All Kinds of Soil | 266.39 | cum | - | - | - |
| 2.20 | Ordinary Rock | 239.63 | cum | - | - | - |
| 2.30 | Hard Rock ( Require Blasting) | 178.6 | cum | - | - | - |
| 3.00Extra for every addational lift of 1.5 mtr or part thereoff in | ||||||
| 3.10 | All Kinds of Soil | 506.02 | Cum | - | - | - |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement: 3 fine sand : 6 graded stone aggregate 40mm nominal size) from Crushed. including all cost and carriages | 175.2 | cum | - | - | - |
| 5.00 | Randam rubble masonary with hard stone from Nallah in foundation and plinth including levelling up with cement cone 1:6:12 (:1 cement :6 coarse sand :12 graded stone aggregate 20 mm nominal size) at plinth level with cement mortar 1:6 (1 cement :6 coarse sand )( Including all cost and carriages finished items) | 834.12 | cum | - | - | - |
| 6.00 | extra over item No.5 for work above Plinth level )( Including all cost and carriages finished items) | 834.12 | cum | - | - | - |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
11 Sept 2020, 4:00 pmClosed
Executive Engineer
PWD RnB Spl Sub Division Marwah
Construction of 75mtr Span foot suspension bridge over River Marsudar at Yanwan Earlier proposal at Krosa complete in all respects like construction of abutments anchor blocks wind guys anchor block in Random Rubble stone masonry in cement supply fa
2020_PWDJK_103229_1
06 of 2020-21 Dated 31/08/2020
Open Tender
Civil Works
Item Wise
180 days
Marwah
Construction of 75mtr Span foot suspension bridge over River Marsudar at Yanwan Earlier proposal at Krosa complete in all respects like construction of abutments anchor blocks wind guys anchor block in Random Rubble stone masonry in cement supply fa
3 documents required · 3 mandatory
₹6,000
Yes
Executive Engineer
₹3.3 L
Yes
8 Oct 2020
31 Aug 2020
12 Sept 2020
31 Aug 2020
11 Sept 2020
1 Sept 2020
Amount
Supply, Fabrication, Launching 75mtr Span Foot suspension Bridge over river Marsudhar at Yanwan Dachhan, including providing steel Decking (Complete) Towers four No’s main cables, wind guys, suspenders , Ties with fixtures & charges (Complete job) including all cost and carriages Anchor
Earth work in excavation by manual means in trenches for foundations ,Drains,Pipes,cables etc.(Not exceeding)1.5mtr in width )and for shafts,Wells,Cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge ,disposed earth is to be levelled and neatly dressed :-
All Kinds of Soil
Ordinary Rock
Hard Rock ( Require Blasting)
Extra for every addational lift of 1.5 mtr or part thereoff in
All Kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement: 3 fine sand : 6 graded stone aggregate 40mm nominal size) from Crushed. including all cost and carriages
Randam rubble masonary with hard stone from Nallah in foundation and plinth including levelling up with cement cone 1:6:12 (:1 cement :6 coarse sand :12 graded stone aggregate 20 mm nominal size) at plinth level with cement mortar 1:6 (1 cement :6 coarse sand )( Including all cost and carriages finished items)
extra over item No.5 for work above Plinth level )( Including all cost and carriages finished items)
Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) excluding cost of centering and shuttering crushed )( Including all cost and carriages finished items)
Pointing on stone work with cement mortar 1: 3 (1 cement : 3 fine sand) Flush Pointing )( Including all cost and carriages finished items)
Hand packed stone filling in Horizontal on level excluding cost of stone
Hand packed sand filling in Horizontal on level including all lead lift
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Mild steel and medium tensile steel bars )( Including all cost and carriages finished items)
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete. )( Including all cost and carriages finished items)
M/S GHULAM MOHD. TANVIR AHMED
M/S MOHD IQBAL AGOO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.25 MB
SBD.pdf
Other Document • 2.38 MB
BOQ_196830.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .