Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹49.0 L
Closing Date
19 Aug 2026, 3:00 pm
Yes (up to 2 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
1 condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
"Provision of Distributed Electronic Interlocking at Hisar station over Bikaner Division"
SNT-Proj-JP-2025-26-08R
SNT-Proj-JP-2025-26-08R
Open
Works - General
18 Months
Jaipur, Rajasthan
₹0
₹49.0 L
25 Jul 2026
25 Jul 2026
5 Aug 2026
294 items across 15 schedules · ₹23,95,96,868.15 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | For Station with routes more than 200 routes | Per Functional Vital Bit | 995.00 | 82,453.63 | 8,20,41,361.85 |
| 2 | Installation, wiring, testing and commissioning of EI System with 'Hot Standby' architecture as supplied upto 6 (six) line station. It includes transportation of material from consignee's depot to the site, erection and grouting of EI Relay Racks, fixing and wiring of all the interfacing relays (Vital & Non-Vital), installation and wiring of Microprocessor equipments, interface equipments, power supply equipments and all other associated accessories to make complete EI system to be functional. Note: (i) Technical Requirements are attached with tender document (ii) Contractor has to arrange simulator/simulation testing panel for testing and commissioning by Selection Table and Square Sheet for each Signalling function.(iii) Installation, wiring, testing and commissioning of EI system will be done by OEM after following all the guidelines/directives issued by RDSO from time to time. Inspection: Consignee Inspection charges: None Payment terms: 100% after commissioning | Station | 1.00 | 7,51,843.88 | 7,51,843.88 |
| 3 | For Station with routes less than 100 | Per Functional Vital Bit | 30.00 | 1,05,893.14 | 31,76,794.2 |
| 4 | Installation, wiring, programming, testing and commissioning of EI equipment supplied as per supply item in item no. 01010400 above of Chapter 1 of this SOR including transportation from Consignee's depot to site. The works and materials for installation, wiring, testing and commissioning, grouting, cutting of floors, walls, refilling of the same, re-plastering, required CC/ masonry works, fixing/ placing/ laying of insulated ladders/ casing-capping/ cable trays/ RCC/GI pipes / Cables, termination of cables with lugs/ connectors, painting/ lettering are to be provided/ done by the contractor for the equipments supplied vide item no. 01010400 of Chapter 1 of SOR. This also covers the networking of built in EI Data loggers of all the stations to monitor the system to any other places where desired by Engineer-in-charge. (THIS ITEM SHALL BE USED ONLY FOR ALTERTION WORK IN EXISTING EI) Note: Installation shall be complied to RDSO Technical Advisory Note No STE/E/TAN/3012 dtd. 28.08.2014. Installation, wiring, programming, testing and commissioning of Operator VDU in Hot stand-by with Redundancy. Any Equipments/cards/Modules required for Hot stand-by with Redundancy shall be supplied and Installed by the Contractor. Note: This also includes supply of Two nos. of composite computer and printer table (Godrej work station table) and one no Godrej make operator chair model PCH7001. Termination of indoor/ PIJF cables in relay room on relays, tag blocks, CT racks as per approved wiring diagram including alterations/ modifications as required at site. Soldering to be done at all required termination. Dressing/ lacing of wiring shall be done neatly with help of dressing thread / plastic self lock strip of suitable size. The tools/ equipments/ materials/ simulation boards required for testing shall be supplied / fabricated by contactor. This includes replacement of modules/ cards/ LEDs/ equipments going defective during testing. Necessary power supply boards with required capacity plugs, sockets, surge and lightning protection boxes shall be supplied and installed by the contractor. 230V supply shall be arranged by Railways. In case supplies are required to be extended, from Power room / relay room then same shall be extended by the contractor with his own materials such as 1X16 sq mm wires, cables, lugs, RCC/GI pipes, insulated ladders etc. After ST/LT testing, Factory Acceptance Tests (FAT) and Square Sheet testing system should be fault free while submitting to Railways, otherwise suitable necessary action can be taken by Engineer-in-charge. Inspection: Consignee, Inspection charges: None, Payment terms: 100% after commissioning. | Job | 3.00 | 6,53,241.66 | 19,59,724.98 |
| 5 | Supply of work station note book / tablet as per Technical Specifications. It also includes supply of Laser Printer (Only branded). The workstation should be capable of reconfiguring the system in case of any alteration in yard interlocking in future. Technical Specifications should be attached with the tender document by Tendering authority. Inspection: Consignee Inspection charges: None Payment terms: 100% after supply | Station | 1.00 | 1,04,575.4 | 1,04,575.4 |
| 6 | Supply of Instruments and Tool Kits required for Trouble Shooting and repair of hardware and software for EI system should be supplied for stations. (This includes tools required for EI maintenance sorts of crimping, insertion, removal, general purpose tools like screw drivers, spanners, PCB extractor, temp. controlled soldering iron, wire cutter, nose pliers etc. & measuring instruments with carrying case/ holders/ cabinet for technicians/ J.E. for testing, Maintenance and repair at site). Each set comprises of the following :- * Crimping tool for all types of special cable assembly used in EI system. * Insertion tool for all types of special cable assembly used in EI system. *Removal tool for all types of special cable assembly used in EI system. * Digital multi-meter (Fluke 111 or better) * Steel cabinet/ Almira, Size: 1980mm height, 915 mm width and 485 mm depth (Godrej Make/Jalaram) of good quality to store tool, spare cards and documents. * Steel Book rack Size: 1850mm height, 900 mm width and 316 mm depth for keeping documents. (Godrej Make/Jalaram) * Clamp Earth Tester. (as per specs mentioned in tender document.) * Clamp Current Meter (fluke 362 or superior) * Ferrule tagging printer for cable/wires (Supported label tape sizes: 6 / 9 / 12 / 18 / 24 mm). Inspection: Consignee Inspection charges: None Payment terms: 100% after supply | Set | 1.00 | 1,51,338.52 | 1,51,338.52 |
| 7 | Training of Technician/ Jr. Engineer for installation, Commissioning, Testing, Repairs & Troubleshooting of EI system. (Hard copies of training material/ course modules to be given to each participant). Inspection: Consignee Inspection charges: None Payment terms: 100% after execution | Man-Days | 30.00 | 1,331.35 | 39,940.5 |
| 8 | Training of Officers for installation, Commissioning, Testing, Repairs & Troubleshooting of EI system. (Hard copies of training material/ course modules to be given to each participant). Inspection: Consignee Inspection charges: None Payment terms: 100% after execution | Man-Days | 10.00 | 1,320.4 | 13,204 |
| 9 | Preparation of SWR literature in English along with associated mid-section interlocked gate with all corrections as per approved SWRD & approved SIP. For these all-technical corrections, editing, grammatical correction etc. are to be carried out and one rough print to be given to railways for approval before printing, as required for final processing of CRS sanction. This also includes preparation of maintenance cards in format provided by Rly. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Station | 1.00 | 4,330.94 | 4,330.94 |
| 10 | Translation of Station Working Rules from English to Hindi and framing out in DIGLOT form (or similar software) as per extant Rly practice. The required SWR in English will be provided by the contractor and has been covered separately in item no. 01011800 of Chapter 1 of SOR. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Station | 1.00 | 5,389.49 | 5,389.49 |
| 11 | Making photocopies & binding of the SWR literature in English/Hindi/Diglot form as per Railway practice. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Set | 6.00 | 214.85 | 1,289.1 |
| 12 | Supply of maintainer's furniture of Godrej make or superior and each set consist of (i) executive revolving bearing series low back-floating chair with normal arms cushioned chair-01 Nos. (ii) Executive table size 1650x900x728 mm with 3 drawers one side locker- 01 no. (iii) visitor chair seat & back cushion with high density foam with plastic PVC handle capsule type painted back-03 nos. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Set | 2.00 | 27,664.71 | 55,329.42 |
| 13 | Designing and Plotting of Signalling Interlocking Plan (SIP) in AUTOCAD. Two copies of prints with soft copy will be submitted to Railway for checking. If alterations are suggested/proposed by Railways then again two copies of prints will be submitted for advance approval after carrying out all the alterations as suggested/proposed by the Railways. Tracings will be submitted for all the diagrams mentioned above for the purpose of approval by Railway prior to commissioning of station. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Per SIP | 1.00 | 33,772.62 | 33,772.62 |
| 14 | Addition/alteration in existing relay room wiring. It includes supply of PVC insulated indoor Railway signalling cable @40<45@Core/40-Core) of (1/0.6) sqmm as per RDSO Spee. No. IRS/S-76/89 (Amnd.2 or latest) for wiring between relay room and SM's/Panel room & Relay room to DP in SM office for block working. This also includes supply of PVC insulated jumper wires of multi strand 16/.2 mm, tinned in all colours as per RDSO Specn.No.IRS-S- 76/89(Amnd.2 or latest). This item will include bringing all the power supplies from power room to respective bus bars on relay racks by using 10/6 sqmm copper flexible wire as per instructions of engineer incharge. This will include wiring between control panel and relay room if required. All wiring will be done as per standard practice of North Western Railway with neat dressing & threading. The item includes supply & wiring of tag block, fuse with bases (G- Type and ND Type) and all other related material required for complete indoor wiring in relay room.Inspection: ConsigneeInspection charges: NonePayment terms:100% after execution. | Per Relay | 50.00 | 630.75 | 31,537.5 |
| 15 | For Supply of Modular power supply arrangement. Payment Terms: 100% after Supply | Set | 2.00 | 2,18,289.6 | 4,36,579.2 |
| 16 | For Installation of Modular power supply arrangement. Payment Terms: 100% after Commissioning | Set | 2.00 | 54,572.4 | 1,09,144.8 |
| Schedule total | ₹8,89,16,156.4 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCUpdateduptoACS-73.pdf
ATTACHMENT
NWRCableDuctPolicy11032024.pdf
ATTACHMENT
HSR-N-ExisitngModelSIP.pdf
ATTACHMENT
DCTCRedundancyofTailCables.pdf
ATTACHMENT
20250612ActionPlantocontrolCableCutsduringworks.pdf
ATTACHMENT
20260513SegregationofdirtycleanwireinwiringofEIsystem.pdf
ATTACHMENT
FunctionDescriptionWritingworkforSignallingInstallation.160326.pdf
ATTACHMENT
ProvisionofKavachreadyInterfacesinElectronicInterlocking.pdf
ATTACHMENT
11_03_25TechnicalSystemApplicationApprovalTSAAofDigitalAxleCountersysteminstallationsbeforecommissioining.pdf
ATTACHMENT
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111_compressed1.pdf
ATTACHMENT
HISARStdTenderDocument-08R.pdf
ATTACHMENT
HISARTechnicalTenderDocument-08R.pdf
ATTACHMENT
HSRSTDTenderDocument-Revised.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].