Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-Finance | ₹15.7 L | L1 | Accepted-Finance Lowest Bid. |
| 2 | L2₹15.8 LRejected-Finance | ₹15.8 L | L2 | Rejected-Finance Higher Bid. |
Tender Value
₹15.8 L
EMD Value
₹32,000
Closing Date
23 Jun 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
Near-Civil court, Raja Market,Behind Sai Temple, Lucknow Road,Gonda-271001
Janpad Balrampur Vikas Khand Tulsipur ke Gram Panchayat Kanahra ke majra Piyaredeeh me PWD road Laibuddi-Nanahuapur sampark marg se Maheshwari Prasad Tiwari ke ghar tak 700 mtr Mitti/ Khadanja evm 1 mtr Span ki puliya ka karya.(V.N.Tulsipur).
2026_SCIDC_1159702_1
188/E.E/GONDA /BLP / V.N. TULSIPUR /E-TENDER /2026-27 DATE-11.06.2026
Open Tender
Civil Works - Roads
Percentage
180 days
Office UPSCIDCO GONDA
Please refer to Tender Notice
2 documents required · 2 mandatory
₹1,652
UPSCIDCO
₹32,000
UPSCIDCO GONDA
4 Jul 2026
11 Jun 2026
23 Jun 2026
11 Jun 2026
23 Jun 2026
11 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Work | - | - | - | - |
| 2 | Construction of Embankment with approved material obtained from borrow pits with a all lead and lift upto 1.5 m, spreading ,grading to requirement of Tables 300-1 and 300.2 as per Technical Specification Clause 301.5 including Royalty.(SOR-253) | 1,938.56 | Cum. | 104.5 | ₹2,02,579.52 |
| 3 | First Class Bricks on edge flooring laid dry joints sand filled including perparation of base to proper slope and its ramming and including supply of all materials, labour and T & P etc. required for proper completion of the work (SOR-615) | 2,100 | Sqm | 532 | ₹11,17,200 |
| 4 | 1-00eh Liku vkj0lh0lh0 iqfy;k-Earth work in excavation and disposal of excavated earth including garbage and malwa up to 1.00 km.etc. | 11.69 | Cum. | 118.75 | ₹1,388.19 |
| 5 | P.C.C. in 1:4:8 with 40mm gauge brick ballast (Coarse sand & cement) including supply of Labour Material etc.upto proper completion of works. | 5.65 | Cum. | 4,085 | ₹23,080.25 |
| 6 | Class -150 brick work in 1:4 cement and coarse sand mortar in foundation and superstructure as pre MORD. | 17.78 | Cum. | 5,320 | ₹94,589.6 |
| 7 | Laying C.C.Slab wih 20mm gauge stone grit coarse sand & cement in 1:1.5:3 including supply of all labour material & T &P etc.required for proper completion of works. | 3.79 | Cum. | 9,895.77 | ₹37,504.97 |
| 8 | Mild Steel or Iron in plain work such as reinforced concrete or reinfoced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured upto floor two level. | 511.86 | kg | 58.9 | ₹30,148.55 |
| 9 | struck pointing with cementmortar conisting of 1 part cement &2 parts of fine sand of 1.25 fineness modulus on brick work including supply of all materials labour & tools & plants etc.required for proper completion of the work. (S.I.No.575) | 18.58 | Sqm | 142.5 | ₹2,647.65 |
| 10 | 600,e0,e0,d ux g~;we ikbi iqfy;k dk dk;Z-Earth work in excavation and disposal of excavated earth including garbage and malwa up to 1.00 km.etc. | 4.5 | Cum. | 118.75 | ₹534.38 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2173369.xls
BOQ • 0.25 MB
122.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].