| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹36.0 L+₹6.6 L (22.6%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹38.0 L+₹8.6 L (29.3%)Rejected-Finance | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹38.0 L+₹8.7 L (29.5%)Rejected-Finance VILLAGE GOROIMARI PO HALESWAR TEZPUR 784104 DIST SONITPUR ASSAM | SONITPUR | ASSAM | 784104 | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹39.9 L+₹10.6 L (36.0%)Rejected-Finance AIR FORCE ROAD GORAIMARI PO HALESWAR PS TEZPUR DISTT SONITPUR ASSAM 784104 | SONITPUR | ASSAM | 784104 | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | KHANS L10 | Evergreen Firm L9 | M/S N G CHOWDHURY L1 | Singhs Construction L4 | M/S R.B. Construction L5 | M/S Annu Electronics L7 | M/S Kangkans L6 | MAT ENTERPRISE L3 | M/S SHIVAYA ENGINEERING L8 | M/s GOURAB JYOTI GOGOI L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Bringing approved earth from outside Ministry of Defence (MOD) land and deposited in craters, including spreading, levelling in layers not exceeding 25 cm thick, complete all as specified and directed.
NOTES:- (i) Approved earth brought in shall be stacked properly on levelled surfaces before using for spreading and levelling.
(ii) Measurements of the finished surface of earth filling shall be taken and 20% shall be deducted to allow for increase in bulge.
(iii) Sample of Earth to be bought in shall be got approved by Engineer-in Charge in writing by the contractor before bringing in the earth required under this item.
(iv) The quoted rate shall be inclusive of royalty for earth obtained from outside MOD land.
(v) Earth shall be obtained from sources approved by Engineer-in Charge from a distance exceeding 5 KM but not exceeding 10 KM outside MOD land. | 1,600 | CUM | 710 ₹11,36,000 | 640 ₹10,24,000 | 500 ₹8,00,000 Lowest | 635 ₹10,16,000 | 700 ₹11,20,000 | 900 ₹14,40,000 | 695 ₹11,12,000 | 645 ₹10,32,000 | 655 ₹10,48,000 | 580 ₹9,28,000 |
| 2.00 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., n exc. 1.50M high from base, complete all as specified and directed. | 80 | CUM | 730 ₹58,400 | 680 ₹54,400 | 510 ₹40,800 Lowest | 730 ₹58,400 | 720 ₹57,600 | 920 ₹73,600 | 750 ₹60,000 | 700 ₹56,000 | 690 ₹55,200 | 650 ₹52,000 |
| 3.00 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., exc. 1.5 M but n exc.3.0 M high from base, complete all as specified and directed. | 40 | CUM | 765 ₹30,600 | 700 ₹28,000 | 530 ₹21,200 Lowest | 795 ₹31,800 | 745 ₹29,800 | 950 ₹38,000 | 770 ₹30,800 | 725 ₹29,000 | 700 ₹28,000 | 665 ₹26,600 |
| 4.00 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., exc. 3.0 M but n exc.4.5 M high from base, complete all as specified and directed. | 25 | CUM | 775 ₹19,375 | 720 ₹18,000 | 545 ₹13,625 Lowest | 825 ₹20,625 | 800 ₹20,000 | 970 ₹24,250 | 795 ₹19,875 | 745 ₹18,625 | 745 ₹18,625 | 690 ₹17,250 |
| 5.00 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., exc. 4.5 M but n exc. 6.0 M high from base, complete all as specified and directed.
NOTES:- (Applicable for BOQ Serial Item No. 2, 3, 4 & 5) (i) Approved earth brought in shall be stacked properly on levelled surfaces before using for forming embankments. (ii) Measurements of the finished embankment, traverse of earth filling shall be taken after consolidation and 20% deducted to allow for increase in bulge.
(iii) Payment shall be made for net quantity after compaction, worked out based on initial levels and finished levels.
(iv) Sample of Earth to be brought in shall be got approved by Engineer-in Charge in writing by the contractor before bringing in the earth required under this item.
(v) The quoted rate shall be inclusive of royalty for earth obtained from outside MOD land.
(vi) Earth shall be obtained from sources approved by Engineer-in Charge from a distance exceeding 5 KM but not exceeding 10 KM outside MOD land. | 8 | CUM | 790 ₹6,320 | 750 ₹6,000 | 580 ₹4,640 Lowest | 900 ₹7,200 | 820 ₹6,560 | 1,000 ₹8,000 | 810 ₹6,480 | 755 ₹6,040 | 780 ₹6,240 | 730 ₹5,840 |
| 6.00 | Collection of existing loose earth due to bombing/firing at site by manual/mechanical means, removing the same to a distance not exceeding 50 Metres and deposited including spreading, levelling in layers not exceeding 25 cm thick in craters, complete all as specified and directed.
NOTES:-
(i) Loose earth collected at site shall be stacked properly on levelled surfaces before using for spreading and levelling.
(ii) Measurements of the finished surface of earth filling shall be taken and 20% deducted to allow for increase in bulge. | 1,150 | CUM | 98 ₹1,12,700 | 105 ₹1,20,750 | 78 ₹89,700 Lowest | 86 ₹98,900 | 85 ₹97,750 | 115 ₹1,32,250 | 88 ₹1,01,200 | 82 ₹94,300 | 90 ₹1,03,500 | 90 ₹1,03,500 |
| 7.00 | Supply and Stacking sand bags with sand packed in High Density Polyethelene (HDPE)/Polypropylene(PP) woven sacks of size 95-105 cm (H) x 61 cm (W) [Sacks used for packaging of 50 Kgs cement (OPC/PPC)], complete all as specified and directed.
NOTES:-
(i) Loose sand shall be stacked properly on levelled surfaces before filling in HDPE/PP bags.
(ii) Stack measurements shall be taken after considering deduction of 12 % to allow for increase in bulge.
(iii) The quoted rate shall be inclusive of royalty for sand.
(iv) The opening of HDPE/PP bags shall be duly stiched using suitable nylon thread after filling in of sand. | 900 | CUM | 880 ₹7,92,000 | 950 ₹8,55,000 | 850 ₹7,65,000 | 955 ₹8,59,500 | 950 ₹8,55,000 | 750 ₹6,75,000 Lowest | 890 ₹8,01,000 | 915 ₹8,23,500 | 850 ₹7,65,000 | 900 ₹8,10,000 |
| 8.00 | Ploughing not exceeding 30 cm deep and averaging 15 cm deep in target area in any type of soil and leveling including demetaling (separation of pebbles) and other foreign materials of the existing earth surface using suitable earth, ploughing equipment (by mechanical equipment) to form a loose/porous soil, complete all as directed by Engr-in-Charge.
NOTES:-
(i) Ploughing shall be done so as to acheive soft earth in the target area.
(ii) Levelling shall be done so as to acheive levelled surfaces in the target area. | 6,650 | 100 Sqm | 295 ₹19,61,750 | 300 ₹19,95,000 | 175 ₹11,63,750 Lowest | 250 ₹16,62,500 | 265 ₹17,62,250 | 235 ₹15,62,750 | 275 ₹18,28,750 | 255 ₹16,95,750 | 295 ₹19,61,750 | 240 ₹15,96,000 |
| 9.00 | Materials and Labour for marking targets (LBT, PBT, FGT & Foul Line) by sprinkling uniformly lime powder at the rate of 1.00 Kg per square metre as in preparatory work for firing operations, complete all as specified and directed.
NOTES:-
(i) This item of work is for target marking in target area.
(ii) The requirement of target marking will be intimated by the users in short notice before firing operations and accordingly the same will be conveyed to the contractor by MES. | 475 | 10 SQM | 92 ₹43,700 | 80 ₹38,000 | 78 ₹37,050 Lowest | 97 ₹46,075 | 90 ₹42,750 | 110 ₹52,250 | 92 ₹43,700 | 86 ₹40,850 | 82 ₹38,950 | 128 ₹60,800 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
5 Aug 2026, 6:00 pmClosed
GE (AF) Tezpur
PO- Salonibari, Air Force Station, Tezpur - 784104
REPAIR/ MAINT TO CRATER FILLING IN PBT, LBT AND OTHER RANGE INFRASTRUCTURE WORK AT DM RANGE UNDER GE (AF) TEZPUR
2026_MES_766857_2
8155/E8
Open Tender
Civil Works
Item Rate
180 days
DM Range, North Lakhimpur
Class D category a(i)
7 documents required · 7 mandatory
₹500
Yes
GE (AF) TEZPUR
₹80,000
Yes
20 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
5 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bringing approved earth from outside Ministry of Defence (MOD) land and deposited in craters, including spreading, levelling in layers not exceeding 25 cm thick, complete all as specified and directed.
NOTES:- (i) Approved earth brought in shall be stacked properly on levelled surfaces before using for spreading and levelling.
(ii) Measurements of the finished surface of earth filling shall be taken and 20% shall be deducted to allow for increase in bulge.
(iii) Sample of Earth to be bought in shall be got approved by Engineer-in Charge in writing by the contractor before bringing in the earth required under this item.
(iv) The quoted rate shall be inclusive of royalty for earth obtained from outside MOD land.
(v) Earth shall be obtained from sources approved by Engineer-in Charge from a distance exceeding 5 KM but not exceeding 10 KM outside MOD land. | 1,600 | CUM | - | - |
| 2 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., n exc. 1.50M high from base, complete all as specified and directed. | 80 | CUM | - | - |
| 3 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., exc. 1.5 M but n exc.3.0 M high from base, complete all as specified and directed. | 40 | CUM | - | - |
| 4 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., exc. 3.0 M but n exc.4.5 M high from base, complete all as specified and directed. | 25 | CUM | - | - |
| 5 | Bringing approved earth from outside Ministry of Defence (MOD) land and depositing where directed, including forming embankments, raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming and finishing to required size, shape, etc., exc. 4.5 M but n exc. 6.0 M high from base, complete all as specified and directed.
NOTES:- (Applicable for BOQ Serial Item No. 2, 3, 4 & 5) (i) Approved earth brought in shall be stacked properly on levelled surfaces before using for forming embankments. (ii) Measurements of the finished embankment, traverse of earth filling shall be taken after consolidation and 20% deducted to allow for increase in bulge.
(iii) Payment shall be made for net quantity after compaction, worked out based on initial levels and finished levels.
(iv) Sample of Earth to be brought in shall be got approved by Engineer-in Charge in writing by the contractor before bringing in the earth required under this item.
(v) The quoted rate shall be inclusive of royalty for earth obtained from outside MOD land.
(vi) Earth shall be obtained from sources approved by Engineer-in Charge from a distance exceeding 5 KM but not exceeding 10 KM outside MOD land. | 8 | CUM | - | - |
| 6 | Collection of existing loose earth due to bombing/firing at site by manual/mechanical means, removing the same to a distance not exceeding 50 Metres and deposited including spreading, levelling in layers not exceeding 25 cm thick in craters, complete all as specified and directed.
NOTES:-
(i) Loose earth collected at site shall be stacked properly on levelled surfaces before using for spreading and levelling.
(ii) Measurements of the finished surface of earth filling shall be taken and 20% deducted to allow for increase in bulge. | 1,150 | CUM | - | - |
| 7 | Supply and Stacking sand bags with sand packed in High Density Polyethelene (HDPE)/Polypropylene(PP) woven sacks of size 95-105 cm (H) x 61 cm (W) [Sacks used for packaging of 50 Kgs cement (OPC/PPC)], complete all as specified and directed.
NOTES:-
(i) Loose sand shall be stacked properly on levelled surfaces before filling in HDPE/PP bags.
(ii) Stack measurements shall be taken after considering deduction of 12 % to allow for increase in bulge.
(iii) The quoted rate shall be inclusive of royalty for sand.
(iv) The opening of HDPE/PP bags shall be duly stiched using suitable nylon thread after filling in of sand. | 900 | CUM | - | - |
| 8 | Ploughing not exceeding 30 cm deep and averaging 15 cm deep in target area in any type of soil and leveling including demetaling (separation of pebbles) and other foreign materials of the existing earth surface using suitable earth, ploughing equipment (by mechanical equipment) to form a loose/porous soil, complete all as directed by Engr-in-Charge.
NOTES:-
(i) Ploughing shall be done so as to acheive soft earth in the target area.
(ii) Levelling shall be done so as to acheive levelled surfaces in the target area. | 6,650 | 100 Sqm | - | - |
| 9 | Materials and Labour for marking targets (LBT, PBT, FGT & Foul Line) by sprinkling uniformly lime powder at the rate of 1.00 Kg per square metre as in preparatory work for firing operations, complete all as specified and directed.
NOTES:-
(i) This item of work is for target marking in target area.
(ii) The requirement of target marking will be intimated by the users in short notice before firing operations and accordingly the same will be conveyed to the contractor by MES. | 475 | 10 SQM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tender8155.pdf
Tender Documents • 0.55 MB
BOQ_874375.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .