Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹1.4 Cr+₹7.2 L (5.60%)Rejected-Finance | ₹1.4 Cr+₹7.2 L (5.60%) | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
4 May 2023, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Strengthening of 3 Rural Roads at Kundrathur Block in Kancheepuram District having PKG No.TNKPM 09/2022-23
2023_RDTN_304028_1
DIPR/2142/Tender/2023 dt.14.04.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
Kancheepuram District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.3 L
O/o The Project Director DRDA Kancheepuram
12 Jul 2023
19 Apr 2023
4 May 2023
19 Apr 2023
4 May 2023
19 Apr 2023
25 Apr 2023
Amount
Part I - Strengthening of Moulivakkam HC Road in KM 0/0 to 0/600 (R-165 ) In Moulivakkam Panchayat cost of Construction cost Rs.44.28 Lakh & Maintaenance Cost Rs.2.16 lakh
Picking 5 cm to 10 cm exiting surface and sectioning-1 sqm etc completed
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50mm Consolidated thickness of Bitumenous Macadam using graded metal using Bitumen 60/70 grade including cost and conveyance and all other labour charges etc complete as per Clause 504 of MOST Specification
Applying Tack coat over the BT surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges etc complete
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fillning of gritty gravel from approved quarry and laid in layers including cost and conveyance of all material to site and labour charges etc
Providing and laying of Hot applied Thermoplastic Compound 2.50mm thick includind Reflectorising Glass beads as per IRC 35 etc complete
Provision For HM Stone
Stop - Warning Sign board
Sharp Curves - Curve Warning Sign Board
Hazards sign - hazardors object to be painted / marked
Speed Breaker Sign-speed breaker to be printend in black and white & cautionary sign board to be provided
Sign board needs to be provided with Proper sign
School and Habitation - Cautionary Sig on both direction
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II - Strengthening of RR Annexe Road in Km 0/0 - 0/650 (R-149) at Paraniputhur Panchayat cost of Construction cost Rs.33.30 Lakh & Maintaenance Cost Rs.2.34 lakh
Picking 5 cm to 10 cm exiting surface and sectioning-1 sqm etc completed
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface Usingi with Bitumen binder at 7.00Kg /10 Sqmm including cost and conveyance of all material and all labour charges etc complete
Providing and laying 50mm Consolidated thickness of Bitumenous Macadam using graded metal using Bitumen 60/70 grade including cost and conveyance and all other labour charges etc complete as per Clause 504 of MOST Specification
Applying Tack coat over the BM surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges etc complete
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Suplly and fillning of gritty gravel from approved quarry and laid in layers including cost and conveyance of all material to site and labour charges etc
Providing and laying of Hot applied Thermoplastic Compound 2.50mm thick includind Reflectorising Glass beads as per IRC 35 etc complete
Provision For HM Stone
Stop - Warning Sign board
Sharp Curves - Curve Warning Sign Board
Hazards sign - hazardors object to be painted / marked
Speed Breaker Sign-speed breaker to be printend in black and white & cautionary sign board to be provided
Sign board needs to be provided with Proper sign
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part III - Strengthing o f Ayyanpanthangal Noombal Mettu Street in KM 0/0- 0/800 (R-163) of Ayyanpanthangal Panchayat cost of Construction cost Rs.45.41 Lakh & Maintaenance Cost Rs.2.88 lakh
Picking 5 cm to 10 cm exiting surface and sectioning-1 sqm etc completed
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface Usingi with Bitumen binder at 7.00Kg /10 Sqmm including cost and conveyance of all material and all labour charges etc complete
Providing and laying 50mm Consolidated thickness of Bitumenous Macadam using graded metal using Bitumen 60/70 grade including cost and conveyance and all other labour charges etc complete as per Clause 504 of MOST Specification
Applying Tack coat over the BM surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges etc complete
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fillning of gritty gravel from approved quarry and laid in layers including cost and conveyance of all material to site and labour charges etc
Providing and laying of Hot applied Thermoplastic Compound 2.50mm thick includind Reflectorising Glass beads as per IRC 35 etc complete
Provision For HM Stone
Stop - Warning Sign board
Sharp Curves - Curve Warning Sign Board
Hazards sign - hazardors object to be painted / marked
Speed Breaker Sign-speed breaker to be printend in black and white & cautionary sign board to be provided
Sign board needs to be provided with Proper sign
School and Habitation - Cautionary Sig on both direction
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K MAHADEVAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .