Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹57.8 L (21.4%)Admitted-Finance | ₹3.3 Cr+₹57.8 L (21.4%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6.6 L
Closing Date
27 Feb 2020, 4:30 pmClosed
Ex.Engineer, CDK, JKSC
Adm Block, Bakhshi Stadium Srinagar
Renovation/Addition Alteration of Sher-i-Kashmir Indoor Sports Complex, Srinagar (Main Building).
2020_SPORT_92597_1
NIT No 103 of 2019-20
Open Tender
Civil Works
Item Rate
120 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,500
Ex.Engineer, CDK, JK Sports Council
₹6.6 L
8 Jun 2020
12 Feb 2020
28 Feb 2020
12 Feb 2020
27 Feb 2020
14 Feb 2020
Amount
Finishing with Epoxy paint (Two or More coats) at all locations prepared and applied as per manufactures specifications including appropriate priming coat prepartion of surfaces ,etc including Necessary Scaffolding up to desired height complete in all respects and as per the directions of Engineer incharge
Providing and Fixing Saint-Gobain CertainTeed roofing Shingles, Shadow Ridge and Swift Starter – Landmark Pro Series (Colour as decided by Client /Architect). The shingle should conform to the following standards: - 1.Construction– 3 piece laminated fiber glass construction 2.ASTM D3081 – Asphalt shingles combined with Glass felt and surfaced with Mineral granules. 3.ASTM E108 – Class A fire resistance. 4. ASTM C 3161 – For 110 Mph wind resistance 6.UL (Under Writers Lab) certification for all the above. (STP Tarplast or equivalent) to be applied with brush over the Nail lines for Stronger bond between the shingles. (Additional nails & self-adhesive needs to be used for installation against gravity)
Dismantling of C.G.I./Coloured sheet roofing and stacking of serviceable material and disposal of unserviceable material within a lead as directed by the in-charge engineer etc including necessary scaffolding up to desired height complete in all respects and as per the directions of Engineer incharge.
Providing and fixing Track deck H.I. Rib profiled approved make Sheets 1000 to 1020 mm cover width 28-35 mm high crests at 250 to 255 mm T.C.T(total coated thickness) high tensile S.M.P Galvalume steel. The sheets shall have wide panes with 3 no stiffing ribs, effective water shedding and special male/female ends with full return legs on side Lapps for purlins support and anti-capillary flute inside Lapp. The sheets shall have a hot dip metallic coated of zinc and aluminum (150 gms /sm) zinc/aluminum coating mass total on both sides AZ-150 as IS -1397 ,550 MPA yield stress. Providing silicon modified polyester coating of approved colour of total thickness of 35 micron comprising 20 micron exterior coat of S.M.P over 5 micron polyester back coat over 5 micron primer coats on both surfaces including side and end Lapp and using 8mm Galvalume hex self-drilling fastener on each crest of sheet for connection with purlins and seam bolts at 300mm centers on all sides and end Lapps etc(.measured for unit of laid area) etc including necessary scaffolding up to desired height complete in all respects and as per the directions of Engineer incharge
Providing and fixing of 0. 50 mm total thickness S.M.P. coated Galvalume steel of similar material for ridges, capping pieces at apex of sky lights/hips, valleys etc. (of similar material as in item no 4 above) including notching, turning down of edges of capping between ribs etc .complete(500 mm to 1000 mm) including necessary scaffolding up to desired height complete in all respects and as per the directions of Engineer incharge
Providing and fixing Plain G.I Sheets in Gutters,Valleys etc fixed with polymer coated Nails , and G.I limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (0.63 mm Thick) (300 mmx450 mm size)
POLYCARBONATE Triple-Clear (PC3)- should have a clear tint appearance, provides excellent thermal insulation, high flexibility and virtually unbreakable. With its anti-fog coating, this PCSS which shall prevent condensation build-up (falling droplets) and the sheet structure provides extra strength under wind and snow loads. Triple-Clear sheets should be min in 12mm thick sheets.The coefficient of linear expansion of polycarbonate material should be 6.7x10-5m/m•°C. As a consequence careful allowance must be made for the thermal expansion of Polygal polycarbonate multi wall sheets, both longitudinally and laterally and it is necessary to allow ~1/4” per 4’ length or width for thermal expansion. Min Thickness (mm) 12 R-Factor- BTU (h/ft2/F) 2.000Loss of “impact strength in the event of hail” shall be determined by an impact test according to ASTM D 5628-95 geometry FE (tap diameter 20mm). (In this test, failure is determined when the upper wall of the sheet is penetrated by the tap. The sheet does not reach the required standard if the Mean Failure Energy obtained in the test is less than 0.831 Joules. This energy is equal to the energy generated by a 20 mm (~3/4”) diameter ice ball at a speed of 21 m/s.).
A) Providing and fixing Aluminum work for doors, windows, ventilators,Partitions etc with extruded builtup tubular sections / appropriate Z sections and other sections of approved make conforming to IS 733 and IS 1285, fixed with chemical of approved brand and manufacture including filling up of gaps at junctions, at tops, bottoms and sides with required PVC / neoprene felt etc.all complete to make the structure air tight /water proof complete as per directions of Engineer I/C including P/F hinges / Pivots and making provision for fixing of fittings wherever required including cost of PVC / neoprene gasket required ( including all necessay fittings as required ). Powder Coated aluminum ( minimum thickness of Powder coated 50 microns) Partitions (Hollow tublar section 50x40 mm with 1.60 mm thick .including necessary scaffolding up to desired height complete in all respects and as per the directions of Engineer incharge
(Labour Only) Aluminium Material Available at Site including all necessary fittings/neuropian gaskets etc complete.
Providing and fixing of 8 mm thick aluminium profile Insulation under roof with Polyurethane foam (density 40 Kg/mc) ,Covering of Galvanised white steel. Complte as per specifications and as per directions of consultant,
Dismantling of existing wooden doors /commentry boxes including stacking of serviceable material and disposal of unserviceable material within a lead as directed by the in-charge engineer etc Complete Job
Providing and fixing of Deodar wood flooring 50 mm thick well seasoned made up of 75 mm x50 mm planks not less than 3.00 metre length to be fixed with screws /nails /adhesive complete as per specifications and directions of Consultant/Engineer Incharge.
Providing and fixing ist quality ceramic glazed tiles in floors etc 300 x 300 mm of 10 mm minimum thickness confirming to IS: 13753 of approved make like NITCO, Orient, Somany, Kajaria or equivalent make of specified shades except Burgundy bottle green black of any size as approved by consultant over 12mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3Kgs per Sq.m including pointing in white cement mixed with pigment of matching shade complete
Removal of existing top layer of passage in basement , cleaning and repairing with Urp 301 in floors and walls , applying two coats of Dr. fixit or equallient fast flex 113. after a gap of 5days. Tiling work to be done with Urp 301 chemical mixed with concrete complte as per the directions of site incharge
M/S MIR HILAL CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .