Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | -23.40% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.6 L+₹57,817.72 (9.67%)Admitted-Fee/PreQual/Technical/Finance | -15.99% | ₹6.6 L+₹57,817.72 (9.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.6 L+₹65,620.39 (11.0%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹6.6 L+₹65,620.39 (11.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
17 Jul 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
IMPROVEMENTS TO THE TRAFFIC ISLAND WITH GREENERY ARRANGEMENTS AT MTH ROAD IN DIV 95 UNIT 21 ZONE 08
2026_CoC_683769_1
Z.O.VIII.C.NO.E1/5189/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,800
17 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of Vertical Bored cast in situ RCC pi...eparately ) Grade of Concrete: M25 300 mm dia pile | 36 | R/M | 1,564.54 | ₹56,323.44 |
| 2 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 7 | CUM | 368.55 | ₹2,579.85 |
| 3 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 2 | CUM | 391.95 | ₹783.9 |
| 4 | Cement Concrete 1:3:6 (One Cement, Three crushed s...artmental officers. - Mixing by mechanical means | 2 | CUM | 6,709.81 | ₹13,419.62 |
| 5 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 568 | KGS | 96.53 | ₹54,829.04 |
| 6 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials). | 4 | CUM | 8,197.92 | ₹32,791.68 |
| 7 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 32 | SQM | 1,178.29 | ₹37,705.28 |
| 8 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 10 | SQM | 669.67 | ₹6,696.7 |
| 9 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:5 | 13 | CUM | 7,935.89 | ₹1,03,166.57 |
| 10 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 110 | SQM | 317.59 | ₹34,934.9 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_821947.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .