Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹3.0 L Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room | Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room | ₹3.0 L | L1 |
| 2 | L2₹3.0 L+₹104.11 (0.03%) Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room | Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room | ₹3.0 L+₹104.11 (0.03%) | L2 |
| 3 | L3₹3.8 L+₹76,309.26 (25.1%) Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room | Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room | ₹3.8 L+₹76,309.26 (25.1%) | L3 |
| Sl No | Description | Qty | Unit | Santosh Prasad Thakur L1 | AMRIT VASUDEO L3 | ANKIT KUMAR L2 |
|---|---|---|---|---|---|---|
| 1 | Civil work | - | - | -41.51 ₹3,04,456.24 Lowest | -26.85 ₹3,80,765.5 | -41.49 ₹3,04,560.35 |
Tender Value
₹5.2 L
EMD Value
₹10,411
Closing Date
6 Jul 2024, 3:00 pmClosed
EE&SM( C)-1
Ramcharan Meena
O/o CE cum ED, Bodhgaya Project Zone-I ,CPWD Bodhgaya
Construction of Permanent campus of IIM Bodhgaya Phase I SH Providing and fixing water taps shower in Type B flats common toilet in staff residence PWD toilet at stilt floor of all residential building and professor residence each flats servant room
80134
03/NIT/EE&SM(C)-I/BGPZ/2024-25
OPEN
Civil Works - Buildings
NCB
15 days
Gaya, Bihar
5 documents required · 5 mandatory
₹10,411
Not Applicable
6 Jul 2024
29 Jun 2024
6 Jul 2024
6 Jul 2024
6 Jul 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT03FREEVIEWEE.pdf
document • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .