| 1 | L1₹77.3 LAccepted-AOC 86 7 CONVENT ROAD MITTAPUDUR SALEM DISTRICT TAMIL NADU 636016 | MITTAPUDUR | SALEM | TAMIL NADU | 636016 | ₹77.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹79.0 LRejected-Finance NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | ₹79.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹84.7 LRejected-Finance M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | ₹84.7 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical documents are NOT in order |
| Sl No | Description | Qty | Unit | R UVARAJAN L3 | V K L CONSTRUCTIONS L1 | N VEERAMANI ( LAKSHMI ENGINEERING SERVICES ) L2 |
|---|---|---|---|---|---|---|
| 1.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50m and lift up to 1.5m Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 194.4 | SQM | 40 ₹7,776 | 1,000 ₹1.9 L | 45 ₹8,748 |
| 2.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 66.89 | CUM | 286 ₹19,130.54 | 6,000 ₹4.0 L | 300 ₹20,067 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 20.03 | CUM | 2,343 ₹46,930.29 | 10,000 ₹2.0 L | 2,400 ₹48,072 |
| 4.00 | Diluting and injecting chemical emulsion for POSTCONSTRUCTIONAL anti-termite treatment. Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300mm apart including drilling 12 mmdiameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: 2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with1% concentration (CPWD CODE NO2.35.3) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. | 64.8 | SQM | 343 ₹22,226.40 | 7,000 ₹4.5 L | 500 ₹32,400 |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four Sand and Eight hard broken stone aggregate) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 20.03 | CUM | 7,518 ₹1.5 L | 5,000 ₹1.0 L | 7,750 ₹1.6 L |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 70.94 | SQM | 450 ₹31,923 | 1,000 ₹70,940 | 450 ₹31,923 |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level TMT Bars ; Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 1,429 | KG | 123 ₹1.8 L | 100 ₹1.4 L | 123 ₹1.8 L |
| 8.00 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and a half sand and Three hard broken stone aggregate) using 20 mm gauge hard broken granite stone aggreagate for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper & Blocks laid over it without claiming extra, etc., complete complying with standard specification. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 14.29 | CUM | 10,375 ₹1.5 L | 1,500 ₹21,435 | 10,500 ₹1.5 L |
| 9.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 Cement mortar 1:6 (1 cement : 6 coarse sand) Coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 14.66 | CUM | 8,464 ₹1.2 L | 7,000 ₹1.0 L | 8,250 ₹1.2 L |
| 10.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 13.67 | CUM | 224 ₹3,062.08 | 800 ₹10,936 | 200 ₹2,734 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
26 Feb 2026, 11:00 amClosed
SA ASI Chennai
o/o Superintending Archaeologist, ASI, chennai-9
UPoHA and N.E.C to Providing of Public Amenities Toilet block at Fort and Temples on the Hill Chinnakavandanur for the year 2025-26 Retender-1st Call
2026_ASI_898519_1
T-15014/12/2026-Chennai Circle
Open Tender
Civil Works - Buildings
180 days
As per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.9 L
Yes
10 Mar 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
26 Feb 2026
13 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Archaeological Survey of India, Chennai Circle, Fort St.George,Chennai-9
Name of Work: EXECUTION OF WORKS AT UPoHA & N.E.C to Providing of Public Amenities (Toilet block) at Fort and Temples on the Hill Chinnakavandanur for the year 2025-26 (Retender First call)
Contract No: 044-25670397 (Rates should be quoted inclusive of GST )
Name of the Bidder/ Bidding Firm / Company :
Item No Description and specification of items of work to be executed Item Code / Make Specification / Quantities to be executed Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency UNIT RATE (Including Taxes) In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50m and lift up to 1.5m Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item1 SQM Excess(+) Full Conversion INR
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item2 CUM Excess(+) Full Conversion INR
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item3 CUM Excess(+) Full Conversion INR
Diluting and injecting chemical emulsion for POSTCONSTRUCTIONAL anti-termite treatment. Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300mm apart including drilling 12 mmdiameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: 2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with1% concentration (CPWD CODE NO2.35.3) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item4 SQM Excess(+) Full Conversion INR
Cement Concrete 1:4:8 (One Cement, Four Sand and Eight hard broken stone aggregate) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item5 CUM Excess(+) Full Conversion INR
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item6 SQM Excess(+) Full Conversion INR
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level TMT Bars ; Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item7 KG Excess(+) Full Conversion INR
Reinforced Cement Concrete 1:1½:3 (One Cement, One and a half sand and Three hard broken stone aggregate) using 20 mm gauge hard broken granite stone aggreagate for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper & Blocks laid over it without claiming extra, etc., complete complying with standard specification. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item8 CUM Excess(+) Full Conversion INR
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 Cement mortar 1:6 (1 cement : 6 coarse sand) Coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item9 CUM Excess(+) Full Conversion INR
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item10 CUM Excess(+) Full Conversion INR
Centering and shuttering including strutting, propping etc. and removal of form work for Columns, piers, abutments, pillars, posts and struts Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item11 SQM Excess(+) Full Conversion INR
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level TMT Bars ; Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item12 KG Excess(+) Full Conversion INR
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item13 CUM Excess(+) Full Conversion INR
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item14 CUM Excess(+) Full Conversion INR
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item15 CUM Excess(+) Full Conversion INR
Cement concrete flooring 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item16 CUM Excess(+) Full Conversion INR
Plastering with cement mortar 1:5 (1 cement : 5 coarse sand) on brick/stone masonry or concrete surfaces, including surface preparation, raking of joints, cleaning and wetting, applying plaster to the specified thickness, finishing smooth and even, curing complete, including cost of materials, labour, scaffolding and all incidental charges, and directions of the Engineer-in-Charge. item17 SQM Excess(+) Full Conversion INR
Special ceiling plastering and finishing all the RCC exposed surfaces such as RCC Slabs sunshade, canopy, staircase steps, landing slab etc., with cement mortar 1:3 [One cement and three M-sand] 10mm thick including hacking the surface and providing cement mortar noising beading wherever necessary using the same mix as directed by the departmental officers etc., complete complying with standard specifications.Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item18 SQM Excess(+) Full Conversion INR
Painting two coats of newly plastered ceiling surface with White washing with lime to give an even shade Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item19 SQM Excess(+) Full Conversion INR
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. Finishing walls with textured exterior paint of required shade. Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item20 SQM Excess(+) Full Conversion INR
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. item21 SQM Excess(+) Full Conversion INR
Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item22 SQM Excess(+) Full Conversion INR
Providing and laying integral cement based waterproofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: item23 SQM Excess(+) Full Conversion INR
Providing and laying pressed clay tiles (as per approved pattern 20 mm nominal thickness of approved size) on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1cement : 4 coarse sand) and finished neat complete. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item24 SQM Excess(+) Full Conversion INR
Providing and laying matt finished vitrified tile of size 300x300x9.8 mm having with water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20 mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-in-Charge. item25 SQM Excess(+) Full Conversion INR
Provision for Paving the floor with best approved quality flamed finiah Granite Stone Slabs of size assorted sizes in irregular pattern, in linear as well as curvilinear portions of the building all complete as per the architetural drawings with 18mm thick stone slab over 20mm average thick base of cement mortar 1:4 (1cement : 4 coarse sand) laid and joined with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc.complete as specified and as directed by the engineer -in-charge. The granite stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item26 SQM Excess(+) Full Conversion INR
Provision for plumbing work with necessary fittings, including supply, installation, testing and commissioning of complete plumbing system, inclusive of cost of materials, labour charges, conveyance, tools & plants, scaffolding, cutting and making good, testing and all incidental charges, complete, as per specifications and directions of the Engineer-in-Charge.Supplying and fixing in position White / Colour Special Delux Model Glazed Cascade Type Parryware / Hindware / Equivalent Wall Mounted European Water Closet of best quality and approved make with 100mm “P” or “S” trap connecting with CI pipe of 100mm dia / PVC pipe of 110mm dia, double flapped rigid PVC black seat and seat cover with CP brass hinges including cost of white cement, cement for packing, spun yarn, teak wood plugs, brass screws, etc., including supplying and fixing 10 litres capacity PVC / 12.5 litres capacity porcelin low level flushing tank with a pair of CI brackets, etc., complete with all fittings, such as, 15mm brass ball valve with polythene float with brass handle, union coupling connected by means of 40mm white PVC flush hand using indian adopter joint including all internal fittings, such as, 15mm bras connections,15mm GM wheel valve, 15mm brass nipple (2 Nos.), 15mm nylon connection, TW plugs, screws and also giving necessary connection to the PVC pipe and painting the CI brackets with 2 coats of approved paint over one coat of red oxide primer, dismantling the masonry and re-doing the dismantled masonry to original condition, etc., complete complying with standard specifications. (The EWC and flushing tank with all accessories should be got approved by the Executive Engineer before use on works) with 10 litres capacity flushing tank with all internal dual flush fittings with normal seat cover Wall Fitting Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item27 EACH Excess(+) Full Conversion INR
Supplying and fixing in position 15mm dia brass CP screw down tap / Pillar tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. (Taps should be got approved by the Executive Engineer before use on the works) item27 SQM Excess(+) Full Conversion INR
Supplying and fixing in position best quality PVC soil / waste pipes of various dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item27 EACH Excess(+) Full Conversion INR
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge item27 RMT Excess(+) Full Conversion INR
Supplying and erecting in position of 500 liters capacity Industrial Model Reverse Osmosis Water-cum- Purifier to deliver Potable Water with World Health Organisation (WHO) Standards with following accessories.(a) MS Skid - 1 No. (b) Media 11054 No. Vessel with 20 nb Multiport Valve (with Media Pubble and Fine Sand and Activated Carbon Filling) set (c) Feed Pump 0.50 HP 1 No.(d) Vertical Pump 2-9, 2.00 HP / Single Phase – 1 No. (e) Membrane 40 x 40 filmtech (or) equilaents / Osmonic (USA) - 1 No. and Membrane Pressure Vessel 40 x 40 1 No. & Pressure Gauge - 2 Nos. (f) Flow Meter - 1 No. 20” Filter with Housing - 1 No., Low Pressure Switch- 1 No., Level Switch - 1 No. & Necessary CPVC Pipes and Fittings. The system shall be provide with Two Panel Control System with necessary Stainless Valves and Fittings and Float Control etc. The rate should be inclusive of all civil works ,wherever necessary to install the System in position and intact. Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item28 EACH Excess(+) Full Conversion INR
Wiring with 2x1.5sq.mm.PVC insulated unsheathed FRL SSC copper conducto rof 1100V grade insuitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires with TW switch box and 5AFT switch inflush with wall with 3mm thick hylum sheet cover for making good of the concealed portion with suitable colour for PVC concealed light point / fan point (for electronic regulator). Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 RMT Excess(+) Full Conversion INR
Wiring with 2x1.5sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories, in flush with wall, with 150mm x 100mm x 113mm Metal switch box with suitable top cover for 5 A 3 pin non inter locking CS Modular Plug with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point. Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item28 RMT Excess(+) Full Conversion INR
Supply and run of 2 of 1.5 sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V Grade in rigid pipe concealed in wall and ceiling with continuous earth wire connection of 14SWG TC wire and making good of the concealed portion with suitable colour - SD-55 Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item28 SQM Excess(+) Full Conversion INR
Wiring with 2x4 sq.mm. PVC insulated SC unsheathed FRLS copper conductor cable of 1100V grade insuitable pipe concelaed with PVC accessories with 150mm x100mm x113mm TW switch box for 15A 3pin non inter locking wall socket with 15A flush type switch with painting of suitable colour with continuous earth wire connection of 4 sq.mm copper wire for open PVC power plug point -Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply and fixing of fancy glass shade and 11W CFL for BH point. (SD-80) item28 EACH Excess(+) Full Conversion INR
Supply and fixing of single box type 4'36 W flu fitting complete with electronic ballast with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting. (SD- 87) As per DSR (E&M) PART-1 2025 Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 SQM Excess(+) Full Conversion INR
Supply and fixing of 1 x 45w 4U Retro CFL B22 type street light fitting complete with 19mm dia GI pipe (class “B”) on the existing post / wall with PVC unsheathed copper leads MS clamps and aluminium painting with CFL (CG / Philips or Equivalent) SD94 (As per DSR (E & M) PART 1 Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply and fixing of 4' 40 W Twin Mirror optic suspension type fitting (Philips / Crompton / Wipro) complete with louvers cover complete with copper choke and condensor with conduit pipe suspension, with PVC unsheathed Copper leads from the terminals to the fittings with flu. tubes (SD-96) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply & Fixing of AC / DC 76mm Buzzer /call bell suitable for 230 Volts 50 c/s single phase AC supply on suitable TW Board with push switch. (SD-105) (As per DSR (E & M) PART 1 2025 Pg.No.92 Code.No.1.38) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply and fixing of 3 Nos. 5Amps (3 Pin and 2 Pin) combined flush type wall socket with control switches concealed in suitable TW Box covered with Hylem sheet in flush with wall with earth connection (For Computer Plug Socket) (SD-139) (As per DSR (E & M) PART 1 2025 Pg.No.88 Code.No.1.31) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply and fixing of 20Amps DP Plug and Socket in sheet enclosure with 32A DP MCB in flush with wall with earth connection (For AC Plug) [Legrand (MDS) / Hager (L&T) make] (SD-140) (As per DSR (E & M) PART 1 2025 Pg.No.137 Code.No.2.20) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item28 EACH Excess(+) Full Conversion INR
Supply and fixing of 63A TPN MC switch with suitable angle iron frame work with MS cable entry boxes with earth connection only.Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure Distribution board 1No 32 Amps DB MCB as incoming and 6 Nos 6 Amps to 32 Amps SPMCB outgoing in flush with wall and making good of the concealed portion with earth connection only. The MCB DB and MCB's should be with ISI mark (Like Standard make). SD-166 Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure Distribution board 1No 32 Amps DB MCB as incoming and 6 Nos 6 Amps to 32 Amps SPMCB outgoing in flush with wall and making good of the concealed portion with earth connection only. The MCB DB and MCB's should be with ISI mark (Like Standard make). (SD-167) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item28 EACH Excess(+) Full Conversion INR
Supply and fixing of Horizontal type 4 way triple pole neutral MCB distribution board in sheet steel enclosure with 40A 4 pole MCB isolater as incoming and 12 Nos. 6 A to 32 A SP MCB as outgoing in flush with wall and making good of the concealed portion with earth connection. The MCBDB and MCB's should be with the ISI mark (like standard make) (SD-179) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supply and laying of 31/2 X 50 sq.mm PVC armoured LTUG cable in a trench to be excavated at a depth of 0.75 metre putting 0.15 mt. Layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good. SD206 Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item28 RMT Excess(+) Full Conversion INR
Supply and clamping of 31/2x50 mm PVC ctvg ARMOURED CABLE ON SUITABLE on post or on wall with MS Clamps (SD - 224) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge. item28 RMT Excess(+) Full Conversion INR
Supply and fixing of 2x36w CFL type street light fitting with complete with 32mm dia G.I. pipe class 'B with 1 No 32mm G.I. Bend complete on the existing post / well with 16A aerial fuse unit on MS plate with PVC unsheathed copper leads, MS clamps and aluminium paiting with 2 Nos 36w CFL. (Make CG SCE 13236EB / equivalent)" Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Earthing as per the ISI specification with an earth electrode of 2.1mt class 'B' GI pipe of dia not less than 40mm, with copper earth plate of size 125mm x 50mm x 6mm, with necessary funneling arrangements with necessary masonry work and with 38mm RCC cover slab for the brick masonry SD-233 ) Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item28 EACH Excess(+) Full Conversion INR
Supplying doors and windows Providing and fixing UPVC (Unplasticized Polyvinyl Chloride) casement type openable windows of size 0.60 m × 0.90 m (0.54 Sqm each), made from multi-chambered UPVC profiles having minimum 2 mm wall thickness, with outer frame size 60 mm × 58 mm and shutter profiles reinforced with 1 mm thick GI reinforcement (minimum 125 GSM zinc coating), fully corrosion-free, complete. The windows shall be provided with EPDM rubber gaskets (black colour) all around the frame and shutter, Espag multi-point locking system with handle operation, key-lockable security hinges and strong locking arrangement to reduce noise and energy loss. Corners and joints shall be fusion welded, cleaned and finished properly. Glazing shall be 4 mm thick radiation-free pin-headed plain or brown coloured glass, securely fixed to the shutter and watertight even during heavy rains and storm conditions. The window shall be fixed to the wall opening with proper alignment, 100% packing, screws and silicone sealant all around the frame, ensuring smooth operation of the sash. All materials shall be of approved make and the window shall be got approved by the Engineer in charge before use on work, complete in all respects including cost of materials, labour, fittings, conveyance and installation, Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item29 SQM Excess(+) Full Conversion INR
Providing and fixing UPVC (Unplasticized Polyvinyl Chloride) louvered ventilators of approved make and quality, manufactured from multi-chambered UPVC profiles having minimum wall thickness of 2 mm, with outer frame size 60 mm × 58 mm and shutter profile size 60 mm × 78 mm, both profiles reinforced with 1 mm thick GI reinforcement with minimum 125 GSM zinc coating, fully corrosion-free. The ventilators shall be provided with EPDM rubber gaskets (black colour) all around the frame and shutter edges. The corners and joints of the profiles shall be fusion welded, properly cleaned and finished. The louvers shall be fitted with 4 mm thick radiation-free pin-headed glass securely fixed in position. The ventilator shall be fixed to the wall opening with proper alignment, 100% packing, screws and silicone sealant all around the frame to ensure a firm and watertight installation. All materials shall be of approved make and the ventilator shall be got approved by the Executive Engineer before use on work, complete in all respects including cost of materials, labour, fittings, conveyance and installation, item30 SQM Excess(+) Full Conversion INR
Providing and fixing 35 mm thick factory-made pre-laminated ABS (Acrylonitrile Butadiene Styrene) door shutters of approved make and design, moulded in different patterns, complete with all fittings and accessories. The door shutter shall consist of an all-round frame made of waterproof solid foam PVC bars of size 20 mm × 32 mm, reinforced with 32 mm × 32 mm LVL (Laminated Veneer Lumber) vertical members (2 Nos.). The core shall be of 32 mm thick high-density craft paper honeycomb board, sandwiched on both sides with 1.5 mm thick pre-laminated ABS sheets, and finished with 0.45 mm thick PVC edge banding on the vertical sides. The shutter shall be provided with steel-coated butterfly hinges (3 Nos. per shutter) and ISI-marked stainless steel round lock, complete. The rate shall include cost of materials, labour, fittings, conveyance, installation and finishing, complete in all respects and complying with standard specifications. The door shutter and frame shall be got approved by the Engineer incharge before use on work Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item31 SQM Excess(+) Full Conversion INR
Providing and fixing UPVC / solid PVC door shutters or partition walls with jambs, complete with all fittings and accessories, as per approved specifications and directions of the Engineer-in-Charge. The shutter and frame shall be fabricated using 19 gauge, 19 mm MS square tubes for styles and outer frames, and 15 mm MS square tubes for top rail, lock rail and bottom rail. The steel members shall be fully covered with 5 mm thick solid PVC sheets. The shutter panelling shall be made of 5 mm thick solid PVC sheets, rigidly fixed in position. The overall size of styles shall be 50 mm × 30 mm, the overall size of top rail, lock rail and bottom rail shall be 75 mm × 30 mm, and the overall size of frames shall be 50 mm × 45 mm, provided with suitable rebate for housing the shutter. The work shall include supplying and fixing of all necessary furniture and fittings, complete. All materials shall be of approved make and quality, and the shutter, partition and frame shall be got approved by the Engineer in charge before use on work, complete in all respects including cost of materials, labour, fittings, conveyance and installation, item32 SQM Excess(+) Full Conversion INR
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 200 mm nominal size dia (unplasticized PVC medium well screen (RMS) pipes ) Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item33 RMT Excess(+) Full Conversion INR
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge item33 CUM Excess(+) Full Conversion INR
Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item33 EACH Excess(+) Full Conversion INR
Supplying Assembling lowering and fixing the Submersible Motor 2HP Texmo with starter in vertical position (Local Market) Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item33 EACH Excess(+) Full Conversion INR
Supplying and fixing of 1000 litres capacity PVC water tank with IS specification IS 10701/96 the tank is meant for outdoor (or)indoor use complete with removable hinged top locking arrangement and to make provision to fix water supply pipe lines, necessary man hole with cover and etc. (The water tank should be got approved by the engineer incharge before use on work) Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item33 LTR Excess(+) Full Conversion INR
Provision for Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared and Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same for laying the Lime concrete purpose. item34 SQM Excess(+) Full Conversion INR
Laying lime Concrete for base of stone flooring in pure lime 1:2 (1 part of Lime: 2 Part of Brick Aggregate) using 20 mm size brick aggregate including ramming, consolidating and levelling etc. with suitable color oxides to the match the stone from the entrance area to step area by manually head load only as per the standard specification and as per the direction of the site incharge Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item35 CUM Excess(+) Full Conversion INR
Laying rough stone pitching using new stone using irregular pattern to camouflage with the surronding environs using stone of size 0.30 to 0.60 m length, 0.30 to 0.60m width, 0.10 m thickness fixing in lime mortar 1:2(1 Part of Lime: 2 Part of Brick Aggregate) over the base concrete and Pointing the stone joints with lime mortar 1:1.5 (1 Part of Lime: 1.5 Part of Dry River Sand), curing and a lead of 250m from the main entrance area as per the direction of the site incharge Including cost of all materials, conveyance, loading and unloading labour hire charges fuel, tools and plant all applicable taxes and incidental charges complete as directed by the engineer in charge item36 SQM Excess(+) Full Conversion INR
Excavation work by mechanical means (Hydraulic excavator)/ manual means including cost of all materials and hirecharges of tools and plants etc complete.as directed by the engineer in charge item37 CUM Excess(+) Full Conversion INR
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. item37 CUM Excess(+) Full Conversion INR
Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone aggregate) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification including cost of all labour charges tools and incidental charges etc complete as directed by the Engineer in charge. item37 CUM Excess(+) Full Conversion INR
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 including cost of all labour charges tools and incidental charges etc complete as directed by the Engineer in charge. item37 CUM Excess(+) Full Conversion INR
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns including cost of all labour charges tools and incidental charges etc complete as directed by the Engineer in charge. item37 SQM Excess(+) Full Conversion INR
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).Including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item37 CUM Excess(+) Full Conversion INR
supplying and providing Thermo-Mechanically Treated bars of grade Fe-500D or more including cost of all labour charges tools and incidental charges etc complete as directed by the Engineer in charge. item37 KG Excess(+) Full Conversion INR
Plastering with cement mortar 1:3 (1 cement : 3 coarse sand) on brick/stone masonry or concrete surfaces, including surface preparation, raking of joints, cleaning and wetting, applying plaster to the specified thickness, finishing smooth and even, curing complete, including cost of materials, labour, scaffolding and all incidental charges, and directions of the Engineer-in-Charge. item37 SQM Excess(+) Full Conversion INR
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. including cost of all labour charges tools and incidental charges etc complete as directed by the Engineer in charge. item37 CUM Excess(+) Full Conversion INR
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer in-charge. item37 CUM Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tenderdocumentchinnakavandanurcompressed.pdf
Tender Documents • 21.80 MB
BOQ_944434.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid