Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance 0 MOHALLA SADAK WALA 0 BAHSUMA MEERUT UTTAR PRADESH 250404 | MEERUT | UTTAR PRADESH | 250404 | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹28.1 L (7.04%)Admitted-Finance | ₹4.3 Cr+₹28.1 L (7.04%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹29.8 L (7.46%)Admitted-Finance F 8 35 RAMPUR GARDEN BAREILLY UTTAR PRADESH 243005 | BAREILLY | BAREILLY | UTTAR PRADESH | 243005 | ₹4.3 Cr+₹29.8 L (7.46%) | L3 | Admitted-Finance |
| 4 | L4₹4.4 Cr+₹37.0 L (9.25%)Admitted-Finance | ₹4.4 Cr+₹37.0 L (9.25%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Required Documents not attached. |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L2 | mishrilal associates pvt.ltd L3 | KHAN ENTERPRISES L4 | B L ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 0.00Shifting of Overhead 33 KV 11 KV and LT Line to Underground 3x300 sq mm XLPE, 3x185 sq mm XLPE and LT Lines from IIIT Chauraha to Jagriti Chauraha, Prayagraj including loading and unloading of material under Mahakumbh Mela 2024 | |||||||
| 1.00 | Cartage of 11 Mtr long STP from Store to dump store/work Site Including loading and unloading | 96 | No | 799 ₹76,704 Lowest | 807 ₹77,472 | 815 ₹78,240 | 800 ₹76,800 |
| 2.00 | Cartage of LT PVC insulated cable of size 1X400/ 3.5cx400/240/150 from Store to dump store/work Site Including loanding and unloading | 12,400 | Mtr | 9 ₹1,11,600 Lowest | 9 ₹1,11,600 Lowest | 9 ₹1,11,600 Lowest | 25 ₹3,10,000 |
| 3.00 | Cartage of 33 KV 3x 300 sq mm and 11 KV 3x185 sq mm XPLE cable from Store to dump store/work Site Including loading and unloading.( per drum lengh-500 mtr apox.) | 12,870 | Mtr | 29 ₹3,73,230 | 29 ₹3,73,230 | 30 ₹3,86,100 | 25 ₹3,21,750 Lowest |
| 4.00 | Cartage of 250/100 kva Transformer from Store to dump store/work Site Including loanding and unloading | 7 | No | 6,939 ₹48,573 | 7,008 ₹49,056 | 7,000 ₹49,000 | 5,000 ₹35,000 Lowest |
| 5.00 | Erection, grouting, plinthing & earthing of sub station type double pole struucture for 250 KVA /100 KVA T/F at 11m long STP with mounting of all accessories like 11 kv fuse set, TPMO, top channel, Dropper Channel , Sub Station Base, Bracing angle Channels, Danger board, barbed wire, number plate, nuts & Bolt with clamps etc. grouting of pole in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth done properly (All required material for double pole structure & all grouting material except S.T.Pole provided by contractor ) as per RESSPO norms. | 7 | No | 41,589 ₹2,91,123 | 42,005 ₹2,94,035 | 42,500 ₹2,97,500 | 10,000 ₹70,000 Lowest |
| 6.00 | Mounting of 250 KVA T/F on D/P along with HT/LT connection with support of D.D. wire 70 sq mm, 400sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 250 KVA T/F, nut and bolts atc.(All materials will be provided by the conctractor to Complete the work in all respect execpt T/F.) | 4 | No | 15,849 ₹63,396 | 16,007 ₹64,028 | 16,200 ₹64,800 | 10,000 ₹40,000 Lowest |
| 7.00 | Mounting of 100 KVA T/F on D/P along with HT/LT connection with support of D.D. wire 70 sq mm, 150sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 100 KVA T/F, nut and bolts atc.(All materials will be provided by the conctractor to Complete the work in all respect execpt T/F.) | 3 | No | 9,909 ₹29,727 Lowest | 10,008 ₹30,024 | 10,000 ₹30,000 | 10,000 ₹30,000 |
| 8.00 | Earthing of transformer body and neutral sepretly by lowering of GI pipe of size 1.50” dia 40’ deep, or special chemical earthing with 50 mm dia 3 meter long copper pipe connecting with GI Strip of size 50x6 mm with clamp. (All materials will be arranged by the conctractor) | 7 | Job | 12,870 ₹90,090 | 12,999 ₹90,993 | 13,200 ₹92,400 | 10,000 ₹70,000 Lowest |
| 9.00 | Installation of L.T. cubical Box (CRC SHEET)( 400 amp, 3 phase 4 wire, Aluminium busbar with indicator, and fusing arrangement systme) on double pole ,with the help of channel ,clamp & nut bolt etc. (All materials ie LT Cubical box Clamps, Channels etc will be arranged by the conctractor) as per sample provided by department. | 4 | No | 25,249 ₹1,00,996 | 25,501 ₹1,02,004 | 26,000 ₹1,04,000 | 10,000 ₹40,000 Lowest |
Tender Value
₹4.3 Cr
EMD Value
₹8.6 L
Closing Date
17 Oct 2023, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Temp. Maha Kumbh Mela 2024-25, Electricity Circle, Prayagraj
Refer to Tender Description
2023_PVVNV_849163_1
47/TMKM/EC/2023-24
Open Tender
Electrical Works
Lump-sum
180 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
Account # 50200079575664
₹8.6 L
Yes
5 Mar 2024
11 Oct 2023
17 Oct 2023
11 Oct 2023
17 Oct 2023
11 Oct 2023
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .