| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.5 LAccepted-AOC VILL BENGTOL KUMGURI P O BENGTOL P S RUNIKHATA CHIRANG BTR ASSAM 783394 | BENGTOL | CHIRANG | ASSAM | 783394 | L1 | Accepted-AOC CONTRACT AWARDED | |
| 2 | Rejected-Technical | - | Rejected-Technical Not Admitted | |
| 3 | Rejected-Technical WARD NO 13 GURUNANAK NAGAR BONGAIGAON | DHUBRI | ASSAM | 783371 | - | Rejected-Technical Not Admitted |
Tender Value
₹98.4 L
EMD Value
₹2.0 L
Closing Date
12 Jan 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director, Soil Conservation Deptt.
Directorate of Soil Conservation Deptt., Assam, Ghy-05
LAND DEVELOPMENT AND SOIL EROSION CONTROL PROJECT UNDER SIDLI DEV. BLOCK UNDER RIDF-XXV
2021_SCD_19934_3
E-TEN-1/Pt./2020-21/4347 Date-02.01.2021
Open Tender
Civil Works
Works
1095 days
Chirang
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹2.0 L
Yes
17 Feb 2021
4 Jan 2021
12 Jan 2021
4 Jan 2021
12 Jan 2021
5 Jan 2021
365 days
Amount
Dologaon GCP at Dologaon Village (Part-I)
(A) Earth works in excavation for foundation trenchesincluding filling up trenches and removal of surplusspoil after completion of foundation work removing etc. watering up to water level.
(B) Below foundation.
Plan cement work foundation with proportion 1:3:6etc. complete as per drawing and technical specification.
R.C.C works in prop (1:2:4) with river graded gravel with size 12 mm to 25 mm size free from dirt excluding cost ofreinforcement (reinforcement with be made and payment separately)and including cost of shuttering cluttering curing ramming etc. complete asdirected.
Supply fitting and placing TMTCRS (Fc.500) bar reinforcement in the structure complete as per drawing and technical specification including cutting and binding with ring etc. @ 60 kg/m³
Plastering with cement mortar in prop. 1:2 on all wall and apron including clearing the surfaces and curing eye complete as directed.
A) E/W in filling in front head wall, extension Head Wall by the side of side wall and wing wall junction of the structure with approved materials obtained from borrow pits with all leadand lifts
B) Guide Band
Furnishing and laying of the live sods of perennial turf forming grasson embankment slope,verges or other locations shown on the drawing oras directed by the Engineer including preparation of ground,fetching of rodsand watering
Providing and laying boulder Apron gully bed in up and down stream of structure for protection against scour with stone boulder weighing not less than 40 kg. each complete as per drawing and technical specification.
Construction of temporary camp hut for storage of materials and for accommodation of deptt. Staffs for supervision of work labour manson at the project.
E/works in excavation for making diversion channel for construction of RCC structure as directed.
Earth works in filling for construction of coffer dam during construction period to divert the main stream.
Earth works in filling for construction of earthen diversion channel started before construction of RCC Drop-spill way by manual means.
Sign board etc. & photo evidence
Tube Well for drinking water
Laouripara GCP at Laouripara Adibhasi Village (Part-II)
(A) Earth works in excavation for foundation trenchesincluding filling up trenches and removal of surplusspoil after completion of foundation work removing etc. watering up to water level.
(B) Below foundation.
Plan cement work foundation with proportion 1:3:6etc. complete as per drawing and technical specification.
R.C.C works in prop (1:2:4) with river graded gravel with size 12 mm to 25 mm size free from dirt excluding cost ofreinforcement (reinforcement with be made and payment separately)and including cost of shuttering cluttering curing ramming etc. complete asdirected.
Supply fitting and placing TMTCRS (Fc.500) bar reinforcement in the structure complete as per drawing and technical specification including cutting and binding with ring etc. @ 60 kg/m³
Plastering with cement mortar in prop. 1:2 on all wall and apron including clearing the surfaces and curing eye complete as directed.
A) E/W in filling in front head wall, extension Head Wall by the side of side wall and wing wall junction of the structure with approved materials obtained from borrow pits with all leadand lifts
B) Guide Band
Furnishing and laying of the live sods of perennial turf forming grasson embankment slope,verges or other locations shown on the drawing oras directed by the Engineer including preparation of ground,fetching of rodsand watering
Providing and laying boulder Apron gully bed in up and down stream of structure for protection against scour with stone boulder weighing not less than 40 kg. each complete as per drawing and technical specification.
Construction of temporary camp hut for storage of materials and for accommodation of deptt. Staffs for supervision of work labour manson at the project.
E/works in excavation for making diversion channel for construction of RCC structure as directed.
Earth works in filling for construction of coffer dam during construction period to divert the main stream.
Earth works in filling for construction of earthen diversion channel started before construction of RCC Drop-spill way by manual means.
Sign board etc. & photo evidence
Tube Well for drinking water
Laouripara GCP at Laouripara Village (Part-III)
(A) Earth works in excavation for foundation trenchesincluding filling up trenches and removal of surplusspoil after completion of foundation work removing etc. watering up to water level.
(B) Below foundation.
Plan cement work foundation with proportion 1:3:6etc. complete as per drawing and technical specification.
R.C.C works in prop (1:2:4) with river graded gravel with size 12 mm to 25 mm size free from dirt excluding cost ofreinforcement (reinforcement with be made and payment separately)and including cost of shuttering cluttering curing ramming etc. complete asdirected.
Supply fitting and placing TMTCRS (Fc.500) bar reinforcement in the structure complete as per drawing and technical specification including cutting and binding with ring etc. @ 60 kg/m³
Plastering with cement mortar in prop. 1:2 on all wall and apron including clearing the surfaces and curing eye complete as directed.
A) E/W in filling in front head wall, extension Head Wall by the side of side wall and wing wall junction of the structure with approved materials obtained from borrow pits with all leadand lifts
B) Guide Band
Furnishing and laying of the live sods of perennial turf forming grasson embankment slope,verges or other locations shown on the drawing oras directed by the Engineer including preparation of ground,fetching of rodsand watering
Providing and laying boulder Apron gully bed in up and down stream of structure for protection against scour with stone boulder weighing not less than 40 kg. each complete as per drawing and technical specification.
Construction of temporary camp hut for storage of materials and for accommodation of deptt. Staffs for supervision of work labour manson at the project.
E/works in excavation for making diversion channel for construction of RCC structure as directed.
Earth works in filling for construction of coffer dam during construction period to divert the main stream.
Earth works in filling for construction of earthen diversion channel started before construction of RCC Drop-spill way by manual means.
Sign board etc. & photo evidence
Tube Well for drinking water
Land Development Project at Amguri Village (Part-IV)
Clearing and grubbing surface drain including uprooting rank vegetation, grass, bushes, shrubs, sapling etc. and dispose of unserviceable materials outside the periphery of the area. By manual means in area of light jungle.
Construction of embankment with approved material obtained borrow pits with all lifts and leads, transporting to site, spreading, Grading to required slope and compacting as directed.
Turfing with sods Furnishing & laying of the live sods of perennial turf forming Grass on embankment slope, verges and other location as direct.
Planting of trees in the embankments
Signboard & Photo Evidence
Wetland Development Project at Pretgaon Village (Part-V)
Earth work in excavation including removing the spoil as directed for excavated pond up to a distance of 100 m including dressing, cambering, grading the surface etc. all completed as per direction.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and watering etc. area of sides of embankment.
Planting of trees in the embankments
Signboard & Photo Evidence
stage.html
html • 0.04 MB
techsummary_30861.pdf
PDF • 0.13 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_30861.pdf
PDF • 1.51 MB
SIDLI.pdf
PDF • 1.51 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .