| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.4 L+₹15,930 (2.20%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical 14 C POCKET A VIKAS PURI EXT NEW DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
| Sl No | Description | Qty | Unit | Super System Engineers L1 | Shakti Trading Co. L2 |
|---|---|---|---|---|---|
| 1.00 | Installation, Operation & Maintenance of 60 HP sewage pump-set trolley with all necessary accessories such as Starter/Panel, Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity for running the pump-sets shall be provided by the department as per site conditions.
Period: 45 days x 3 Shift = 135 Shift. | 135 | shifts | 3,24,000 ₹3,82,320 Lowest | 3,30,750 ₹3,90,285 |
| 2.00 | Installation, Operation & Maintenance of 50 HP sewage pump-set trolley with all necessary accessories such as Starter/Panel, Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity for running the pump-sets shall be provided by the department as per site conditions.
Period: 45 days x 3 Shift = 135 Shift. | 135 | shifts | 2,90,250 ₹3,42,495 Lowest | 2,97,000 ₹3,50,460 |
Tender Value
Refer Docs
EMD Value
₹14,900
Closing Date
5 Oct 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-15
C-2A Block Opp. Geeta Mandir Janakpuri
Deployment of 60HP and 50HP Temporary Sewage pump-set Trolley with all associated EnM equipment on hiring basis near CM Shri School (Sarvodya Vidhyalya) at Joginder Singh Marg in Janakpuri Constituency AC-30.
2026_DJB_299170_5
NIT No. 3 (2026-27)EE(EnM)M-15
Open Tender
Miscellaneous Works
Works
45 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
DJB Account No. 50448339804
₹14,900
8 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Installation, Operation & Maintenance of 60 HP sewage pump-set trolley with all necessary accessories such as Starter/Panel, Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity for running the pump-sets shall be provided by the department as per site conditions.
Period: 45 days x 3 Shift = 135 Shift. | 135 | shifts | 80 | ₹10,800 | 18% |
| 2 | Installation, Operation & Maintenance of 50 HP sewage pump-set trolley with all necessary accessories such as Starter/Panel, Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity for running the pump-sets shall be provided by the department as per site conditions.
Period: 45 days x 3 Shift = 135 Shift. | 135 | shifts | 80 | ₹10,800 | 18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_399245.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .