Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹141.21Accepted-AOC 302 APOLLO ARCADE APOLLO ARCADE 7819 AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | ₹141.21 Quoted ₹2.2 Cr | L1 | Accepted-AOC L1 |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
15 Nov 2024, 5:30 pmClosed
NAVIN KUMAR
ED - Gurgaon
Up-gradation of 100 to 200 bedded hospital in sector-10 Gurugram (Providing lifts)
2024_HRY_406320_1
2024F94B2CE3 EA1D 4A81 B46E AFBB0B69482C664BAR
Open Tender
Civil Works
Works
180 days
Gurugram
2 documents required · 2 mandatory
₹15,000
₹2.9 L
Yes
6 Jun 2025
24 Oct 2024
18 Nov 2024
24 Oct 2024
15 Nov 2024
24 Oct 2024
24 Oct 2024 - 25 Oct 2024
Amount
Supply , erection testing and commissioning of electric traction elevator of OTIS/KONE /MITUSUBISHI/ KINETIC HUNDAI/ ORBIS/ SCHINDLER / HITACHI/ JOHNSON make suitable for 20 persons (as per manufacturer) (1360 kg. weight) having speed @ 1.0 meters per second to travel from basement + ground + 5 upper floors with 7 stops, 7 opening as per technical specifications attached, upto the entire satisfaction of the Engineer-in-charge.
Supply , erection testing and commissioning of electric traction elevator of OTIS/KONE /MITUSUBISHI/ KINETIC HUNDAI/ ORBIS/ SCHINDLER / HITACHI/ JOHNSON make suitable for 20 persons (as per manufacturer) (1360 kg. weight) having speed @ 1.0 meters per second to travel from ground + 5 upper floors with 6 stops, 6 opening as per technical specifications attached, upto the entire satisfaction of the Engineer-in-charge.
Supply , erection testing and commissioning of electric traction elevator of OTIS/KONE /MITUSUBISHI/ KINETIC HUNDAI/ SCHINDLER / HITACHI/ JOHNSON/ORBIS make suitable for 13 persons (884 kg. weight) with rear side glass having speed @ 1.5 meters per second to travel from ground + 5 upper floors with 6 stops, 6 opening as per technical specifications attached, upto the entire satisfaction of the Engineer-in-charge.
Annual Maintenance Charges for above said 6 nos. escalator after expiry of one year warrantee period complete with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-Charge of work 1st Year (after one year guarantee period)
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .