Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC NO 15 B 2ND FLOOR 4TH CROSS T ASHWATHNARAYANA ROAD THIMMAIAH NAGARA YELAHANKA BANGALORE 560 064 | BANGALORE | BANGALORE | KARNATAKA | 560064 | L1 | Accepted-AOC Being L1 amt | |
| 2 | L2₹15.9 L+₹55,000 (3.57%)Rejected-Finance HOUSE NO 599 D SURYA NAGAR PHASE II SECTOR 91 FARIDABAD 121013 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121013 | L2 | Rejected-Finance Being as L2 Amount | |
| 3 | L3₹16.5 L+₹1.1 L (7.14%)Rejected-Finance 112 AMBALA ROAD NARAINGARH AMBALA 134203 | NARAINGARH | AMBALA | HARYANA | 134203 | L3 | Rejected-Finance Being as L2 Amount |
| Sl No | Description | Qty | Unit | unique power & control system L2 | Phoenix Infra L1 | J S CONSTRUCTION CO L3 |
|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF STAIRCASE OF BAILEY BRIDGE AT RRRC DELHI. (QTY-02) The contractor shall execute and complete the erection of the staircase of the Bailey Foot Over Bridge at RRRC Delhi, strictly in accordance with approval structural drawings specifications and direction of the Engineer-in-Charge. The staircase structure comprises steel stringers, MS chequered plate treads, landings handrails and associated bracing. | ||||||
| 1.01 | Drawing:- Drawing of staircase photo is attached as PDF in RFP. Vender are requested to ensure attached drawing duly tested in STAAD software and vetted by IIT/responsible institute before starting the Job.
Dimension of staircase- Stair width- 1500mm clear between handrails, Tread depth- 300mm, Rise per step-150-170mm, stringer beams- ISMB/ISMC/Box as per drawings, Landing length-1200mm, Handrail height - 1000mm, Live load : 100 x indls (80 Kgs each), Baluster spacing- not exceeding 1000mm centre-to-centre, Total height- Approx-6.0m from ground to bridge deck level.
Material of wk -All structural steel components including bailey panels, stringers, transoms, landings, handrails, balusters and chequered plates shall conform to IS 2062-Hot Rolled medium & high tensile structural steel. All materials shall be new, free from rust & subject to prior approval of the Engr-in-Charge.
Method of Execution - Preliminary Arrangements, Erection of stair tower & stringers, Fixing of treads and landings, Handrails & safety rails and finishing of work as per TS mentioned in RFP (PDF).
Quality control & tests - Shall be carried out as per applicable IS Codes. Details of the same mentioned in RFP (PDF)
Note- Safety provisions, Inspection and acceptance, Contractor's responsibility etc. and all other necessary docus/discription of work as per TS mentioned in RFP (PDF) | 1 | Nos | 15,95,000 ₹15,95,000 | 15,40,000 ₹15,40,000 Lowest | 16,50,000 ₹16,50,000 |
Tender Value
Refer Docs
EMD Value
₹85,000
Closing Date
16 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commanding Officer, 57 Engr Regt
Commanding Officer 57 Engineer Regiment PIN - 914057c/o 56 APO
Provision for construction of staircase of Bailey Bridge at RRRC Delhi
2025_ARMY_729217_1
Construction of Staircase of Bailey Bridge at RRRC Delhi
Limited
Construction Works
Works
14 days
RRRC Delhi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹85,000
RRRC Delhi
29 Nov 2025
3 Sept 2025
17 Sept 2025
3 Sept 2025
16 Sept 2025
10 Sept 2025
4 Sept 2025 - 6 Sept 2025
6 Sept 2025
Amount
CONSTRUCTION OF STAIRCASE OF BAILEY BRIDGE AT RRRC DELHI. (QTY-02) The contractor shall execute and complete the erection of the staircase of the Bailey Foot Over Bridge at RRRC Delhi, strictly in accordance with approval structural drawings specifications and direction of the Engineer-in-Charge. The staircase structure comprises steel stringers, MS chequered plate treads, landings handrails and associated bracing.
Drawing:- Drawing of staircase photo is attached as PDF in RFP. Vender are requested to ensure attached drawing duly tested in STAAD software and vetted by IIT/responsible institute before starting the Job. Dimension of staircase- Stair width- 1500mm clear between handrails, Tread depth- 300mm, Rise per step-150-170mm, stringer beams- ISMB/ISMC/Box as per drawings, Landing length-1200mm, Handrail height - 1000mm, Live load : 100 x indls (80 Kgs each), Baluster spacing- not exceeding 1000mm centre-to-centre, Total height- Approx-6.0m from ground to bridge deck level. Material of wk -All structural steel components including bailey panels, stringers, transoms, landings, handrails, balusters and chequered plates shall conform to IS 2062-Hot Rolled medium & high tensile structural steel. All materials shall be new, free from rust & subject to prior approval of the Engr-in-Charge. Method of Execution - Preliminary Arrangements, Erection of stair tower & stringers, Fixing of treads and landings, Handrails & safety rails and finishing of work as per TS mentioned in RFP (PDF). Quality control & tests - Shall be carried out as per applicable IS Codes. Details of the same mentioned in RFP (PDF) Note- Safety provisions, Inspection and acceptance, Contractor's responsibility etc. and all other necessary docus/discription of work as per TS mentioned in RFP (PDF)
unique power & control system (BID ID -3426561)
J S CONSTRUCTION CO (BID ID -3425878)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .