Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | Rejected-Technical CHINNA MOKKANANGURICHI THANTHONI KARUR | KARUR | TAMIL NADU | 621301 | - | Rejected-Technical L2 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
13 Jan 2021, 3:00 pmClosed
Block Development Officer
Panchayat Union Kadayanallur
Construction of kitchen Shed for community Hall at Muslim Street in Thirikudapuram Panchayat MLACDS 2018-19
2021_RDTN_190284_1
A3/4010/2019
Open Tender
Civil Works
Works
180 days
Panchayat Union Kadayanallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
27 Jan 2021
7 Jan 2021
13 Jan 2021
7 Jan 2021
13 Jan 2021
7 Jan 2021
Amount
Construction of kitchen Shed for community Hall at Muslim Street in Thirikudapuram Panchayat,MLACDS 2018-19
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Centering charges for RCC works including all cost and conveyance all materials to site etc., complete.
Upto Basement level
Above basement level
Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering.
Plastering with CM 1:3 mix using to 10mm thick including all cost and conveyance of all materials and all labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete
Weathering Course with brick jelly lime concrete to 0.075m thick and Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Paving the floor with best quality Vetrified ( Such as Morbonite) Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.
Distempering two coats using best quality and approved colour of oil bound distemper over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting with enamel paint of approved colour over new iron works including cost and conveyance and all labour charges etc., complete.
Supply & Delivery of Rolling Shutter, Doors, Windows & Ventilators
Door D 1.20 x 2.10
Window W 1.20 x 1.30
Ventilator V 0.90 x 0.45
Labour charges for fixing of steel doors including all cost and conveyance of materials and all labour charges etc complete.,
Labour charges for fixing of steel window including all cost and conveyance of materials and all labour charges etc complete.,
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.Velusamy
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_227236.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .