Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.4 L+₹26,858 (2.05%)Admitted-Fee/PreQual/Technical/Finance | ₹13.4 L+₹26,858 (2.05%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.5 L+₹36,900.09 (2.81%)Admitted-Fee/PreQual/Technical/Finance | ₹13.5 L+₹36,900.09 (2.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.1 L+₹93,751.10 (7.15%)Admitted-Fee/PreQual/Technical/Finance | ₹14.1 L+₹93,751.10 (7.15%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MEIGNANAM D L4 | S.Gopi L2 | N NASURUDEEN L3 | K. THENMOZHI L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cost of rection of M.S. outer casing pipe 600 mm dia upto the required depth incluidng drilling of 450 mm dia M.S. pipe and pulling out the outer casing pipe after packing of the well and as directed by Board officers. | 1 | No | 9,900 ₹9,900 | 8,000 ₹8,000 Lowest | 9,500 ₹9,500 | 9,200 ₹9,200 |
| 2.00Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and stand stone shale pebbles boulders etc., by first taking a pilot bore of 150mm/140mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs fuel, labour and drilling bentonite and water required for drilling at site and including construction of mud pit etc., complete | |||||||
| 2.01 | i) Up to 60M Depth | 60 | m | 2,075 ₹1,24,500 | 2,000 ₹1,20,000 | 1,991.82 ₹1,19,509.2 | 1,750 ₹1,05,000 Lowest |
| 2.02 | ii) From 60-90M | 30 | m | 2,248 ₹67,440 | 2,200 ₹66,000 | 2,157.79 ₹64,733.7 | 2,100 ₹63,000 Lowest |
| 2.03 | iii) From 90-120M | 30 | m | 2,383.78 ₹71,513.4 | 2,300 ₹69,000 | 2,287.46 ₹68,623.8 Lowest | 2,300 ₹69,000 |
| 2.04 | iv) From 120-150M | 30 | m | 2,509 ₹75,270 | 2,300 ₹69,000 Lowest | 2,408 ₹72,240 | 2,450 ₹73,500 |
| 2.05 | v) From 150- 180M | 30 | m | 2,548 ₹76,440 | 2,400 ₹72,000 Lowest | 2,445.67 ₹73,370.1 | 2,453 ₹73,590 |
| 2.06 | vi) From 180-210M | 30 | m | 2,631 ₹78,930 | 2,400 ₹72,000 Lowest | 2,524.77 ₹75,743.1 | 2,550 ₹76,500 |
| 2.07 | vii) From 210-240M | 30 | m | 2,706 ₹81,180 | 2,500 ₹75,000 Lowest | 2,597.39 ₹77,921.7 | 2,590 ₹77,700 |
| 2.08 | viii) From 240-270M | 30 | m | 2,801.35 ₹84,040.5 | 2,600 ₹78,000 Lowest | 2,688.16 ₹80,644.8 | 2,600 ₹78,000 Lowest |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
13 Aug 2026, 3:00 pmClosed
The Commissioner
Municipal office, Aranthangi
Providing Deep Borewell in Puthukulam Thiruvalluvar theru, Ward no.01 at Aranthangi Municipality
2026_MAWS_690685_1
02914/2026/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Item Rate
90 days
Aranthangi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,000
13 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of rection of M.S. outer casing pipe 600 mm dia upto the required depth incluidng drilling of 450 mm dia M.S. pipe and pulling out the outer casing pipe after packing of the well and as directed by Board officers. | 1 | No | - | - |
| 2Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and stand stone shale pebbles boulders etc., by first taking a pilot bore of 150mm/140mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs fuel, labour and drilling bentonite and water required for drilling at site and including construction of mud pit etc., complete | |||||
| 2.01 | i) Up to 60M Depth | 60 | m | - | - |
| 2.02 | ii) From 60-90M | 30 | m | - | - |
| 2.03 | iii) From 90-120M | 30 | m | - | - |
| 2.04 | iv) From 120-150M | 30 | m | - | - |
| 2.05 | v) From 150- 180M | 30 | m | - | - |
| 2.06 | vi) From 180-210M | 30 | m | - | - |
| 2.07 | vii) From 210-240M | 30 | m | - | - |
| 2.08 | viii) From 240-270M | 30 | m | - | - |
stage.html
html • 0.02 MB
finance_830419.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_830419.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .