Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | ₹6.1 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 L+₹71,300 (11.6%)Admitted-Finance 126 JULEDHA SARDHANA SARDHANA MEERUT UTTAR PRADESH 250342 | MEERUT | UTTAR PRADESH | 250342 | ₹6.8 L+₹71,300 (11.6%) | L2 | Admitted-Finance |
| 3 | L3₹6.9 L+₹78,450 (12.8%)Admitted-Finance | ₹6.9 L+₹78,450 (12.8%) | L3 | Admitted-Finance |
| 4 | L4₹7.5 L+₹1.4 L (22.7%)Admitted-Finance | ₹7.5 L+₹1.4 L (22.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DHARAM DASS & BUDH PRAKASH & CO. L2 | shree sai enterprises L1 | M/s Sigma Electricals L3 | Krisha & co L4 |
|---|---|---|---|---|---|---|---|
| 1.00Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Supervising Engineer. | |||||||
| 1.10 | PCC/STP Pole 8.5/11/13 Mtr Long. | 12 | Nos. | 800 ₹9,600 | 400 ₹4,800 Lowest | 500 ₹6,000 | 800 ₹9,600 |
| 1.20 | Line material such as HT/LT Cross Arms, HT/LT pin insulator, HT/LT pin, HT/LT disc insulator with fitting, ACSR conductor, MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc. | 300 | Qtl | 300 ₹90,000 | 200 ₹60,000 | 250 ₹75,000 | 10 ₹3,000 Lowest |
| 2.00 | Erection of PCC/STP pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). | 12 | Nos. | 1,400 ₹16,800 Lowest | 1,500 ₹18,000 | 1,800 ₹21,600 | 3,500 ₹42,000 |
| 3.00 | Laying lifting stringing & proper sagging of ACSR conductors sq.mm etc. (as per UPPCL Respo). | 900 | span | 75 ₹67,500 Lowest | 150 ₹1,35,000 | 200 ₹1,80,000 | 250 ₹2,25,000 |
| 4.00 | Straightening the Pole after the Pole straightening of tilted pole etc. (as per UPPCL Respo). | 12 | Nos. | 1,800 ₹21,600 | 500 ₹6,000 Lowest | 500 ₹6,000 Lowest | 2,500 ₹30,000 |
| 5.00 | Re-sagging of the Old loose conductor etc. (as per UPPCL Respo). | 200 | Span | 75 ₹15,000 Lowest | 100 ₹20,000 | 100 ₹20,000 | 500 ₹1,00,000 |
| 6.00 | Earthing of each HT/LT line pole properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo). | 12 | Nos. | 1,400 ₹16,800 | 400 ₹4,800 | 350 ₹4,200 | 300 ₹3,600 Lowest |
| 7.00 | Providing and Fixing of Dead and Clamp. (As Per Direction of Supervising Engineer). | 60 | Nos. | 280 ₹16,800 | 200 ₹12,000 | 150 ₹9,000 Lowest | 150 ₹9,000 Lowest |
| 8.00 | Providing and Fixing of J hook (As Per Direction of Supervising Engineer). | 60 | Nos. | 280 ₹16,800 | 200 ₹12,000 | 150 ₹9,000 | 110 ₹6,600 Lowest |
Tender Value
₹8.4 L
EMD Value
₹8,360
Closing Date
20 Mar 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SE, EDC-1, MEERUT
ETNo-52/EDC-1/MT/2025-26
2026_PVVNL_1123755_1
ETNo.52/EDC-1/MT/2025-26
Open Tender
Electrical Works
Lump-sum
180 days
UNDER EDD-PARTAPUR MEERUT
ETNo-52/EDC-1/MT/2025-26
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER
₹8,360
31 Mar 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Supervising Engineer.
PCC/STP Pole 8.5/11/13 Mtr Long.
Line material such as HT/LT Cross Arms, HT/LT pin insulator, HT/LT pin, HT/LT disc insulator with fitting, ACSR conductor, MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc.
Erection of PCC/STP pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo).
Laying lifting stringing & proper sagging of ACSR conductors sq.mm etc. (as per UPPCL Respo).
Straightening the Pole after the Pole straightening of tilted pole etc. (as per UPPCL Respo).
Re-sagging of the Old loose conductor etc. (as per UPPCL Respo).
Earthing of each HT/LT line pole properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo).
Providing and Fixing of Dead and Clamp. (As Per Direction of Supervising Engineer).
Providing and Fixing of J hook (As Per Direction of Supervising Engineer).
Providing and Fixing of Piercing Clamp (As Per Direction of Supervising Engineer).
Providing and fixing of Holding Clamp (As Per Direction of Supervising Engineer).
Providing and fixing of F clamps (As Per Direction of Supervising Engineer).
Providing and Fixing of LT Insulator (As Per Direction of Supervising Engineer).
Providing and fixing of MS Nut & Bolts (As Per Direction of Supervising Engineer).
Cutting & chopping tree branches near side of line for making the clearance between line and tree.
Loading and unloading of Theft or damaged transformers from different sites under the division to work shop/store center, meerut and back carriage of OK transformers form work shop/store center meerut to different sites under this division at other end with proper placment of transformers in all respect.
10 KVA to 100 KVA (by manually/crane) (As Per Direction of Supervising Engineer).
160 KVA to 400 KVA (by manually/crane) (As Per Direction of Supervising Engineer).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_2093705.xls
BOQ • 0.28 MB
TENDERFORM52.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .