| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC 126A AGGARSAIN COLONY HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹2.5 Cr Quoted ₹3.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹13.1 L (3.84%)Rejected-AOC FARIDABAD FARIDABAD HARYANA | FARIDABAD | HARYANA | 121001 | ₹3.5 Cr+₹13.1 L (3.84%) | L2 | Rejected-AOC EMD Release |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
5 May 2021, 5:00 pmClosed
Executive Engineer
Provincial Division No. 3, PWD B and R Br., Hisar
Construction of Burjs and Barbed Wire Fencing for 3000 Acre Land (Phase-III) at, Hisar Airport
2021_HRY_168689_1
Construction of Burjs and Barbed Wire Fencing for
Open Tender
Civil Works
Item Wise
365 days
Hisar
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹4.1 L
Yes
10 Nov 2021
13 Apr 2021
6 May 2021
15 Apr 2021
5 May 2021
15 Apr 2021
Amount
Earthwork in excavation in foundation, trenches etc, in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Cleaning Jungle including uprooting of rank vegetation grass brush wood, trees and saplings of girth upto 30cm measured at a height of 1 metre above ground level and removed of rubbish upto a distance of 50m outside the periphery of the area cleared. (HSR 6.26)
Cement concrete 1:6:12 with stone aggregate 40mm Nominal size in foundation and plinth. (HSR 10.32)
Cement concrete 1: 2 : 4 with stone aggregate 20 mm nominal size in foundation and plinth. (HSR 10.41)
Cement concrete 1:2:4 with stone aggregate 20 mm nominal size for reinforced concrete work for walls exceeding 20 cm thickness (straight and curved) beams, girders, stairs, columns, (square or rectangular) battens and lintels etc. excluding steel reinforcement but including centering and shuttering, laid in position, complete in all respects. (HSR 10.86)
2.44 metres high fencing, with 2.90 metres posts, placed at every 3.05 metres apart embedded in cement concrete blocks, and every fifth post, to be strutted, provided with 13 horizontal lines with 2 diagonal of G.I barbed wire, weighing 9.34 kg. per 100 staples, tied to 6 mm bar nib, with binding wire or by providing cut, including drilling holes, in the post complete (excluding the cost of posts, struts, earth work and concrete which is payable extra) (NS) (Rate drived as per HSR 24.36)
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade of more for RCC work, where no included in the complete rate of the RCC including strengthening, bending, binding, wastage, and annealed steel wire etc. and placing in the position complete in all respects for all heights/depths/storeys/basements etc. (Note - Reinforcement shall be measured in length i/c hooks, if any, separately for the different diameters as actually used in work, excluding overlaps. wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates of reinforcement) (HSR 18.22)
K K BOORA CONSTRUCTION CO.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .