| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC | ₹7.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.1 CrRejected-AOC | ₹7.1 Cr | L2 | Rejected-AOC Accepted |
Tender Value
₹7.1 Cr
EMD Value
₹14.2 L
Closing Date
28 Apr 2026, 2:00 pmClosed
General Manager, Zone-7, Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Lucknow.
Extension work of First Floor of Life Science Building at campus C.S.J.M. Kanpur University District-Kanpur (U.P.)
2026_UPPRC_1139846_1
15/UPPCL/GM-7/E-TENDER/2026-27 Dated-13.04.2026
Open Tender
Civil Works - Buildings
Percentage
365 days
C.S.J.M. Kanpur University District-Kanpu
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹14.2 L
5 Aug 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Extension work of First Floor of Life Science Building at campus C.S.J.M. Kanpur University District-Kanpur (U.P.) | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | - | Cum | - | - |
| 3 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form- work, in foundation and floors. | - | Cum | - | - |
| 4 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor :With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | sqm | - | - |
| 5 | Class 150 brick work in 1:4 Cement and coarse sand in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of brick work as required and also including honeycombed brick work in thickness of wall more than 12cms. (1:4 cement : coarse sand). | - | Cum | - | - |
| 6 | Providing and laying Autoclaved Aerated concrete(AAC) blocks masonry with 150 mm to 300 mm thick with Grade-1 AAC blocks of density 551 to 650 kg/cum conforming to IS:2185 (Part 3) in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). | - | CUM | - | - |
| 7 | Suplly & intallation cemented dry wall partition with MS frame 12mm Everest Board 48mm Everest Galvalume Stud (BMT 0.5,@610mm C/C) 50mm Everest Wall Track (BMT 0.5) 48mm Track Noggin - @ 1220mm C/C (BMT 0.5)(2 Nos 25mm Everest Drywall Screw Steel Screws | - | SQM | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) (R.C.C. COLUMNS) | - | Cum | - | - |
| 10 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in slab Ground Floor | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.63 MB
BOQ_2128368.xls
BOQ • 0.62 MB
BIDDOC15.pdf
Tender Documents • 21.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].