Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,600
Closing Date
9 Jul 2025, 2:00 pmClosed
SUPERINTENDING ENGINEER/TEDC/TUTICORIN
131, 132, ETTAYAPURAM ROAD, TUTICORIN
EOS TO M/S.SRI KARTHI KRISHNA FARMS AND MINES (P) LTD., AND M/S.JSV BRICKS IN PUTHIAMPUTHUR SECTION
2025_EB_573373_1
SE/TEDC/TTN/MM/WC.002/25-26 DT.24.06.25
Open Tender
Electrical Works
Item Rate
90 days
TUTICORIN
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹4,600
Yes
23 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
9 Jul 2025
25 Jun 2025
25 Jun 2025 - 9 Jul 2025
Amount
Loading & unloading of 9mtr PSC Pole
Loading & unloading of 8mtr PSC Pole
Erection of centre support
Excavation of normal ground and Erection of 9mtr PSC Pole
Excavation of normal ground and Erection of 8mtr PSC Pole
Transporting of 9mtr PSC Pole from Road Side to Pole pit
Transporting of 8mtr PSC Pole from Road Side to Pole pit
Erection of 3.5' V cross arm
Erection of Tapping channel cross arm
Erection of HT TI fitting
Fixing of 11KV Polymer Disc with metal parts
Fixing of 11KV Polymer Pin insulator
Excavation of normal ground and Erection of stay set complete
Loading & unloading of 63 KVA/22 KV DT
Loading & unloading of 250 KVA/11 KV DT
Transporting of DT 63 KVA/22 KV & 250 KVA/11 KV
Erection of 63 KVA/22 KV Distribution Transformer
Erection of 250 KVA/11KV Distribution Transformer
Erection of Single Pole Transformer Structure complete set
Erection of Double Pole Transformer Structure complete set
Erection of 3phase cross arm
Erection of LT Shackle with metal parts
Erection of Alu. Knob
HT Line Stringing, Sagging binding of conductor 7/3.15 AAAC
HT Line Stringing, Sagging binding of conductor 7/3.15 AAAC including transporting of materials from Road side to site with LC 50%
LT Line Stringing, Sagging binding of conductor 7/3.15AAAC including transporting of materials from Road side to site
Alteration of Clamp
Earthing of pole
Concreting of pole
Dismantling& Re Erection of 3 phase X arm
Dismantling & Re- Erection of LT pin insulator & Shackle & Al-Knob
Dismantling & Re Erection of 7/2.50 AAAC
G.S.T. @18% should be Entered by the Bidder
JACCOB AND CO (BID ID -1385587)
M/S MARY CONSTRUCTIONS (BID ID -1383739)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .