Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC KALNA GATE KHANPUKUR BURDWAN 713101 | BURDWAN | BURDWAN | WEST BENGAL | 713101 | L1 | Accepted-AOC L1 in Sealed Bid | |
| 2 | L2₹6.6 L+₹34,509.55 (5.55%)Rejected-Finance | L2 | Rejected-Finance L2,Absent in Sealed Bid | |
| 3 | L3₹6.8 L+₹54,406.94 (8.75%)Rejected-Finance | L3 | Rejected-Finance L3,Evaluated amount obtained after Sealed Bid, dated 10.08.20 at the rate of 12.99 percent less |
Tender Value
₹7.8 L
EMD Value
₹16,000
Closing Date
13 Jul 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer(AM),Burdwan(AM) Division
OFFICE OF THE EXECUTIVE ENGINEER (A-M) BURDWAN (A-M) DIVISION KALNA ROAD, PURBA BARDHAMAN
ENERGISATION OF BHOLADANGA-II MAJOR RLI AT PURBASTHALI-II BLOCK UNDER PURBASTHALI CCC BY INSTALLING 63 KVA DTR WITH DRAWAL OF NEW 11 KV HTOH LINE AND INSTALLING ALL NECESSARY EQUIPMENTS AND FINALLY CONNECTING THE SYSTEM WITH THE EXISTING 11 KV
2020_WRDD_285749_4
2/WRDD/EE AM /BURDWAN AM DIVN/of 2020-21
Open Tender
Electrical Work/ Equipment
Percentage
60 days
Bholadanga, Purbasthali-II
Please refer Tender documents.
3 documents required · 3 mandatory
₹16,000
Yes
13 Aug 2020
7 Jul 2020
16 Jul 2020
7 Jul 2020
13 Jul 2020
7 Jul 2020
180 days
eProcurement System of Government of West Bengal Created By: TAPAS PATRA Created Date/Time: 11-Aug-2020 01:08 PM Tender Title: ENERGISATION OF BHOLADANGA-II MAJOR RLI AT PURBASTHALI-II BLOCK UNDER PURBASTHALI CCC BY INSTALLING 63 KVA DTR WITH DRAWAL OF NEW 11 KV HTOH LINE AND INSTALLING ALL NECESSARY EQUIPMENTS Tender ID: 2020_WRDD_285749_4
Tender Inviting Authority: Executive Engineer(AM),Burdwan(AM) Division
Name of Work:Electrification of BHOLADANGA-II RLI at PURBASTHALI-II Block Under RIDF XXIV Programme
Contract No: NIT-2/WRDD/EE (AM) /BURDWAN (AM) DIVN/of 2020 – 2021(2nd Call)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Nandi & Sons 777242.00 -15.55 656380.87 Six Lakh Fifty Six Thousand Three Hundred and Eighty
2.00 MS B N ENTERPRISE 777242.00 -15.55 656380.87 Six Lakh Fifty Six Thousand Three Hundred and Eighty
3.00 PROTIVA PROGRESSIVE 777242.00 -5.75 732550.59 Seven Lakh Thirty Two Thousand Five Hundred and Fifty
Lowest Amount Quoted BY: Nandi & Sons,MS B N ENTERPRISE(656380.87)
BOQ Summary Details Tender Title: ENERGISATION OF BHOLADANGA-II MAJOR RLI AT PURBASTHALI-II BLOCK UNDER PURBASTHALI CCC BY INSTALLING 63 KVA DTR WITH DRAWAL OF NEW 11 KV HTOH LINE AND INSTALLING ALL NECESSARY EQUIPMENTS Tender ID: 2020_WRDD_285749_4
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Nandi & Sons 656380.87 L1
2 MS B N ENTERPRISE 656380.87 L1
3 PROTIVA PROGRESSIVE 732550.59 L2
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .