| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-AOC N A | FARIDABAD | HARYANA | 121004 | L1 | Accepted-AOC Bid is awarded as the bidding price was lowest among all bidding contractors . | |
| 2 | L2₹22.6 L+₹1.6 L (7.73%)Rejected-AOC | L2 | Rejected-AOC The bid is rejected as the bid amount for the work was second
Compared to the lowest 1st successful bidder | |
| 3 | L3₹22.8 L+₹1.7 L (8.24%)Rejected-Finance | L3 | Rejected-Finance The Bidder is third Lowest. | |
| 4 | L4₹23.6 L+₹2.5 L (12.1%)Rejected-Finance | L4 | Rejected-Finance The Bidder is fourth Lowest. | |
| 5 | L5₹27.6 L+₹6.6 L (31.3%)Rejected-Finance | L5 | Rejected-Finance The Bidder is fifth Lowest. |
Tender Value
Refer Docs
EMD Value
₹58,540
Closing Date
2 Dec 2020, 5:00 pmClosed
E.E. M.G.C.Q.C.D-2, Haridwar
E.E. M.G.C.Q.C.D-2, Haridwar
Construction of Hzibera minor from km 4.400 to km 4.875 and D.R.B. AT K.M.4.760 OF M.G.C STAGE-II
2020_UPIDC_532552_8
03/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
120 days
sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹58,540
29 Jan 2021
25 Nov 2020
3 Dec 2020
25 Nov 2020
2 Dec 2020
25 Nov 2020
Amount
Earth work in filling for making diversion i/c all lead &lift ,dressing,compaction complete.
Providing and laying Ist class Brick on edge soiling 110 mm thick including cost of material, labour and T&P etc complete.
Earth work in excavation of foundation i/c lead up to 30.00 & lift up to 1.50m..
Shuttering for P.C.C. including cost of material, labour and T&P etc complete.
Providing and laying P.C.C. 1:4:8 in foundation including cost of material, labour and T&P etc complete.
M-100 brick work in 1:4 cement coarse sand mortar including cost of material, labour and T&P etc complete.
Shuttering for R.C.C. including cost of material, labour and T&P etc complete.
R.C.C. in 1:1.5:3 including cost of material, labour and T&Petc complete.
Supplying and placing steel reinforcement for RCC work in including cost of material, labour of cutting, bending, binding and T&P complete
P.C.C.1:6:12 in back filling of Abutment including cost of material, labour and T&P etccomplete.
Struck deep Pointing in 1:2 cm. includigcost of material, labour and T&P etc complete.
S/F Drainage Spout P.V.C. 75 mm dia pipe including cost of material, labour and T&P etc complete.
S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete.
S/Laying Tarfelt in 3- layers for Bearing slab. i/c cost of material, labour and T&P etc complete.
S/Lwheel Guard stone including gcost of material, labour and T&P etc complete.
Dismantling Ist class Brick on edge soiling 110 mm thick including cost of material, labour and T&P etc complete.
Earth work in filling for making ramp &streingthing ok kachcha road in all type of soil with all lift &lead of 180m i/call labours t&p etc.
Laying Brick on edge soiling on Ramp including cost of material, labour and T&P etc complete.
Laying Brick on edge soiling with old brick including cost of material, labour and T&P etc complete.
Earth work in Removing diversion with all lead &lift 30m i/c all labour,T&P etc complete.
C.C. in 1:1.5:3 including cost of material, labour and T&Petc complete.
Earth work infilling in all soil with all lift & lead of 600m & Embankment to 20.00 cm .layers i/c manual compation ramming, dressing surface to required levels & slope i/c all labour,T&P etc complete.
M/S KUNWAR ENGINEERING WORKS
dinesh kumar contractor
M/S Vishnu Raghav Construction
SKYHOMES INFRACON
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .