Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.3 LAccepted-AOC 664 8A1 TRIVANDRUM ROAD TIRUNELVELI 627 005 | TIRUNELVELI | TAMIL NADU | 627005 | ₹71.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹76.2 L+₹4.8 L (6.80%)Rejected-AOC 17 1 SANKAR COLONY PALAYAMKOTTAI TIRUNELVELI | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | ₹76.2 L+₹4.8 L (6.80%) | L2 | Rejected-AOC L2 |
| 3 | L3₹79.3 L+₹8.0 L (11.2%)Rejected-AOC | ₹79.3 L+₹8.0 L (11.2%) | L3 | Rejected-AOC L3 |
| 4 | L4₹80.1 L+₹8.8 L (12.3%)Rejected-AOC | ₹80.1 L+₹8.8 L (12.3%) | L4 | Rejected-AOC L4 |
| 5 | L5₹83.2 L+₹11.9 L (16.6%)Rejected-AOC | ₹83.2 L+₹11.9 L (16.6%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | NHA Associates L1 | N PERATCHI L3 | S MAHARAJAN L5 | M MOHAMMED HAKKIM L4 | MARSHAL VIGNESH & CO L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 183.24 | m3 | 96 ₹17,591.04 Lowest | 101.1 ₹18,525.56 | 116 ₹21,255.84 | 107.9 ₹19,771.6 | 105 ₹19,240.2 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 183.24 | m3 | 2,027.3 ₹3,71,482.45 Lowest | 2,277.89 ₹4,17,400.56 | 2,315 ₹4,24,200.6 | 2,277.8 ₹4,17,384.07 | 2,165 ₹3,96,714.6 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 1,832.4 | m2 | 73.9 ₹1,35,414.36 Lowest | 83 ₹1,52,089.2 | 85.6 ₹1,56,853.44 | 83 ₹1,52,089.2 | 80 ₹1,46,592 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 1,832.4 | m2 | 16.1 ₹29,501.64 Lowest | 18.11 ₹33,184.76 | 21.3 ₹39,030.12 | 18.05 ₹33,074.82 | 17 ₹31,150.8 |
| 5.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 5,377.6 | m2 | 23.9 ₹1,28,524.64 Lowest | 24 ₹1,29,062.4 | 30.6 ₹1,64,554.56 | 26.75 ₹1,43,850.8 | 25 ₹1,34,440 |
| 6.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 361 | m3 | 9,156.3 ₹33,05,424.3 Lowest | 10,288 ₹37,13,968 | 10,654 ₹38,46,094 | 10,288 ₹37,13,968 | 9,780 ₹35,30,580 |
| 7.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 Bitumen and 5.03kg of plastic waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate of required temperature and mixing the min required temperature incentral hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paverfinisher, Vibratory/ Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 217 | m3 | 9,480.6 ₹20,57,290.2 Lowest | 10,400 ₹22,56,800 | 11,050 ₹23,97,850 | 10,652 ₹23,11,484 | 10,126 ₹21,97,342 |
Tender Value
₹81 L
EMD Value
₹81,000
Closing Date
27 Jun 2025, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Package 2 Renewal of B.T. Surface at 1.Swimming pool 1st cross street, 2.Anbu Nagar South West 1st North Main Road, 3.Anbu Nagar South West - 2nd North Main Road, 4.Anbu Nagar South West East 1st Street, 5.Anbu Nagar South West East 1st Cross
2025_MAWS_571169_1
15/2025-26/2
Open Tender
Civil Works - Roads
Works
90 days
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹81,000
11 Aug 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 Bitumen and 5.03kg of plastic waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate of required temperature and mixing the min required temperature incentral hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paverfinisher, Vibratory/ Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
MARSHAL VIGNESH & CO (BID ID -1382592)
N PERATCHI (BID ID -1383855)
M MOHAMMED HAKKIM (BID ID -1383972)
S MAHARAJAN (BID ID -1384030)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .