| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹7.2 L+₹36,293.26 (5.29%)Accepted-Finance | ₹7.2 L+₹36,293.26 (5.29%) | L2 | Accepted-Finance L2 |
| 2 | L1₹6.9 LRejected-Finance | ₹6.9 L | L1 | Rejected-Finance ABOVE 20 PERCENTAGE |
| 3 | L3₹7.2 L+₹36,293.34 (5.29%)Rejected-Finance | ₹7.2 L+₹36,293.34 (5.29%) | L3 | Rejected-Finance L3 |
| 4 | L4₹7.3 L+₹39,703.82 (5.78%)Rejected-Finance | ₹7.3 L+₹39,703.82 (5.78%) | L4 | Rejected-Finance L4 |
| 5 | L5₹7.3 L+₹46,000.30 (6.70%)Rejected-Finance | ₹7.3 L+₹46,000.30 (6.70%) | L5 | Rejected-Finance L5 |
Tender Value
₹9.2 L
EMD Value
₹9,200
Closing Date
22 Apr 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER ( V P)
UNION PANCHAYAT OFFICE,ILAYANGUDI
Construction of Threashing Floor at South Samuthiram Village Drama Stage near in Samuthiram Panchayat
2025_RDTN_542285_1
ILY-AGAMT II 25-26- THREASING FLOOR SAMUTHIRAM PT
Open Tender
Civil Works
Item Rate
120 days
ILAYANGUDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,200
7 Jul 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
Amount
Construction of Threashing Floor at South Samuthiram Village Drama Stage near in Samuthiram Panchayat.
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials and labour charges etc complete
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost & conveyance of all materials and labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VELLAISAMY MUTHUKUMAR (BID ID -1312309)
GUNASEKARAN C (BID ID -1300904)
KARTHIKEYAN C (BID ID -1307700)
PRP ENGINEERING CONTRACTOR (BID ID -1292755)
K SENTHILMEENA (BID ID -1301867)
BALAKRISHNAN S (BID ID -1301794)
V KARUNAKARAN (BID ID -1301030)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .